Loading...
HomeMy WebLinkAbout18-013 MapTOTAL SITE AREA = 3.88 ACRES /::' nrA`. TOTAL DISTURBED AREA = 0.10 ACRES T(C , .- ` .- NEW GAS SERVICE BY XXXXXX PROTECT SANITARY NEW IMPERVIOUS SURFACE - 2604 SF "TH PT #3 SE41ER LINE 24 HOUR EMERGENCY CONTACT: CHIP PATTERSON (W) 404 934 2724 PT #4 oint. _i..cU7e Point .# Northing Easting I 128798.89 1218963.38 2 128759.39 1219221,93 3 129 329.00 1219173, 69 5 12-1295.45 1219151 .04 4 11 29340.81 1219091.45 3 29289.33 ' L 19098,62 12 129181.49 1219092,65 1 1 129239.37 1219169.03 0 129233.40 1219276.86 6 129320.05 1219335.43 7 129297.84 1219352.58 8 129136.10 1219343, 62 9 129028.27 1219337.66 GENERAL NOTES 1. LENGTH OF RIP RAP SHALL BE SIX TIMES THE DIAMETER OF THE STORM DRAIN. 2, EROSION CONTROL MEASURES ARE TO BE ACCOMPLISHED PRIOR TO ANY OTHER CONSTRUCTION ON THE SITE, AND ARE TO BE MAINTAINED UNTIL PERMANENT GROUND COVER IS ESTABLISHEO. 3. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION. 4. ALL DISTURBED AREAS ARE TO BE GRASSED AS SOON AS CONSTRUCTION PHASE PERMITS. 5, CUT AND FILL SLOPES ARE NOT TO EXCEED 3H : 1V. 6, NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS, AND OTHER TRAFFIC CONTROL MEASURES AS DEEMED NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE WIDENING OF AND CONSTRUCTION ON PULASKI COUNTY ROADS. 7. THE CONTRACTOR SHALL FIELD LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE BEGINNING OF WORK. THE CONTRACTOR SHALL NOTIFY PROJECT ENGINEER OF ANY DISCREPANCIES BETWEEN ACTUAL FIELD INFORMATION AND DESIGN INFORMATION SHOWN ON THESE PLANS. 8. ALL CONSTRUCTION MUST CONFORM TO CITY OF LITTLE ROCK STANDARDS AND SPECIFICATIONS. 9. CONTRACTOR SHALL CONTACT THE UTILITIES PROTECTION CENTER AT ARKANSAS 811 FOR MARKING OF ALL UNDERGROUND UTILITIES, 10. THE CONTRACTOR SHALL REVIEW PLANS FOR DEMOLITION REQUIREMENTS. UNSALVAGEABLE MATERIALS AND PREVIOUSLY DUMPED WASTE MUST BE REMOVED FROM THE SITE BY THE CONTRACTOR IN A LEGAL. MANNER. THE CONTRACTOR WILL NOT BE ALLOWED TO BURY OR BURN ANY DEBRIS ON SITE. 11. EROSION CONTROL MEASURES ARE TO BE ACCOMPLISHED PRIOR TO ANY CONSTRUCTION ON SITE AND MAINTAINED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12.FIRE HYDRANTS MUST BE OPERATIONAL AND UNDER PRESSURE PRIOR TO THE BEGINNING OF COMBUSTABLE CONSTRUCTION AS SPECIFIED IN THE INTERNATIONAL FIRE PREVENTION CODE. I Arkansas) One Call `, I f.., 1 I l I , .� W• 1 {Yi l.. s,. 1 1 11 COMPRESSOR PAD/EQUIPMENT CROSS SLOPE 1.9% BOLLARDS ® PAD SHT. C-6 L SPACED 4' O.C. LOCATED 2' FROM E.O.P DOUBLE SMM GATE SMT. C - 5 LP-1 3/4-CNG-SST-DC C-303C C-207 C-2098 MOUNTING POLE MP-1EXTENDED TRUSS COL. CONDUIT TRENCH PER ELECTRICAL DWGS EXISTING FIRE HYDRANT120 20 I _ r PT # 1 ;Ir,r 401 rI 1 (IDI OTTC'n c..A ..,._ 259 NEW GAS SERVICE BY XXXXXX ==1- MOUNTING POLE MP-3 EXTENDED TRUSS COL. 3/4-CNG-SST-DC C-303E C-207 C-209D PT #7 MOUNTING POLE MP-4 I ESD-10 ESD 11 ,l :5 y I OVERHEAD TRUSSES a�i r /:,)1 .00 NK 0 75 30 60 90 120 vision - Solutions - Yslue CONSULTANT: Patterson Engineering Company .., C .i .r r+ r•Ll�;^I]7EC1i 1228 Sunnyslope Court Auburn, Alabama 36832 Phone: (404) 934-2724 cp@pattersoncompany.net SEAL: til SATOE 1� ARKA PR NGIZONAL NEER it** � ..!rs CLIENT: l:30f `F, to&% WASTE MANAGEMENT I- C) Cie N ti Q ,n Z N Q Sz t � Wa O 0, I- O W Q J N J h ca/) F z r &Q J Z Q � ,i Z 0 J 0 O LLI Q U LU 00 Q >< N 0 O O D- cr N c-, Lo u LU o U t= o w J 01 (h DJ � J J c co J O J U Ir-- U Q a REVISIONS: SETISSUE: DATE: 1 30% SUBMIT. 01/05/17 2 FOR PERMIT DATE: - PROJECT#: - DRAWN BY: CMP CHECKED BY: - CMP APPROVED BY: FILENAME: C-2 SHEET 2 OF 6