Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
17-053 Map 4
SET ROOTFLARE 3" ABOVE FINISH GRADE REMOVE CONTAINER OR BURLAP & WIRE FROM TOP 3 OF ROOTBALL BACKFILL PLANTING PIT WITH PREPARED PLANTING SOIL MIX AS SPECIFIED WATER WHEN PLANTING TO ELIMINATE ALL VOIDS TREE STAPLES OR TREE STAKES- INSTALL PER MANUFACTURER'S DIRECTION MODEL 1812-PRS POP-UP SPRAY -PVC LATERAL LINE SBE-050 BARBED ELBOW �-1/2" SWING PIPE PVC 1/2" THREADED TEE 1 INSTALLATION DETAIL 12" POP-UP SHRUB SPRAY M:\2015 - -Villas est Ivl . 2" BARK MULCH CREATE MULCH RING OF 3" DEPTH AT OUTER MULCH FINISH GRADE UNDISTURBED OR COMPACTED SUBGRADE 2 X ROOTBALL DIAMETER I, 1' MINIMUM CLEARANCE ON ALL SIDES CONTAINER BALLED & BURLAPPED FINISH GRADES --TURF PLANTING BED FINISH GRADE 3" DEPTH HARDWOOD MULCH, BRASS NIPPLES WILKINS 975XL BACKFLOW PREVENTER BRONZE Y-STRAINER BRASS TEE & 3/4" HOSE BIB HOT BOX HB2S - FIBERGLASS ENCLO GFI RECEPTICLE WITH 90WATT HEATING CABLE ® 120VAC; 1 PHASE I.D. = 471 X 13"W X 28'H ELECTRICAL CONDUIT STUDDED "T" FENCE POST 24" TYP. b T COPPER UNION (PAINTED BLUE) COPPER RISER PIPE 18" TYP GATE VALVE IN DRAIN PORTS PAVEMENT 36" TYP. VALVE BOX o — FINISH GRADE 7,.,,,,,.,.,y;a:.;-;:; _FINISH GRADE CONCRETE BASE 4" X 58"L X 24"W 24" € E RED. BUSHING FROM 3 (if required.) SLEEVE 18" MINIMUM 'SOLVENT WELD CAP 24" MAXIMUM METER NOTE: BACKFLOW PREVENTER MUS 2" PVC MAINLINE MOUNTED A MIN OF 12" ABOVE FIN. GRADE. INSTALLATION DETAIL �� INSTALLATION DETAIL TYPICAL SLEEVING J RP -TYPE BACKFLOW PREVENTER JISH GRADE MULCH LAYER PREPARED SOIL. JNDISTURBED SUBGRAI 1/8 " X 4" STEEL EDGING 16" STEEL STAKE AT 5' O.C. .I r-r— UNDISTURBED SUBGRADE 14 GAGE SHALL BE THE MIN. WIRE SIZE TAPE AND BUNDLE TIE A LOOSE 20" LOOP IN ALL WIRING 24 VOLT WIRING AT CHANGES OF DIRECTION GREATER AT 10' INTERVALS THAN 300. UNTIE ALL LOOPS AFTER CONNECTIONS HAVE BEEN MADE. (V (V LATERAL CONTROL WIRES MAIN SUPPLY NOTES: BACKFILL MATERIAL FOR TRENCHES TO BE BROUGHT TO SITE FROM SAME SOURCE AS THE TOPSOIL LAYER BACKFILL MATERIAL SHALL BE FREE FROM ROCKS OR HEAVY UNSUITABLE SUBSTANCES WHICH COULD DAMAGE THE PIPE OR CREATE UNUSUAL SETTLING PROBLEMS. BACKFILL SHALL BE DONE IN SIX INCH LAYERS AND TAMPED DOWN AFTER EACH LAYER IS PUT BACK TO PREVENT EXCESSIVE SETTLING. 4 INSTALLATION DETAIL MAINLINE, LATERAL & WIRING SCA E 2 Y °9Rk A N.S P%5; ' "ignu 11110'� LANDSCAPE DETAILS © WHITE-DATERS & ASSOCIATES, INC. Villas r�%n CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING West 24 RAHLING CIRCLE LITTLE ROCK, ARKANSAS 72223 Survey By: Drawn By: Checked Ey: Approved By: LITTLE ROCK, ARKANSAS Revised Date 08-28-17 Scale Hor. Vert. Sheet L04 of L04 Job No. 15-5711J , 612,i/Lull 1:5u:4t5 Him, F uI-Creator 2.p