HomeMy WebLinkAboutS-0201-E Staff AnalysisNovember 10, 1981
SUBDIVISIONS
Item No. 4 - Corporate Hill Subdivision
LOCATION: 10101 West Markham
DEVELOPER: ENGINEER
Markham Street Summerlin Associates, Inc.
Joint Venture 1609 Broadway
200 Main Street Little Rock, AR 72206
Little Rock, AR 72201 Phone: 376-1323
Phone: 376-8005
AREA: 39.26 Acres NO. OF LOTS: 11 FT. OF NEW STS.: 1,474
ZONING: "0-2"
PROPOSED USE: Office Park
VARIANCES REQUESTED: 1. To permit a cul-de-sac with a
length of 1,474 feet.
2. To permit a horizontal curve
with 200' radius.
A. EXISTING CONDITIONS
This project is located in an area of mixed uses, which
includes Single Family, Multifamily, General Office
and Office/Instititional zonings. Specifically, the
site is bordered on the north by Markham, on the south
by I-630/I-430 Interchange, and on the east and west by
"R-2" and "0-3" zonings respectively. There is also a
small parcel designated for single family use on the
north end of the plat. The entire southern portion of
the plat, designated as "Tract A" lies in the floodway.
Utility companies that have commented at the time of
writing include Southwestern Bell and Water Works,
which have both requested additional easements.
B. DEVELOPMENT PROPOSAL
(1) This is a proposal to develop a tract with an area
of 39.26 acres into 11 lots for office park
development. Principal access to the various
platted lots will be provided by Corporate Hill
Drive, a cul-de-sac which provides 1,474' of new
street. The applicant has indicated that the area
designated as Phase 1 on the Plat will be finaled
first, and that the southern portion of the
property along Rock Creek and including Rock Creek
will be dedicated to the City.
f
November 10, 1981
SUBDIVISIONS
Item No. 4 - Continued
(2) Conformance to Ordinance Standards. Request for
variances include:
(a) permitting a cul-de-sac with a length of
1,4741; and
(b) permitting a horizontal curve with a 200'
radius.
Another possible variance will be discussed in
Staff Analysis.
(3) Legal Considerations. The wording in the Bill of
Assurance s ould read that the lands in Tract A of
said subdivision are hereby dedicated to the
public for utility, drainage, and park purposes.
Staff would also like to receive some type of
written comment from the title holder that the
land will be dedicated.
C. ENGINEERING CONSIDERATIONS
(1) Cul-de-sac street exceeds Subdivision Ordinance
requirements. Engineering Division does not
object to 1,500' length.
(2) Drainage facilities and easements proposed are not
subject to approval with the preliminary plat;
they will be reviewed during final design.
D. ANALYSIS
Staff is in agreement with the design concept proposed
and the variances requested. However, the plan fails
to meet one of the most basic of Ordinance
requirements, which is a site area of two acres for
each platted lot in "0-2" zoning districts. It is
recommended that the lot line on No. 10 be shifted so
that it will be in conformance, or that a variance for
lot depth be'requested. In conjunction with "0-2"
zoning, a site plan will be required before a building
permit is granted for the development on each of these
lots. Staff is also requesting that the initial final
plat reflect the lots in Phase 1, plus the portion of
the plat that will be dedicated to the City. In
addition to a 40' buffer, a 6' opaque fence is required
on the portion abutting areas zoned for residential
use.
STAFF RECOMMENDATION
Approval, subject to comments made.
November 10, 1981
SUBDIVISIONS
Item No. 4 - Continued
SUBDIVISION COMMITTEE ACTION
The applicant was present. A motion was made to approve the
plat and variances, subject to staff and Engineering's
recommendations. The vote was 2 ayes, 0 nays, 3 absent.
PLANNING COMMISSION ACTION:
The applicant was present. Mr. William Allen, owner of a
parcel of land that is completely surrounded by the plat,
voiced concern over the possibility of being landlocked.
Staff commented that in keeping with the usual policy, the
plat provided a 20' access easement to serve this parcel.
Staff reported also that the applicant had requested that
the portion of the plat to be dedicated to -the City be
reflected, not in Phase I as staff's recommendation
suggests, but at a later phase. The Commission asked that
the applicant provide the staff with a letter addressing
this. A motion in agreement with the Subdivision
Committee's recommendation of approval was made and passed
by a vote of 9 ayes, 0 noes, 2 absent.