HomeMy WebLinkAbout14-091 Map 39911111?ia
201
ES 8wATER (PRNA7'L7
UiI ITY
EES�TT
INST N0. 20�14Hi•I848
SSW
EX CONCRETE PAVEMENT
EX 8" S3 (PUBLIC)
Ex aFR
EX SIDEWALK
1 J
s
EX 33Fm
ev.
IRK-
I
I
r
0
m F1
410 S.
x UNIVERSITY AVE. Z
a�
Al
RETAIL J
1 I FF= 395.00
a' I
}IA
REFER TO PLUAONG
A , PLANS FOR CON77NUA77ON
fx x FL 4' SS- J87.SD
w .
x
;..
I EX STEPS
REF : 70 8UILDING 5' a
PLANS {OR CONNECTION - C? 7
TO SUBFLOOR DRAIN
FL 6'= 389.00 81
1 cl
w 1
I,+
Igo
r
INSTALL 2" WATER METER spa
} ' - IN EXIST METER BOX & 1 INSTAU 66 LF-
CONNECT 70 EXIST F7PWa 6" SD 0 6.55%
REMOVE PLUG & CONNECT
TO EXIST 12" SO
EX 2 DOM BEGIN 6" SO
FL 60. 384.68
r`t' 6" FIRE F7 EX 120 384,18 (VERIFY)
�z•
EX 13FR
E�t
SSMH I t MS ./11061403
i
!
i
r ;
INSTALL
DOUBLE„ ° .
MT
CLEANOUT -TRANS -� -11 NO 220110614D
1 YF �
-EX 4� SS _ ��-
__ REMOVE PLUG & CONNECT
TO EX 4' SS
INSTALL:
PEEN WALL 2-4"x4S' BEND
FL EX 4"= 384.23 (VERI!^
ICL
STORM DRAIN GENERAL NOTES
1. STANDARDS AND SPECIFICATIONS: ALL MATERIALS, CONSTRUCTION
METHODS, WORKMANSHIP, EQUIPMENT, SERVICES AND TESTING
FOR IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE
GOVERNING AUTHORITIES' ORDINANCES, REGULATIONS,
REQUIREMENTS, STATUTES, SPECIFICATIONS AND DETAILS, LATEST
PRINTING AND AMENDMENTS THERETO.
2. TRENCH SAFETY: THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR SITE TRENCH SAFETY DURING ALL PHASES OF
CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO HAVE A TRENCH SAFETY SYSTEM PLAN PREPARED
IN ACCORDANCE WITH OSHA REQUIREMENTS BY A PROFESSIONAL
ENGINEER LICENSED IN THE STATE OF ARKANSAS FOR THE
IMPLEMENTATION OF TRENCH SAFETY CONTROL MEASURES THAT
WILL BE IN EFFECT DURING THE CONSTRUCTION OF THE PROJECT
FOR ALL TRENCHES DEEPER THAN FIVE (5) FEET.
3. LOCATION OF EXISTING UTILITIES: THE CONTRACTOR SHALL FIELD
VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING
UTILITIES PRIOR TO START OF CONSTRUCTION AND SHALL NOTIFY
THE CONSTRUCTION MANAGER AND ENGINEER OF ANY CONFLICTS
DISCOVERED. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING
EXISTING UTILITIES (SHOWN OR NOT SHOWN) WITHIN THE AREA OF
CONSTRUCTION.
4. PROTECTION OF EXISTING UTILITIES: THE CONTRACTOR SHALL
MAKE NECESSARY PROVISIONS FOR THE SUPPORT AND
PROTECTION OF ALL EXISTING UTILITIES (POLES, LINES, CABLES,
STRUCTURES, ETC.) LOCATED BOTH ABOVE AND BELOW THE
GROUND,
S. LOCATION OF PROPOSED DRAINAGE IMPROVEMENTS: THE
CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS
SHOWN, INCLUDING THE HORIZONTAL AND VERTICAL LOCATION OF
CURB INLETS AND GRATE INLETS AND ALL UTILITIES CROSSING THE
STORM SEWER.
B. STORM DRAIN PIPE: UNLESS OTHERWISE NOTED ON THE PLANS,
ALL PIPES FOR PRIVATE STORM DRAIN IMPROVEMENTS SHALL BE AS
FOLLOWS:
a. 18" AND GREATER: REINFORCED CONCRETE PIPE (RCP), CLASS
III,
b. 3" THROUGH 15": PVC SCHEDULE 40, SDR-35, OR HIGH DENSITY
POLYETHYLENE PIPE (HOPE), N-12.
7. EMBEDMENT: EMBEDMENT FOR STORM DRAINAGE PIPE, PUBLIC AND
PRIVATE, SHALL BE IN ACCORDANCE WITH THE GOVERNING
AUTHORITIESSTANDARD DETAILS
a. BENDS & WYES: PREFABRICATED BENDS AND WYE$ SHALL BE USED
ON ALL PIPE CONNECTIONS AND JUNCTIONS.
9. CONCRETE COLLARS: CONCRETE COLLARS SHALL BE INSTALLED AT
ALL CHANGES IN CONDUIT SIZE AND AT ALL JOINTS THAT ARE
PULLED IN EXCESS OF THAT RECOMMENDED BY THE CONDUIT
MANUFACTURER.
WATER GENERAL NOTES
1. STANDARDS AND SPECIFICATIONS: ALL MATERIALS,
CONSTRUCTION METHODS, WORKMANSHIP, EQUIPMENT, SERVICES
AND TESTING FOR ALL IMPROVEMENTS SHALL BE IN ACCORDANCE
WITH THE CENTRAL ARKANSAS WATER UTILITY COMPANY
REGULATIONS, REQUIREMENTS, STATUTES, SPECIFICATIONS AND
DETAILS, LATEST PRINTING AND AMENDMENTS THERETO, UNLESS
OTHERWISE NOTED.
2. TRENCH SAFETY: THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR SITE TRENCH SAFETY DURING ALL PHASES OF
CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO HAVE A TRENCH SAFETY SYSTEM PLAN PREPARED
IN ACCORDANCE WITH OSHA REQUIREMENTS BY A PROFESSIONAL
ENGINEER LICENSED IN THE STATE OF ARKANSAS FOR THE
IMPLEMENTATION OF TRENCH SAFETY CONTROL MEASURES THAT
WILL BE IN EFFECT DURING THE CONSTRUCTION OF THE PROJECT
FOR ALL TRENCHES DEEPER THAN FIVE (5) FEET.
3. LOCATION OF EXISTING UTILITIES: THE CONTRACTOR SHALL FIELD
VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING
UTILITIES PRIOR TO START OF CONSTRUCTION AND SHALL NOTIFY
THE CONSTRUCTION MANAGER AND ENGINEER OF ANY CONFLICTS
DISCOVERED. THE CONTRACTOR IS RESPONSIBLE FOR
PROTECTING EXISTING UTILTIES (SHOWN OR NOT SHOWN) WITHIN
THE AREA OF CONSTRUCTION.
4, PROTECTION OF EXISTING UTILITIES: THE CONTRACTOR SHALL
MAKE NECESSARY PROVISIONS FOR THE SUPPORT AND
PROTECTION OF ALL EXISTING UTILITIES (POLES, LINES, CABLES,
STRUCTURES, ETC.) LOCATED BOTH ABOVE AND BELOW THE
GROUND.
S. RECORD PLANS: THE CONTRACTOR SHALL MAINTAIN AN ACCURATE
RECORD OF THE INSTALLATION OF ALL WATER LINES, FIRE
HYDRANTS, VALVES, SERVICES, ETC, THE CONTRACTOR SHALL
PROVIDE A COPY OF THE RECORDS TO THE ENGINEER FOR
PREPARATION OF THE 'RECORD DRAWING' PLANS.
S. COVER OVER PIPE: THERE SHALL BE A MINIMUM COVER OF 42'
FROM THE TOP OF THE PIPE TO THE EXISTING GROUND OR THE
PROPOSED FINISHED GRADE, WHICHEVER IS GREATER,
7. THRUST BLOCK: ALL BENDS SHALL BE RESTRAINED WITH THRUST
BLOCK IN ACCORDANCE WITH THE GOVERNING AUTHORITIES'
STANDARD SPECIFICATIONS AND DETAILS,
8. TRENCHES: TRENCHES SHALL BE BACKFILLED WITH MATERIAL IN
ACCORDANCE WITH CENTRAL ARKANSAS WATER STANDARD
SPECIFICATIONS AND DETAILS.
9. SEPARATION FROM SANITARY SEWER: WATER LINES SHALL BE
PLACED NO CLOSER THAN 10 FEET TO SANITARY SEWER LINES IN
COMPLIANCE WITH T.C.E.O- REQUIREMENTS.
10. VALVES: VALVES SHALL BE FURNISHED AND INSTALLED IN
ACCORDANCE WITH THE CENTRAL ARKANSAS WATER STANDARDS
AND SPECIFICATIONS -
III. FIRE HYDRANTS: FIRE HYDRANTS SHALL BE FURNISHED AND
INSTALLED IN ACCORDANCE WITH CENTRAL ARKANSAS WATER &
CITY OF LITTLE ROOF FIRE DEPARTMENT STANDARDS AND
SPECIFICATIONS.
12. METERS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR
CONTACTING AND COORDINATING WITH CENTRAL ARKANSAS
WATER FOR THE INSTALLATION OF THE WATER METERS.
1.1. WATER SERVICES: THE CONTRACTOR SHALL VERIFY THE EXACT
LOCATION OF WATER SERVICES WITH THE BUILDING PLANS.
14. TESTING AND STERILIZATION: ALL WATER LINES AND
APPURTENANCES SHALL BE STERILIZED AND TESTED IN
ACCORDANCE WITH GOVERNING AUTHORITIES' SPECIFICATIONS
FOR ACCEPTANCE.
Know what's below.
Cali before you dig.
,r ,t
REGISTERED
PROFESSIONAL
ENGINEER
0 10' 20` 40'
1 "=20'
SANITARY SEWER GENERAL NOTES
1. STANDARDS AND SPECIFICATIONS: ALL MATERIALS, CONSTRUCTION
METHODS, WORKMANSHIP, EQUIPMENT, SERVICES AND TESTING
FOR ALL IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE
LITTLE ROCK WASTEWATER UTILITY DEPARTMENT REGULATIONS,
REQUIREMENTS, STATUTES, SPECIFICATIONS AND DETAILS, LATEST
PRINTING AND AMENDMENTS THERETO, UNLESS OTHERWISE NOTED.
2. TRENCH SAFETY: IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO HAVE A TRENCH SAFETY SYSTEM PLAN PREPARED
IN ACCORDANCE WITH OSHA REQUIREMENTS BY A PROFESSIONAL
ENGINEER LICENSED IN THE STATE OF ARKANSAS FOR THE
IMPLEMENTATION OF TRENCH SAFETY CONTROL MEASURES THAT
WILL BE IN EFFECT DURING THE CONSTRUCTION OF THE PROJECT.
3. PROTECTION OF EXISTING UTILITIES: THE CONTRATOR SHALL MAKE
NECESSARY PROVISIONS FOR THE SUPPORT AND PROTECTION OF
ALL EXISTING UTILITIES (POLES, LINES, CABLES, STRUCTURES, ETC.)
LOCATED BOTH ABOVE AND BELOW THE GROUND.
4. RECORD PLANS: THE CONTRACTOR SHALL MAINTAIN AN ACCURATE
RECORD OF THE INSTALLATION OF ALL. SANITARY SEWER LINES,
MANHOLES, SERVICES, ETC. THE CONTRACTOR SHALL PROVIDE A
COPY OF THE RECORDS TO THE ENGINEER FOR PREPARATION OF
THE "RECORD DRAWING' PLANS.
S. SANITARY SEWER MAINS: ALL SANITARY SEWER MAINS SHALL BE
PVC SDR 35, ASTM D 3034, UNLESS NOTED OTHERWISE.
6, TRENCHES: TRENCHES SHALL BE BACKFILLED WITH MATERIAL IN
ACCORDANCE WITH THE LITTLE ROCK WASTEWATER UTILITY
DEPARTMENT STANDARD SPECIFICATIONS AND DETAILS.
7. WATER
A ER CROSSINGS: A I ALL SANITARY SEWER MAINS SHALL HAVE ONE
(1) 21-FOOT JOINT CENTERED ON EITHER SIDE OF WATER MAINS
WHERE A CROSSING OCCURS.
8. DEBRIS; SANITARY SEWER LINES SHALL BE KEPT CLEAR OF BROKEN
CONCRETE, DIRT OR ANY OTHER DEBRIS RESULTING FROM
CONSTRUCTION OPERTATIONS.
9. SANITARY SEWER SERVICES: THE CONTRACTOR SHALL VERIFY THE
SIZE AND THE EXACT LOCATION OF SANITARY SEWER SERVICES
WITH THE BUILDING PLANS. THE CONTRACTOR SHALL TIE A 1" WIDE
PIECE OF RED PLASTIC FLAGGING TO THE END OF EACH SEWER
SERVICE AND SHALL LEAVE A MINIMUM OF 36° OF FLAGGING
EXPOSED AFTER BACKFILL.
10. TESTING: ALL SANITARY SEWER LINES AND APPURTENANCES
SHALL BE TESTED IN ACCORDANCE WITH LITTLE ROCK
WASTEWATER UTILITY DEPARTMENT SPECIFICATIONS FOR
ACCEPTANCE
ti
12 l o/ Ik
0 i
v,
BENCHMARKS:
1. CHISLED SQUARE IN SW CORNER OF CURB INLET AT THE
SOUTHWEST CORNER OF MCKINNEY & 3RD STREETS
ELEV. 415-58'