Loading...
HomeMy WebLinkAbout14-034 Map 3c 0 E 0 3 tL DO DO Q M7 N OD 0 04 a Q F- Q J c 0 E 3 T 0 ED m a 6 LO 04 cli ro 0 z Z X D- ` HOT TAP EXISTING 8" WATER ' \ MAIN WITH 1 TAPPING SLEEVE ' AND VALVE PER LOCAL UTILITY COMPANY REQUIREMENTS p � 3' X 17' \ LANDSCAPED PROVIDE 3/4" WATER LINE I AREA FOR IRRIGATION, COORDINATE EXACT LOCATION WITH LANDSCAPE CONTRACTOR INSTALL 6' HIGH WOOD \ PRIVACY FENCE ALONG PROPERTY LINE CONDENSER 1 \ /HVAC PAD SIDEWALK CONCRETE 3 - C620 SIDEWALK _ SINGLE CART •' v° PROPOSED FAMILY 3 5' CONCRETE WIDTH CART C620 EGRESS SIDEWALK CORRAL 8't ITYPE G FAMILY DOLLAR DOLLAR BUILDING LONG) : °. _ v _ ILLUMINATED PYLON v SIGNAGE REAR EXIT 8,320 SQ.FT. DOOR (#2) 104' X 80' F.F.=296.00'� v �I ENTRY DOOR p DELIVERY DOOR _ : 9 O I - O2 v WITH CANOPY C620 HANDICAP RAMP a V PROVIDE 3/4" DOMESTIC WATER ' �. p=2��)" '00`\� v- LINE TO WITHIN 5' OF THE b PROPOSED BUILDING FOR TIE IN, SEE SITE CONNECTION NOTE CONCRETE FLUME 2 / (TYPICAL) C640 2 DUMPSTER, ti INSTALL TWO � � � P' •' ' � 0 v v DUMPSTER PAD WAY CLEAN OUT v SEE ARCHITECTURAL ° O FOR DETAILS ° -° PAVED''' HANDICAP ACCESS'� Q , - - ° LIGHTED v AISLE AND SYMBOL C620 /� (O d LOADING ° : ° v ',q °_ - °� - _ INSTALL NEW SIDEWALK " AREA v AS REQUIRED TO TIE v TO EXISTING SIDEWALK '9 - ° ° WITH ADA ACCESSIBILITY ,,• ,��' / OQ c LANDSCAPED ° a ' AREA C v ° a �nV- v � xOp ° ° LANDSCAPED h' V AREA IN TALL - ° •✓: ° 8' TRANSITION FROM 2" HIGH o PROVIDE 4" SANITARY SEWER �7 �3 ° v CLEAN OUT / v ° MODIFIED CURB TO EXISTING u - LINE TO WITHIN 5' OF THE v S v ° a r� ,� ° ROADWAY CURB, TYPICAL BOTH o PROPOSED BUILDING FOR TIE ° v SIDES OF DRIVEWAY U ' ::IN, SEE SITE CONNECTION NOTE //1 LINE. ZONE ° .� o 6" DIAMETER PIPE 5 1 : J c fL0p0a L I BOLLARD TYPICAL C620 v �%° 2" HIGH MODIFIED CURB PER ' OF 4 .::::.:;.• v Ix �4 ARKANSAS DEPARTMENT OF TRANSPORTATION STANDARD 2 CONCRETE FLUME DRIVEWAY CONNECTION, TYPICAL 5:: v C640 (TYPICAL)•:•::' - BOTH SIDES OF DRIVEWAY TIE-IN TO SEWER MANHOLEING 4: �� INV. ADJUST AND RAISE - - 6' WIDE CONCRETE APRCN, - N_ MANHOLE TOP TO ELEV.=295.03 - AROANSAS DEPARTMENTE7F _ TRANSPORTATION STANDARD DRAWING DR-1 N INSTALL NEW SIDEWALK rn 3 AS REQUIRED TO TIE ° APPROXIMATE LOCATION OF 100 YEAR FLOOD ZONE (ZONE AE; To EXISTING SIDEWALK .L., (6A5EPLOODfaVATLOM234.5I WITH ADA ACCESSIBILITY 300 300 HORIZONTAL SCALE: i" = 40' VERTICAL S(.A_� - 1" = 4' 0+00 1+00 SANITARY SEWER SERVICE PROFILE 295 I_.. DESIGN GRADE EXISTING GRADE EXISTING SEWER MANOLE ADJUST TOP TO ELEV.=295.03 INV. NE=280.46 8" PVC INV. SW=280.46 8" PVC INV. W=290.00 6" PVC 295 290 285 280 275 INV.=292.8 ' O 2-6�% S_OPE _ 290 285 280 275 rn N vi N � N a N 0' 10' 20' 40' GRAPHIC SCALE 1" = 20' ARKANSAS ONE CALL THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND UTILITIES PRIOR TO ANY CONSTRUCTION (INCLUDING BUT NOT LIMITED TO: WATER LINES, SEWER LINES, ELECTRICAL AND TELECOMMUNICATION LINES, AND FIBER OPTIC CABLES.) ARKANSAS ONE CALL SYSTEM SERVICE AT: 1-800-482-8998 OR www.arkonecall.com AT LEAST 3 DAYS BEFORE ANY CONSTRUCTION PAVEMENT LEGEND DENOTES HEAVY DUTY CONCRETE PAVEMENT (SEE ° CONCRETE PAVEMENT DETAIL)- DOES NOT INCLUDE DUMPSTER PAD AREA DENOTES HEAVY DUTY CONCRETE PAVEMENT FOR DUMPSTER PAD (SEE CONCRETE PAVEMENT DETAIL) DENOTES LIGHT DUTY CONCRETE PAVEMENT FOR PARKING AREA (SEE CONCRETE PAVEMENT DETAIL) \\\\\ \ \\\\\DENOTES HEAVY OR DRIVEWAY APRON DWI HINUTY OTHE CITY NCRETE POFELITTLE MENT FROCK \ \ RIGHT-OF-WAY (SEE CONCRETE PAVEMENT DETAIL) SITE NOTES < w 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR THIS PROJECT PRIOR TO a COMMENCEMENT OF ANY CONSTRUCTION OR DEMOLITION. 2. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION TO PREVENT DAMAGE TO ALL TREE ROOTS DURING ENTRENCHING AND ANY OTHER CONSTRUCTION THAT MAY ENDANGER THE HEALTH OF THE _ TREES ACCORDING TO THE LOCAL MUNICIPALITIES REQUIREMENTS. H 3. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ANY AND ALL UTILITY COMPANIES IN MACHADO P ATA N 0 REGARDS TO UTILITIES THAT MAY NEED TO BE RELOCATED AS PART OF THIS WORK. 4. CONTRACTOR SHALL PROVIDE PROPER TRAFFIC CONTROL WARNING SIGNS THROUGH THE DURATION C I V I L OF THE PROJECT. ALL SIGNAGE SHALL BE IN ACCORDANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), LATEST EDITION. ■ E L E C T R I C A L w ■ M E C H A N I C A L 5. CONTRACTOR SHALL NOTIFY ALL AGENCIES AT LEAST SEVENTY-TWO (72) HOURS IN ADVANCE OF $ U R V E Y N G ANY ROAD CLOSINGS. HIS NOTIFICATION SHALL INCLUDE, BUT NOT BE LIMITED TO, POLICE, FIRE z I AND SCHOOL ALONG WITH ALL REGULATORY AND GOVERNMENTAL AGENCIES. w 1641 Popps Ferry Rd., Suite A-4 Biloxi, Mississippi 39532 6. CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC NOTICE OF EACH ROAD CLOSING. CONTRACTOR SHALL FOLLOW ALL GUIDELINES FOR PUBLIC NOTICE AS ESTABLISHED BY CITY, COUNTY AND/OR w Office 228.388.19501 Fax 228.388.1971. STATE OFFICIALS. ANY DELAY IN CONSTRUCTION DUE TO CONTRACTOR NOT NOTIFYING THE PROPER www.mpeng.0 AUTHORITIES OR NOT FOLLOWING THE REGULATORY AGENCY REQUIREMENTS SHALL BE THE F CONTRACTOR'S RESPONSIBILITY. 7. IF TRAFFIC INTERRUPTIONS ARE REQUIRED, THEY SHALL BE KEPT TO A MINIMUM AND THE SCALE: SHOWN CONTRACTOR SHALL BE SUBJECT TO LOCAL LAWS IN REGARDS TO TRAFFIC INTERRUPTIONS. PROJECT NO.: 0171.14.004 8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF TREES SHOWN TO REMAIN. a DRAWN BY: RCP CONTRACTOR SHALL PROTECT TREES AS REQUIRED BY THE LOCAL MUNICIPALITIES TREE ORDINANCE AND/OR LAND DEVELOPMENT CODE CHECKED BY: GWK FILE: PRODUCTION 9. ALL PERVIOUS AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE NEW SOD OR SHALL BE o SEEDED OR MULCHED. MINIMUM, AFTER COMPLERON AND APPROVAL OF WORK IN THAT AREA, a 10. CONTRACTOR SHALL INSTALL HANDICAP PARKING, SYMBOLS AND RAMPS PER A.D.A. REQUIREMENTS. o z s 11. CONTRACTOR SHALL STRIPE ALL HANDICAP PARKING SPACES BLUE. ALL OTHER STRIPING SHALL BE 0 d WHITE. 12. CONTRACTOR SHALL INSTALL CONCRETE CONTRACTION JOINTS ON 10'-0" CENTERS, EXCEPT SIDEWALKS CONTRACTION JOINTS WHICH SHALL BE 5'-0" ON CENTER. m UD o 13. CONTRACTOR SHALL INSTALL 1/2" THICK EXPANSION FIBER BOARD BETWEEN THE SIDEWALKS AND W N OTHER CONCRETE STRUCTURES. o Q Ln 14. ANY EXISTING SITE DEBRIS AND/OR EXISTING STRUCTURES SHALL BE COMPLETELY REMOVED PRIOR z w TO CONSTRUCTION AS PER DEMOLITION PLAN. m LU UTILITY NOTES z Jcn 1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING LOCATIONS OF ALL PROJECT RELATED UTILITIES, a LU BURIED AND ABOVE GROUND, REGARDLESS OF INCLUSION ON THESE PLANS. THE LOCATIONS OF z i ANY EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE W FOR DETERMINING THE EXACT LOCATIONS OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK.Uj ALL CONTRACTOR DAMAGED UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. w oo 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH OTHER TRADES FOR TIE IN LOCATION o AND SIZE/FLOW REQUIREMENTS FOR WATER AND SEWER TIE IN. TIE IN LOCATIONS AND SIZES ARE N o J W SUBJECT TO CHANGE BASED ON ARCHITECTURAL AND PLUMBING PLANS. o o L> 3. CONTRACTOR SHALL NOTIFY THE APPROPRIATE UTILITY AT LEAST 48 HOURS PRIOR TO COMMENCING z V d CONSTRUCTION HAVING POTENTIAL IMPACT TO THE UTILITY'S STRUCTURE. z 4. WATER SERVICE SHALL BE MAINTAINED TO ALL EXISTING CUSTOMERS; IF ANY SERVICE MUST BE a a INTERRUPTED, THE AFFECTED CUSTOMERS SHALL BE NOTIFIED AT LEAST 48 HOURS IN ADVANCE BY = i� THE CONTRACTOR. o Ln oa 5. CONTRACTOR SHALL PROVIDE A MINIMUM COVER OF 36", MINIMUM, ON ALL WATER MAINS. � J za 6. NEW WATER MAIN SHALL MAINTAIN 18 VERTICAL SEPARATION BETWEEN WATER MAIN AND STORM a o "' DRAIN PIPES, WHERE CROSSINGS OCCUR. WATER MAIN SHALL BE ROUTED OVER STORM PIPE to„ a W! WHEREVER POSSIBLE. w Q ww J V' 7. ALL WATER LINE FITTINGS 4 INCHES IN DIAMETER AND LESS SHALL BE OF THE SAME MATERIAL AS _- z o a O THE PIPE (i.e„ PVC) AND SHALL BE CONSISTENT THEREWITH IN STRENGTH, DIMENSIONS AND "' < H V FUNCTION. w o tog !� Z 8. CONTRACTOR SHALL INSTALL THRUST BLOCKS AT ALL BENDS AND FITTINGS (SEE DETAIL SHEET). o m O 9. CONTRACTOR SHALL INSTALL LOCATOR WIRE AROUND ALL NEW INSTALLED PIPE AND FITTINGS. a 10. ALL PROPOSED POTABLE WATER LINE FIRINGS, FIRE HYDRANTS AND ALL OTHER Q WATER LINE PIPING w LL J MATERIALS AND FITTINGS FOR THIS PROJECT SHALL BE AWWA APPROVED. 3 0 0 11. CONTRACTOR SHALL INSTALL ALL WATER LINES AND FITTINGS AS PER MANUFACTURER'S INSTALLATION w o a =' O O RECOMMENDATIONS. z w L az r Q T O 12. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH BUILDING CONTRACTOR FOR LOCATION i. OF ALL UTILITY ENTRANCES AND CONNECTIONS. of V LLB 13. CONTRACTOR SHALL PROVIDE WATER AND SEWER SERVICE TO WITHIN FIVE (5) FEET OF THE BUILDING '1 o J W AT THE REQUIRED LOCATION AS DIRECTED BY THE BUILDING CONTRACTOR. O O J V 14. EXISTING WATER AND SANITARY SERVICE LINES SHOWN ARE APPROXIMATE LOCATIONS ONLY. �r U CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING THESE LINES LOCATED AND COORDINATE TIE IN �a W �l W LOCATIONS WITH HE BUILDING CONTRACTOR. m s o �k' 1"' /V�1 15. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXISTING BUILDING SANITARY SEWER PIPE V oz (n ELEVATION AND DETERMINE THE ELEVATION REQUIRED TO CONNECT TO THE EXISTING SEWER LINES. z Q 0 0 16. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL SEWER LINES TO INSURE POSITIVE FLOW OF SEWER LINES. z V+ J 17. THESE PLANS ARE SUBJECT TO APPROVAL BY THE LOCAL GOVERNING MUNICIPALITY AND ANY OTHER w GOVERNING AUTHORITY. w x t" co 18. ENGINEER HAS ATTEMPTED TO UTILIZE APPARENT EXISTING UTILITIES ON THE SITE, HOWEVER THE FUNCTION OR FEASIBILITY OF UTILIZING THESE APPARENT UTILITIES HAS NOT BEEN FIELD VERIFIED. o THE ENGINEER DOES �I WARRANT TO THE OWNER OR THE CONTRACTOR THAT THESE UTILITIES CAN r k BE USED. THIS SHOULD BE FIELD VERIFIED BY THE CONTRACTOR AND BE ACCOUNTED FOR tz i APPROPRIATELY IN THE COSTING OF THE PROJECT. m z Q Z >a U) UNDERGROUND UTILITIES NOTE � i 0 „`, > N CONTRACTOR SHALL VERIFY LOCATIONS OF ALL PROJECT RELATED UTILITIES, BURIED AND ABOVE GROUND, REGARDLESS OF INCLUSION ON THESE PLANS. THE LOCATIONS OF ANY EXISTING UTILITIES SHOWN ARE I z APPROXIMATE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION o w OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. ALL CONTRACTOR DAMAGED UTILITIES SHALL BE a REPAIRED AT THE CONTRACTOR'S EXPENSE. o SITE CONNECTION NOT M N= rn � o Z r g N SITE CONTRACTOR SHALL BE RESPONSIBLE FOR STUB OUT OF ALL UTILITIES TO WITHIN 5' OF THE PROFESSIONAL SEAL BUILDING. SITE CONTRACTOR SHALL COORDINATE LOCATION AND STUB OUT REQUIREMENTS PER o a ARCHITECTURAL/PLUMBING/ELECTRICAL, ETC. PRIOR TO COMMENCEMENT OF CONSTRUCTION. TIE IN o LOCATIONS WERE SHOWN AS PER SURVEY OR LOCATED/PROVIDED BY LOCAL UTILITY AUTHORITY AND w EXACT LOCATIONS HAVE NOT BEEN VERIFIED. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING o z paa0000 LOCAL UTILITY DEPARTMENT TO VERIFY LOCATION OF SEWER AND WATER CONNECTIONS. StpTE OF o z w ppp AR AN AS o wo 00� N� 0 C� 4 ESTIMATED QUANTITIES 5' THICK CONCRETE PAVING (LIGHT DUTY) 5,068t SQ.FT. 78t C.Y. 6" THICK CONCRETE PAVEMENT (HEAVY DUTY) 11,267t SQ.FT. 209t C.Y. 7" THICK CONCRETE PAVEMENT (HEAVY DUTY DUMPSTER PAD AREA) 694t SOFT. 15t C.Y. MISCELLANEOUS CONCRETE PAVEMENT (SIDEWALK, MECHANICAL PADS, FLUMES, ETC.) 1,567t SQ.FT. N/A 6" CONCRETE VERTICAL CURB 663t LN.FT. N/A <� 99T AL p as ER w o G�40 opp0 No.1557 PgQpDOU CD on W. K1� oop CD o �00000� w w� o� w z DRAWING NO.: <� U w of C200 � U SHEET 6 OF 14 �w a Q VERIFY SCALES zd `= tJ BAR IS ONE INCH ON ORIGINAL DRAWING i.. IF NOT ONE INCH ON THIS SHEET, ADJUST