Loading...
HomeMy WebLinkAbout18-069 Map1i 1 i,a 14- 101 III 1� 1 110— 71'-0•-- ---_ RETANW WALL ((YPE T 01) r :'.'..::::: ... ........................ MARCH,-.'.'.'.'.'.'.:'.'.'.'.'.'.'.'.'.'.'.':.'.':.-.'.'.':.".'.'. 1fi6.3B2 ' - ... EXISTING e 'et^'.yi.y •8'. 'd'^"'.:R , f'a'. •4. i.. •'6 - y' �'i.'. .y ., 1?,.,. e S° • _ - _ _ � — — _— _ s EXISTING BUILDING FF ELEV = 363.08' AREA - 1 AREA - 3 AREA, 2 N p Q ST �000;;'m swp�j LEGEND - - — EXISTING CONTOUR SURVEYED BY: PROPOSED CONTOUR H'i or - N BUILDING OUTLINE CURB, SIDEWALK AND MARKINGS 5800 Evergreen Drive SCALE: 1" = 10'. Little Rock, AR 72205 NEW CONCRETE SIDEWALKS Ph (501) 663-8800 101 5' 0 10 Fax (501) 588-0123 NEW ASPHALT SURFACE www.harborenv.eoin NEW CONCRETE RETAINING WALLS NEW SOD AREAS TP TOP OF PAVEMENT TW TOP OF WALL SW SIDEWALK IMPROVEMENTS NOTES CON STRUCTION NOTES 1. ALL THREE CONSTRUCTION AREAS ARE DESIGNED TO COMPLY WITH ADA ACCESSIBILITY RE QUIREMENT EME NT AS SPECIFIED. E IFIED 2. FINAL SLOPES WITHIN 25' OF THE ADA PARKING SHALL BE MAXIMUM 2% IN ALL DI RECTIONS. ONS3:MAXIMUM ALLOWABLE SLOPES. 5/LONGITUDINAL AND° CROSS. 4. CONTRACTOR SHALL STRICTLY FOLLOW THE GRADING LAN. 5. MANY ELEVATION POINTS ARE GIVEN IN ALL THREE AREAS AS AN AID TO LAYOUT THE PARKING LOT. CONTRACTOR SHALL CHECK THE SLOPES OF THE FINAL SURFACE OF THE BASE. 6. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY CONFLICT BETWEEN THE DESIGNED SLOPE AND ADA REQUIRED SLOPES IS NOTICED. 7. CONTRACTOR SHALL REQUEST ENGINEERS APPROVAL OF THE FINISHED GRAVEL SURFACE BEFORE ASPHALT PAVING. 8. SAVED GRAVEL MATERIAL FROM DEMOLITION SHALL BE REUSED FOR COMPACTED GRAVEL BASE. 9. DO NOT DISTURB BASE OR SUBGRADE MATERIAL IF CUTTING IS NOT REQUIRED. 10. IN THE AREAS, WHERE FILLING IS REQUIRED, CONTRACTOR MAY USE GRAVEL MATERIAL. 11. INSTALL SOD WITH BERMUDA GRASS IN THE PROPOSED SOD AREA. 12. USE STRAWBALE/ SANDBAG FOR SEDIMENT CONTROL AS NECESSARY. SAFETY NOTES 13. CONTRACTOR SHALL FOLLOW OSHA REGULATION TO ENSURE SAFETY DURING THE CONSTRUCTION PERIOD. 14. CONTRACTOR SHALL PROVIDE TEMPORARY SAFE ACCESS TO THE BUILDING DURING THE CONSTRUCTION PERIOD. 0 7 f3 w 11 1' z 12 A B C D E F G H M N a Q R S 12