HomeMy WebLinkAboutS-0201-G MapAF 1213
Fie PV?
/ass' l 5 67'04'4/°E
FT
I 1 1
/olEsmt .
1 1
I1 W1
01
I�
25'f3ui/din Line 1
I(Ty/oical) 1
I Lot 5 1
I205 .4c. � 1
o�
�I
I/5'Esmt
I C
C
I 37601
'1
I o�
12
V
V.
O
zi
Is 8ro4'411f F I.P
45/ 33'
75'*521051
,
/5/Z'
r
/1/otes:
1..411 easerre.-1f1s are to be Fcr
drainage ca7d ufi/i ty rpCases.
2. D/sta-/eG5 Shawn �g curved
lines are arc d/S1-_r3Ce6.
o?
0
19
3
N
0
a
IN
N
50' O' 50
si• a
Lot 2
Corporate Hi// Subd visiQ•,
F�l`rase Z•
Lot 3
awe Hi// Subdivision I
51.P
���I 0
N '5' E '
� FOP 353 (81
S -7�J551 5q' /
�'7
'Zo2 CJO
r-S 62'301/0'E 6O. 0'
F./.P.
i-0-C. l
A Parr of the SE 114 of the 5W 114. Section 3. Township 1 North. Range I3 Vast.
City of Little Rock. P••tankt Counq, Arkansas, being more particullarly described
as follows:
Ccmeacing at a found iron pin far the SW corner of the SE I/4. NV 1/4. of
said Section 3. Tovuship I North. Range 13 Vest; thence S 87'04'41" E. 169.35
feet to a found iron pin; thence H 02'01'32" E. 418.14 feet to the Point of
beginning; chance continue N 02'01'32" E. 360.0 fear to a found iron pia;
thence 3 117604'41" E. 451.33 fast to a farad iron pia, said iron pin being
the NV corner of Lot 2. Corporate Rill. Phase I (Instrument No. 83-11741);
rbenc• S 02'53'12" V along the seat line of said Lot 2 and the west line of
Lot 3, Corporate Hill, Phase II (Instrument No. 85-23420), 433.08 feet to a
found iron pia for the SW corner of said Lot 3; than along the soucharl7
properr7 line of said Lot 3, S 53*39*37" E. 163.27 feet to the Point of Curve
of a curve to the left, said curve having a radius of 172.50 feet; chance along
the are of said sad said southerly property line. 297.59 fast to a farad iron
pin. said iron pin being the SW corner of the right -of -..ay for Corporate gill
Drive, a 60 foot rlghe-of-way; said carom having a chord bearing and distance
of ■ 76'35'10' 1. 262.04 fast, these• leaving said curve. S 61'30"10' 1. along
the southwesterly right-of-way line of said Corporate Hill Drive. 60.00 fast
to a found iron pia, acid iron pia being the SE earner of the right-of-way
for said Corporate Hill Drive. said found iron pin lying on a curve. said curve
being coacsre to the Narthwase and having a radius of 232.50 feet; chance along
the arc of said curve 401.10 fast to the point of tamgaacq of said carve. said
carve having a chord bearing and distance of S 76'35'10" V. 353.13 fast; thence
Y 53'39'37" W. 333.68 feet to the Point of Carve of a curve co the left, said
curve having a radius of 20.0 fast, thence along the arc of said curve 15.50
feet, (said curve having a chard bearing and diatanc• of N 75*32-05" V. 15.12
leer), cc the Point of Coapo.asd Curve of a curve to the right. said carve
having a radius of 50.0 fast; tbance.along the arc of said curve 38.76 feet.
said curve having a chord bearing and distance of N 75'52'05" V, 37.30 fast;
cheat• leaving said curve S 52433'35" W. 281.27 feat to the Point of beginning,
containing 5.32 acres sure of less.
s
-leewiery, 5"-//-14
,Devised /0-7-8G
k>evsed
f
CORPORATF-' HILL.- VQD€ 1VltSI,OR#r
PHASE" III
VICINITY MAP
2
1000
WE, THE UNDERSIGNED, OWNERS OF THE REAL ESTATE SHOWN AND DESCRIBED
HEREIN, DO HEREBY CERTIFY THAT WE HAVE LAID OFF, PLATTED, AND SUB-
DIVIDED, AND DO HEREBY LAY OFF, PLAT, AND SUBDIVIDE SAID REAL ESTATE
IN ACCORDANCE WITH THIS PLAT.
'¢Pten.bew-29/9�� ���
DATE OF EXECUTION S�EH AME�AMEE
ADDRESS
SOURCE OF TITLE: D.R. '7 %Co PAGE 4-7 9
INSTRUMENT NO.
CERTIFICATE OF SURVEYING ACCURACY
11 Mlcitdel 5fCVen dCrhZk HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRE-
SENTS A BOUNDARY SURVEY MADE BY ME AND BOUNDARY MARKERS SHOWN HEREON
ACTUALLY EXIST AND THEIR LOCATION, TYPE;D T Rlpj< ARE C RECT SHOWN.
DATE OF EXECUTION
EGISTERE LAND SURVEYOR
0. lo_ ARKANSAS
CERTIFICATE OF ENGINEERING ACCURACY
I, ✓ nfi E• 67ardner , HEREBY CERTIFY THAT THIS PLAT CORRECTLY
REPRES TS A PLAN MADE BY ME, AND THAT THE ENGINEERING REQUIREMENTS
OF THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS HAVE BEEN COM-
PLIED WITH.
Z5 feel. /Q8G
DATE OF EXECUTION
EGISTERED PROFESSIONAL ENGINEER
NO, 3 2 5f ARKANSAS
CERTIFICATE OF FINAL APPROVAL
PURSUANT TO THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS, AND ALL
OF THE CONDITIONS OF APPROVAL HAVING BEEN COMPLETED, THIS DOCUMENT
IS HEREBY ACCEPTED. THIS CERTIFICATE IS HEREBY EXECUTED UNDER THE
AUTHORITY OF SAID RULES AND REGULATIONS.
r
DATE OF EXECUTION `SIGNED
LITTLE ROCK PLANNING COMMISSION
CERTIFICATE OF RECORDING
54'Cs3U ; 6
THIS DOCUMENT, NUMBER _ FILED FOR RECORD lO - 51 19 13C.
IN PLAT BOOK PAGE oi'7
ISIGNED
(NAME) CLERK
••1•,a n r,1 for,"
�%% ,bISTEg�O
''�STAiE if �%
: ANWS41 ,
FINAL PI
AT -� A T
if A Y rN3 A 1'6M
aIGISTiBE9
►R0FESS10XAL
ENGINEER
Q * a A41.
No.3251 �4V
�pti E. G PR�
MARKHAM STREET DEVELOPMENT
CORPORATE HILL SUBDIVISION
PHASE III
FINAL PLAT
VLS
Esia"10sT, SUMMERLIN SSSOCIATES, INC.
MSG engineers -planners
so.+ T a . LITTLE ROCK, ARKANSAS
860320 `
'Found j;.j� !a'
5W ccr.-5E NGs/%4
5ec.3, /-N, R-/3W
r
NOTED
Tr,