HomeMy WebLinkAboutS-0200-S Staff AnalysisITEM NO.: 1.
NAME: Watershed Pointe Preliminary Plat,
S-200-S
LOCATION: located North of the Cantrell Road and Chenal Parkway intersection on the
Divide Parkway
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract list,
notice form with affidavit executed and proof of mailing. The notice must be mailed no
later than January 18, 2017. The Office of Planning and Development must receive the
proof of notice no later than January 27, 2017.
2. Is the proposal to develop the lots with Hillside Development standards? If so provide the
percent slope for the lots as calculated in Section 31-368.
3. Are the side and rear yard setbacks proposed to comply with the R-2, Single-family
zoning district?
4. Provide the source of title of the landowner in the general notes section of the preliminary
plat.
5. Will the lots be developed in a single phase? If not provide the proposed phasing plan.
6. Until the right of way for the Divide parkway is dedicated the City cannot and will not
review the preliminary plat. Without the right of way dedication there is not public access
to the proposed subdivision therefore the Commission cannot review and provide
approval of the preliminary plat request.
7. The Fire Code states one or two-family dwellings residential developments where the
number of dwelling units exceeds 30 shall be provided with separate and approved fire
apparatus access road.
Sec. 31-371. - Front yard setbacks. The minimum front yard setbacks shall conform to
the zoning ordinance except for areas with slopes in excess of eighteen (18) percent,
where they may be reduced to fifteen (15) feet.
Variance/Waivers: Advanced grading? — Reduced building setbacks?
Public Works Conditions:
1. The proposed subdivision has no legal access to public right-of-way.
2. Street names and street naming conventions must be approved by Public Works. Contact
Glenn Haley, 501.371.4537 or ghaley@littlerock.gov. The proposed street name has a
double suffix and does not agree with the unsigned final plat currently under review by the
City.
3. The proposed right-of-way width of 50-feet does not agree with the proposed right-of-way
of 45-feet shown on the unsigned final plat for Watershed Drive (Watershed Pointe Cove).
4. With site development, provide the design of street conforming to the Master Street Plan.
Construct street improvement to the street including 5-foot sidewalks with the planned
development. The paved pedestrian trail should be constructed from the Divide Parkway
ITEM NO.: 1. S-200-S
to the subdivision with access ramps and striping provided at street crossings. Is the
paved pedestrian trail proposed to continue through the subdivision?
5. The constructed street from Chenal Parkway to the proposed round -a -bout must be called
West Divide Parkway until the future connection is made to the existing Divide Parkway.
6. The round -a -bout with channelization should be constructed on Divide Parkway (West
Divide Parkway) prior to the platting of the lots within the subdivision.
7. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to
any land clearing or grading activities at the site. Other than residential subdivisions, site
grading and drainage plans must be submitted and approved prior to the start of
construction. Is an advanced grading variance being requested to grade the lots with the
construction of the street and drainage?
8. What is the proposed horizontal radius of Watershed Pointe Cove (Watershed Drive)?
150-feet is the minimum horizontal radius at centerline with a normal crown.
9. Stormwater detention ordinance applies to this property. Show the proposed location for
stormwater detention facilities on the plan. Maintenance of the detention pond and all
private drainage improvements is the responsibility of the developer and/or local property
owners association.
10.If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
11. Street improvement plans shall include signage and striping. Public Works must approve
completed plans prior to construction.
12. Streetlights are required by Section 31-403 of the Little Rock code of ordinances. Provide
plans for approval to Public Works, Traffic Engineering. Streetlights must be installed
prior to platting/certificate of occupancy. Contact Greg Simmons, 501.379.1813 or
gsimmons@littlerock.gov for more information.
13.A turnaround constructed in conformance with the Fire Code must be provided for
emergency and City vehicles at the end of the proposed street.
14.The proposed building line should be located at least 20 feet from the right-of-way so that
parked vehicles do not stick out into the right-of-way and block the public sidewalk.
15.All public drainage easements must be unobstructed and access provided to the public
right-of-way by constructed infrastructure and/or documented on the final plat.
16.100-year overflow swales must be constructed and placed within public drainage
easements.
Utilities and Fire Department/County Planning:
Little Rock Wastewater: Sewer main extension required, with easements, if new sewer
service is required for this project. Contact Little Rock Wastewater Utility for additional
information.
Entergy: Entergy does not object to this proposal. An existing three phase, power line exists
to the west of this property. It does not appear to be in conflict with the proposed
development. Contact Entergy in advance to discuss future service requirements, new
facilities locations and adjustments to existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
ITEM NO.: 1.
S-200-S
AT & T: No comment received.
Central Arkansas Water: No objection. All Central Arkansas Water requirements in effect at
the time of request for water service must be met.
Fire De artment:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the
minimum road width shall be 26 feet, exclusive of shoulders.
Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not
exceed 10 percent in grade except as approved by the fire chief.
Loading. Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire department
apparatus by way of an approved fire apparatus access road with an asphalt, concrete or
other approved driving surface capable of supporting the imposed load of fire apparatus
weighing at least 75,000 pounds.
Dead Ends. Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with
width and turnaround provisions in accordance with Table D103.4. Requirements for Dead-
end fire apparatus access roads.
One- or Two -Family Residential Developments. As per Appendix D, Section D107.1 of
the Arkansas Fire Prevention Code Vol. 1, One- or Two -Family dwelling residential
developments. Developments of one- or two-family dwellings where the number of dwelling
units exceeds 30 shall be provided with two separate and approved fire apparatus access
roads, and shall meet the requirements of Section D104.3.
Exceptions:
1. Where there are more than 30 dwelling units on a single public or private fire
apparatus access road and al dwelling units are equipped throughout with an
approved automatic sprinkler system in accordance with Section 903.3.1.1,
903.3.1.2 or 903.3.1.3 of the Arkansas Fire Code, access from two directions shall
not be required.
2. The number of dwelling units on a single fire apparatus access road shall not be
increased unless fire apparatus access roads will connect with future development,
as determined by the fire code official.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water (Jason
ITEM NO.: 1. S-200-S
Lowder501-377-1245) and the Little Rock Fire Marshal's Office (Capt. Tony Rhodes 501-918-
3757). Number and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning No comment.
Rock Region Metro: Location is not currently served by METRO but is on our long range
plans. We recommend pedestrian infrastructure be provided for access to the proposed
Chenal Express. The sidewalks will also provide needed community amenities.
Building Code: The 2012 AR Fire Prevention Code Vol. III for one (1) and two (2) family
dwellings requires foundations meet the following Sections of the Code. If the foundation
cannot be verified by the building official at the time of the footing inspection the building
official may require verification the foundation meets the required elevation by a licensed
engineer.
R403.1.7.3 Foundation elevation. On grade sites, the top of any exterior foundation shall
extend above the elevation of the street gutter at point of discharge or the inlet of an
approved drainage device a minimum of 12-inches (305 mm) plus two (2) percent.
R403.1.7.4 Alternate setback and clearances. Alternate setbacks and clearances are
permitted, subject to the approval of the building official. The building official is permitted to
require an investigation and recommendation of a qualified engineer to demonstrate that the
intent of this Section has been satisfied. Such an investigation shall include consideration of
materials, height of slope, slope gradient, load intensity and erosion characteristics of slope
material.
Please address any questions to the building inspectors at 501.371.4833 or 501.371.4834.
Plannina Division: No comment.
Landscape; No comment.
41
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the
additional information as noted above) to staff on Wednesday, January 18, 2017.
February 2, 2017
ITEM NO.: 1 FILE NO.: S-200-S
NAME: Watershed Pointe Preliminary Plat
LOCATION: Located North of the Cantrell Road and Chenal Parkway intersection on
the Divide Parkway
DEVELOPER:
PDC, LLC
16623 Cantrell Road, Suite 2A
Little Rock, AR 72223
FNr;INFFR-
White-Daters and Associates
24 Rahling Road
Little Rock, AR 72223
AREA: 23.2 acres NUMBER OF LOTS: 30
WARD: 5 PLANNING DISTRICT: 20 — Pinnacle
CURRENT ZONING: R-2, Single-family
VARIANCENVAIVERS:
FT. NEW STREET: 2,060 LF
CENSUS TRACT: 42.05
1. A variance from Section 36-254 to allow a 20-foot front platted building line.
2. A variance from the City's Land Alteration Ordinance to allow grading outside the
right of way with the installation of the basic infrastructure.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is seeking preliminary plat approval to allow the creation of
30 residential lots from this 23.2-acre tract. The lots are proposed near the
northeast corner of the Chenal Parkway and the Divide Parkway intersection.
The lots are indicated with an average lot size of 100-feet by 160-feet. The lots
are proposed with a 20-foot front building setback.
The request also includes a variance from the Land Alteration Ordinance to allow
grading outside the right of way with the installation of the basic infrastructure.
February 2, 2017
SUBDIVISION
ITEM NO.: 1 (Cont.)
B. EXISTING CONDITIONS:
FILE NO.: S-200-S
The site is located off the Divide Parkway, a constructed street which has not
been dedicated to the City, extending from Chenal Parkway to the north. The
site is heavily wooded located on top of a ridge running southeasterly. There is
vacant MF-12 zoned property to the south of the site. There is a City of Little
Rock wastewater treatment plant located to the north of this site. There are
single-family homes located on acreage (5+-acres) located to the west of this
site. South of the site, along Chenal Parkway, is a multi -family development.
There is also undeveloped commercial and office zoned property along Chenal
Parkway. To the west of the site is a multi -family development and a private
school accessed from the eastern portion of the Divide Parkway.
C. NEIGHBORHOOD COMMENTS:
All abutting property owners along with the Aberdeen Court POA and the
Duquesne Place POA were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. The proposed subdivision has no legal access to public right-of-way.
2. Street names and street naming conventions must be approved by Public
Works. Contact Glenn Haley, 501.371.4537 or ghaley@littlergck.gov. The
proposed street name has a double suffix and does not agree with the
unsigned final plat currently under review by the City.
3. The proposed right-of-way width of 50-feet does not agree with the
proposed right-of-way of 45-feet shown on the unsigned final plat for
Watershed Drive (Watershed Pointe Cove).
4. With site development, provide the design of street conforming to the
Master Street Plan. Construct street improvement to the street including
5-foot sidewalks with the planned development. The paved pedestrian trail
should be constructed from the Divide Parkway to the subdivision with
access ramps and striping provided at street crossings. Is the paved
pedestrian trail proposed to continue through the subdivision?
5. The constructed street from Chenal Parkway to the proposed round -a -bout
must be called West Divide Parkway until the future connection is made to
the existing Divide Parkway.
6. The round -a -bout with channelization should be constructed on Divide
Parkway (West Divide Parkway) prior to the platting of the lots within the
subdivision.
2
February 2, 2017
SUBDIVISION
ITEM NO.: 1 Cont. FILE NO.: S-200-S
7. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. Is an advanced
grading variance being requested to grade the lots with the construction of
the street and drainage?
8. What is the proposed horizontal radius of Watershed Pointe Cove
(Watershed Drive)? 150-feet is the minimum horizontal radius at centerline
with a normal crown.
9. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
Maintenance of the detention pond and all private drainage improvements is
the responsibility of the developer and/or local property owners association.
10. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
11. Street improvement plans shall include signage and striping. Public Works
must approve completed plans prior to construction.
12. Streetlights are required by Section 31-403 of the Little Rock Code
of Ordinances. Provide plans for approval to Public Works, Traffic
Engineering. Streetlights must be installed prior to platting/certificate
of occupancy. Contact Greg Simmons, 501.379.1813 or
gsimmonsCcNittlerock.gov for more information.
13. A turnaround constructed in conformance with the Fire Code must be
provided for emergency and City vehicles at the end of the proposed street.
14. The proposed building line should be located at least 20 feet from the
right-of-way so that parked vehicles do not stick out into the right-of-way
and block the public sidewalk.
15. All public drainage easements must be unobstructed and access provided
to the public right-of-way by constructed infrastructure and/or documented
on the final plat.
16. 100-year overflow swales must be constructed and placed within public
drainage easements.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Little Rock Wastewater: Sewer main extension required, with easements, if new
sewer service is required for this project. Contact Little Rock Wastewater Utility
for additional information.
3
February 2, 2017
SUBDIVISION
ITEM NO.: 1
O.: S-200-S
Entergy: Entergy does not object to this proposal. An existing three phase,
power line exists to the west of this property. It does not appear to be in conflict
with the proposed development. Contact Entergy in advance to discuss future
service requirements, new facilities locations and adjustments to existing facilities
(if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: No objection. All Central Arkansas Water requirements
in effect at the time of request for water service must be met.
Fire Department:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive of
shoulders.
Grade. Maintain fire apparatus access roads as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire
apparatus access roads shall not exceed 10 percent in grade except as
approved by the fire chief.
Loading. Maintain fire apparatus access road design as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed shall
be accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least
75,000 pounds.
Dead Ends. Maintain fire apparatus access roads at dead end locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet
shall be provided with width and turnaround provisions in accordance with Table
D103.4. Requirements for Dead-end fire apparatus access roads.
One- or Two -Family Residential Developments. As per Appendix D,
Section D107.1 of the Arkansas Fire Prevention Code Vol. 1, One- or Two -
Family dwelling residential developments. Developments of one- or two-
family dwellings where the number of dwelling units exceeds 30 shall be provided
with two separate and approved fire apparatus access roads, and shall meet the
requirements of Section D104.3.
El
February 2, 2017
SUBDIVISION
ITEM NO.: 1—(Cont.) FILE NO.: S-200-S
Exceptions:
1. Where there are more than 30 dwelling units on a single public or
private fire apparatus access road and all dwelling units are equipped
throughout with an approved automatic sprinkler system in
accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3 of the
Arkansas Fire Code, access from two directions shall not be required.
2. The number of dwelling units on a single fire apparatus access road
shall not be increased unless fire apparatus access roads will connect
with future development, as determined by the fire code official.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the
2012 Arkansas Fire Prevention Code. Section C101 — C105, in conjunction
with Central Arkansas Water (Jason Lowder501-377-1245) and the Little Rock
Fire Marshal's Office (Capt. Tony Rhodes 501-918-3757). Number and
Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: Location is not currently served by METRO but is on our
long range plans. We recommend pedestrian infrastructure be provided for
access to the proposed Chenal Express. The sidewalks will also provide needed
community amenities.
F. ISSUES/TECHNICAUDESIGN:
Building: The 2012 AR Fire Prevention Code Vol. III for one (1) and
two (2) family dwellings requires foundations meet the following Sections of the
Code. If the foundation cannot be verified by the building official at the time of
the footing inspection the building official may require verification the foundation
meets the required elevation by a licensed engineer.
R403.1.7.3 Foundation elevation. On grade sites, the top of any exterior
foundation shall extend above the elevation of the street gutter at point of
discharge or the inlet of an approved drainage device a minimum of 12-inches
(305 mm) plus two (2) percent.
R403.1.7.4 Alternate setback and clearances. Alternate setbacks and
clearances are permitted, subject to the approval of the building official. The
building official is permitted to require an investigation and recommendation of a
qualified engineer to demonstrate that the intent of this Section has been
satisfied. Such an investigation shall include consideration of materials, height of
slope, slope gradient, load intensity and erosion characteristics of slope material.
61
February 2, 2017
SUBDIVISION
ITEM NO.: 1 (Cont.) FILE NO.: S-200-5
Please address any questions to the building inspectors at 501.371.4833 or
501.371.4834.
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (January 11, 2017)
Mr. Brian Dale and Mr. Tim Daters of White Daters and Associates were present
representing the request. Staff presented an overview of the item stating there
were a few outstanding technical issues associated with the request. Staff stated
the Divide Parkway had not been dedicated to the City and requested the street
to be dedicated prior to any land clearing or grading activity on the site. Staff
questioned if the development was proposed utilizing hillside development
standards and if so the applicant should provide the development criteria as
outlined in Section 31-371 with regard to the percent of slope.
Public Works comments were addressed. Staff stated a grading permit was
required prior to any land clearing or grading activities on the site. Staff
requested a temporary turn -around be provided at the intersection of the Divide
Parkway and the new street accessing the subdivision and the wastewater
treatment plant. Staff requested the City's Stormwater Detention Ordinance
would apply to the development of the property. Staff stated streetlight
installation was required prior to the final platting of the proposed subdivision.
Rock Region Metro comments were addressed. Staff stated pedestrian
infrastructure should be provided for access to the proposed Chenal Express.
Staff stated the sidewalks would also provide community amenities for the future
residents.
Staff noted the comments from the various other departments and agencies.
Staff suggested the applicant contact the departments or agencies directly with
any questions or concerns. There were no more issues for discussion. The
Committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to staff addressing most of the
technical issues associated with the request raised at the January 11, 2017,
Subdivision Committee meeting. The applicant has provided the percent grade
for the proposed lots. The applicant has also indicated the Divide Parkway will
be dedicated to the City as a public street to the City prior to any construction or
grading activities on the site.
L
February 2, 2017
SUBDIVISION
ITEM NO.: 1 Cont. FILE NO.: S-200-S
The applicant is no longer seeking development of the lots utilizing the hillside
development standards as outlined in the Subdivision Ordinance. The applicant
is however requesting a front yard setback variance to allow the placement of a
20-foot front platted building line (Section 36-254 of the Little Rock Code of
Ordinances) along Watershed Pointe Cove. All other setbacks will comply with
the typical development standards of the R-2, Single-family Zoning District.
The proposal includes the development of 30 residential lots with an average lot
width of 100-feet and an average lot depth of 160-feet. The average lot size
proposed is 16,000 square feet. The R-2, Single-family zoning district typically
requires a minimum lot width of 60-feet, a minimum lot depth of 100-feet and a
minimum lot area of 7,000 square feet.
The plat includes the construction and dedication of 2,000 linear feet of new
residential street constructed within a 50-f000t right of way with 27-feet of
pavement. The source of water is Central Arkansas Water and the means of
wastewater disposal is Little Rock Wastewater Utility. There are no floodplains
or floodways located within the plat area.
The request also includes a variance from the Land Alteration Ordinance to allow
grading outside the right of way with the installation of the basic infrastructure.
Staff is supportive of the applicant's request. The applicant is seeking
preliminary plat approval to allow the development of 30 residential lots within a
23.20-acre site for an overall density of .77 units per acre. Although there is a
variance associated with the proposed preliminary plat staff does not feel the
variance to allow the reduced front yard setback of 20-feet will significantly
impact the proposed development. The development of lots with a reduced front
yard setback is common within this area of West Little Rock such as homes
being developed in Chenal, Bishop Place and within the Ranch. To staffs
knowledge there are no remaining outstanding technical issues associated with
the request. Staff will not issue a grading permit until the right of way for the
Divide Parkway is dedicated as a public street.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the variance request to allow a 20-foot front
platted building line (Section 36-254 of the Little Rock Code of Ordinances) for
the proposed lots.
7
February 2, 2017
UBDIVISION
FILE NO.: S-200-S
Staff recommends approval of the variance request from the Land Alteration
Ordinance to allow grading outside the right of way with the installation of the
basic infrastructure.
PLANNING COMMISSION ACTION: (FEBRUARY 2, 2017)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the variance
request to allow a 20-foot front platted building line (Section 36-254 of the Little Rock
Code of Ordinances) for the proposed lots. Staff presented a recommendation of
approval of the variance request from the Land Alteration Ordinance to allow grading
outside the right of way with the installation of the basic infrastructure. There was no
further discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 10 ayes, 0 noes and 1 absent.
0
January 31, 2019
ITEM NO.: 10 FILE NO.: S-200-
NAME: Watershed Point Preliminary Plat Time Extension
LOCATION: North of the Cantrell Road/Chenal Parkway intersection, on The Divide
Parkway
DEVELOPER:
PDC, LLC
16623 Cantrell Road, Suite 2A
Little Rock, AR 72223
OWNERIAUTHORIZED AGENT:
PDC, LLC
SURVEYOR/ENGINEER
White Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 23.2-acres
WARD: 5
CURRENT ZONING
VARIANCE/VVAIVERS:
NUMBER OF LOTS: 30
PLANNING DISTRICT: 20
R-2, single family
FT. NEW STREET: 2,060 LF
CENSUS TRACT: 42.05
1. A variance from Section 36-254 to allow a 20-foot front platted building line.
2. A variance from the land Alteration Ordinance to allow grading outside the right-of-
way with the installation of the basic infrastructure.
BACKGROUN
On February 2, 2017, the Commission approved a preliminary plat to allow for
development of a 30-lot single family residential subdivision on this 23.2 acre tract. The
proposal included the construction of 2,060 linear feet of new public street. The average
lot size was proposed as 16,000 square feet with an average lot width of 100 feet and an
average lot depth of 160 feet. The R-2 district minimum standards are a lot size of
7,000 square feet with minimum lot widths and depths of 60 feet and 100 feet respectively.
January 31, 2019
SUBDIVISION
ITEM NO.: 10 Cont. FILE NO.- S-200-S
The proposed density was .77 units per acre. The request also included a variance from
the Land Alteration Ordinance to allow grading outside the right-of-way with the
installation of the basic infrastructure. Approval was granted with the following conditions:
1. A grading permit will not be issued until the right-of-way for The Divide Parkway is
dedicated as public street.
2. Compliance with the comments and conditions outlined in paragraphs D, E and F
of the agenda staff report.
3. Approval of the variance #o allow a 20-foot front building line.
4. Approval of a variance form the Land Alteration Ordinance to allow grading outside
the right-of-way with installation of the basic infrastructure.
Development of the proposed subdivision has not occurred.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is now requesting approval of a time extension of the commission's
approval of the preliminary plat. Section 31-94 (e) of the Subdivision Ordinance
states:
A preliminary plat approved by the planning commission shall be effective and
binding upon the commission for two (2) years from the date of approval or as long
as work is actively progressing, at the end of which time the final plat application
for the subdivision must have been submitted to the planning staff. Any plat, not
receiving final approval within the period of time set forth herein or otherwise
conforming to the requirements of this chapter shall be null and void, and the
developer shall be required to submit a new plat of the property for preliminary
approval subject to all zoning restrictions and this chapter.
The planning commission may extend the original preliminary approval for a period
not to exceed one (1) additional year when it can be demonstrated that there are
no changes in the plat design or neighborhood that warrant a complete review.
B. EXISTING CONDITIONS:
There has been no change to the site or surrounding properties since the February
2017 approval. The site is heavily wooded, located on top of a ridge. There is
vacant MF-12 zoned property to the south. A City of Little Rock wastewater
treatment plant is located to the northeast. Single family homes on acreage are
located to the west. The property to the east is undeveloped. No changes are
proposed in the preliminary plat from that approved by the pla.nning commission
on February 2, 2017.'
2
January 31, 2019
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: S-200-S
C. STAFF RECOMMENDATION:
Staff recommends approval of the requested one year time extension subject
to compliance with all comments, conditions and approvals from the initial
February 2, 2017 preliminary plat approval.
PLANNING COMMISSION ACTION: (JANUARY 31, 2019)
The applicant was present. There were no objectors present. Staff presented the item
and a recommendation of approval as outlined in the "staff recommendation" above.
There was no further discussion. The item was placed on the consent agenda and
approved as recommended by staff, including all staff comments and conditions. The vote
was 10 ayes, 0 noes and 1 absent.
KI