HomeMy WebLinkAbout20-028 Map- -
iu' Pubilr R.LI111-u1-W.
i _ I �ti
),Ilal[ P•n ll)' \. ,Eil i;
"i+LTic '- •• -- r., -
__ Cin �u..:+Ju 11r,11 �j.+'rT..�1+E:I
�
(.orn�i
_
OHIO STREET
~
.i5'13'.-KI ;\`;
li-
BLACK STEEP EDGING(TY-�
_arc
~ 4.
�4r
IS G 26" CAL
�1
_ ___-L_-_�-
OAK TR MAIN
D OAK S-SHUMARiF-
BLIK STEEL EDGING
-
r
��
-
y l 7-DWARF YAUPON HOLLY'
•.�
1 i C
3 GAL Ir Irr MIN le O-.
y EXISTING 2!" CAL I 900,
J
l
OAK TREE TO REMAIN f. MIMMR
PLANTING
.IIV/
BERMUDA 50D F(j'7j STRIP
7-DWARF YAUPON HOLLY
GAL IB" HT MIN 36' QC.
� - EXISTING 30" CAL
y = OAK TREE TO REMAIN
J//
f .n
•y
_ _ � m II
-
/f
_
lilj�cl 13rcl��rrh-
_ m
nI
r—
�.
I
EXISTING 16" CAL
CRAPE MYRTLE TREE TO REMAIN
■
EXISTING 22' CAL
I CRAPE MYRTLE TREE TO REMAIN I
;
I
I -SWEET BAY MAGNOLIA
i
y
I 2" CAL
i
4,
1"-SOFT RUSH i
-
1
'24 OC
y
I
I.SWEET BAY MAGNOLIA
it
i
r[AL I
i 0
� 1
R
I
1
.1 1=LQ 04" G J' �Ill�
i — E
E
�E -_
E
EXISTING 20" CAL
SUGARBERRY TREE TO REMAIN I
i
I
� o
1
i
i
� i
�
7-DWARF YAUPON HOLLY
3 GAL IB' HT MIN 3'- O.0
d-0WARF YAUPON HOLLY
GAL IB" HT MIN 36" O-C y<
I
1 ~
r �
' I -SWEET BAY MAGNOIRI-1�
® 2" CAL
I
' I t
��. 1+I
I
m
' I
m � �
I
m
~�BERMUOASOD (TYR) ----
t"SWEET BAY MAGNOLIA
2" CAL
m (
m
i
BERMUD SOD (TYP)
EXISTING 34" CAL - - - - "
OAK TREE TO REMAIN
�ISWEETBAY MAGNOLIA
2' CAL - ----`'
EXISTING DENSE UNDERSTORY ■
S VEGETATION TO REMAIN \
EXISTING 26" CAL
4 OAK TREE TO REMAIN I / / EXISTING 30" (AL ------------�
TRI MAGNOLIA TREE TO REMAIN
MATCHLINE r
E D G
Ecological Design Group, Inc
Pnon.:
4TTLEeeCM sI ResERsel Wvu.E
N 86039'42 rr W
OYIDE EEAMU6A SOD FOR
15TUE8 AR w T \BR
cZ- L / h`-i . _R PLAN IT*
D DENI D
r EXISTING CAL 18 +
/ SUGARBERRY TREE TO REMAIN try. n;;t Nppy,_-.•s �@jDV!_
.. � { . o r Lail a■Iwoyeu �q:
' I
O
Z:
''TALL WOOD _
FENCE MATCHLINE
_ ��Y
-IIIIIIIIIIIIIII ■..■ .._� _ �. ,art. � -R�-- �
�
1
.
I
I:
BERMUDA SOD (TYP)
O
I i OYR7E BERMUDA SOD FOR
O
TUP BED AN FAS
I
T
I EXISTING DENSE UNDERSTORY
V I
I VEGETATION TO REMAIN
C
•
1
Z
L
��
alLLI
1 ! �
Y .
=
4+
wr)
j
I
[rto rpiJDC1 Y, zi-oa9
PATE 2p21 pe,2]
II
LANDSCAPE PLAN
SCALE I— 10'-r
PHASE
Construction
Documents
I
m 20, 40
vfl
TITLE
Landscape Plan
jv
NORTH I—
o, v
sIrtLT.w i ffl t,
LANDSCAPE NOTES
I, CONTRACTOR SHALL CONFIRM THE LOCATION OF ALL UTUTIES
PRIOR TO STARTING ANY WORK. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ARKANSAS ONE -CALL TO CONFIRM ALL
UTIUTIES,
3. ALL PLANTS MUST BE HEALTHY, VIGOROUS AND FREE OF PESTS AND DISEASE
3, STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND
SHALL CONSTITUTE MINIMUM QUAUTY REQUIREMENTS FOR PLANT MATERIAL
4. ALL PLANTS MUST BE CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED ON THE PLANT LIST.
S. ALL PLANTS ARE SUBJECT TO THE APPROVAL OF THE LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER CONSTRUCTION.
6 ALL PLANTING AREAS MUST BE COMPLETELY MULCHED WITH A 4" LAYER OF ORGANIC HARDWOOD MULCH. MULCH SHALL NOT
BE PLACED IMMEDIATELY ADJACENT TO TREE TRUNKS, BUT SHALL BE KEPT AT LEAST 3" FROM ROOT COLLAR AT THE SOIL LINE
7, ALL PLANTING BEDS SHALL BE CONTAINED BY EDGING MATERIAL OTHER THAN VEGETATION,
B PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND
SHALL AVOID DAMAGE TO ALL UTIUTIES DURING THE COURSE OF THE WORK THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING
ANY AND ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC WHICH OCCURS AS A RESULT OF THE LANDSCAPE
CONSTRUCTION AT NO COST TO THE OWNER
14, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK
15. THE CONTRACTOR IS RESPONSIBLE FOR FULLY MAINTAINING ALL PLANTING MATERIAL (INCLUDING BUT NOT LIMITED TO:
WATERING, SPRAYING, MULCHING, FERTILIZING, ETC.) IN ALL PLANTING AREAS AND LAWN AREAS UNTIL THE WORK IS ACCEPTED IN
TOTAL BY THE OWNER.
16. THE CONTRACTOR SHALL COMPLETELY GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE (1) YEAR BEGINNING ON THE
DATE OF TOTAL ACCEPTANCE THE CONTRACTOR SHALL PROMPTLY MAKE ALL REPLACEMENTS BEFORE OR AT THE END OF THE
GUARANTEE PERIOD,
17- ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOUATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK SHALL BE
PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES. QUANTITY, AND SIZE AND MEETING ALL
PLANT LIST SPECIFICATIONS
10. ONCE INSTALLED, LANDSCAPING SHALL BE MAINTAINED IN HEALTHY LIVING CONDITION AND ALL PLANT MATERIAL THAT DIES
SHALL BE REPLACED.
19. NOTIFY LANDSCAPE ARCHITECT OR DESIGNATED REPRESENTATIVE OF ANY LAYOUT DISCREPANCIES PRIOR TO ANY PLANTING.
LOCATE ALL UTILITIES AND SITE LIGHTING CONDUITS BEFORE CONSTRUCTION BEGINS
20. MAINTENANCE THE CURRENT OWNER OF THE PROPERTY SHALL BE RESPONSIBLE FOR THE ONGOING MAINTENANCE OF
REQUIRED LANDSCAPING
IRRIGATION GENERAL NOTES
IRRIGATION CONTRACTOR SHALL INSTALLALL EQUIPMENT AS PER MANUFACTURER'S CURRENT SPECIFICATIONS AND RECOMMENDATIONS.
COORDINATE EXACT LOCATIONS OF WATER METER. BACKFLOW PREVENTER, CONTROLLER AND CLIMATE SENSOR WITH THE ARCHITECT AND GENERAL
CONTRACTOR
CONTRACTOR SHALL CAREFULLY VERIFY A MINIMUM RESIDUAL WATER PRESSURE OF 70pM @ 60gpor, CONTRACTOR SHALL NOTIFY THE OWNER IF WATER
PRESSURE IS LESS THAN NOTED,
WHEN TRENCHING UNDER THE DRIPLINE OF EXISTING TREES EXTREME CARE MUST BE GIVEN TO AVOID ROOT DAMAGE IF AT ALL POSSIBLE AVOID TRENCHING
INSIDE THE DRIPLINE BY GOING AROUND THE TREE RATHER THAN UNDER IT. INSTALL PIPING AND SPRINKLERS ON THE INSIDE OF NEW CURBLINES IF POSSIBLE IF
TRENCHING MUST OCCUR UNDER THE DRIPUNE, USE EITHER TUNNELING OR HAND -DIGGING METHODS RATHER THAN A MECHANICAL TRENCHER. MINIMIZE
THE IMPACT OF ROOT SEVERING BY AVOIDING CONSTRUCTION DURING HOT, DRY WEATHER, KEEPING TREES WELL WATERED BEFORE AND AFTER DIGGING
AND COVERING ROOTS WITH SOIL OR MULCH AS SOON AS POSSIBLE
CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES CAUSED TO ALL UTILITIES (BOTH OVERHEAD AND BELOWGROUND) DURING THE IRRIGATION
INSTALLATION, CONTRACTOR SHALL SEEK THE ASSISTANCE AT LOCAL UTILITIES AND THE OWNER IN THE LOCATION OF THE UTILITIES PRIOR TO PERFORMING
TRENCHING OPERATIONS IN THE WORKING AREA
NEVER CUT LEADER
TRIM UP TO 113 OF
BRANCHES. RETAINING
THB NATVk& VtkP%
OF THE TREE
SET TOP OF ROOT BALL
3' ABOVE FINISH GRADE
BUILD 4- HT. SAUCER AROUND
PLANTING PIT WITH TOPSOIL
PROVIDE (3)
6' - T DIA LODGE POLES
FOR TREE GUYING
REVIEW IN FIELD TO INSURE SAFETY
TRIPLE HAMMERED NATIVE
-
COLOR HARDWOOD MULCH
3' DEPTH
4' CLEAN STRAIGHT
TRUNK NO LIMBS
PROVIDE FERTILIZER TABLETS
AND MYCO111HIZAE AS REQUIRED
KEEP MULCH 6•
CLEAR OF TRUNK
MIX
PLANTINGAS APPROVED
PLAN
I I Irl I I —1 I I� I I
VERIFY SUBGRADE WILL DRAIN FRACTURE ROCK IF NOT
I CANOPY TREE PLANTING / STAKING
•E.3.300 S Y149 $0 IN TIkGK7 TOAND
LRY ry53Y SOD 1H 71GRIr TO C-V,
(—_)l SOD INSTALLATION
NTS
E I D I G
EcaNgical Design Group, Inc
��c�c�lc4-Fcw
R bon e:ie 3TB 020D
UTTLEnocx SIO ROGERS I IINNE
r11SCRP
T 1T7
K7 .
c_
ry' DI AtIM �H
Know what, below.
Ce11 before YOU dig
WINTERIZATION SHALL BE DONE USING A COMBINATION OF MANUAL DRAIN VALVES IN THE LOW POINTS OF THE MAINUNE, AUTOMATIC DRAIN VALVES ON
LATERAL UNESAND WRAPPING BACKFLOW PREVENTER WITH HEATTAPE INSIDE THE ENCLOSURE
REFER TO PLANT
J
IS -SPACING WlOAT1r Muhcrl3 mmO
PLANTSED ALUMINUM ECI
O
ALL FVC MAINLINE SHALL BE PVC SCH40, LATERAL UNES FVC CL200,
ALL PVC FITTINGS SHALL BE SCH40 FVC TYPE I AND MUST BE OF DOMESTIC MANUFACTURE PVC SOLVENT CEMENT AND PRIMER SHALL BE AS RECOMMENDED I
R WALK EDGE REF PUN
FINISH GRADE
APPROVED BY THE MANUFACTURER OF THE PIP
APPRE
I• ABOVE TURF
O
CONTRACTOR SHALL INSTALL A TRACER WIRE ABOVE ALL MAINLINE PIPING. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
PLANTW 11_11I .SSANDY
2
N
INSTALL SPRINKLERS WITH CHECK VALVE FEATURE TO AVOID LOW- HEAD DRAINAGE FROM SPRINKLERS AT LOWER ELEVATIONS PROGRAM CONTROLLER WITH
;
tmROOT
LO AND BBB X�CO ONLY
as PH FOR AZAIFA6 ONLY
e�_IWA
�
(u
'CYCLE+SOAK' FEATURE AS REQUIRED TO ALLOW WATER TO INFILTRATE SOIL AND ELIMINATE RUN-OFF.
in
COMPACTED PUNT HIM BELOW
BAILVI1
eA
Ism'
IRRIGATION NOTE SLEEVING NOTES
`
THE IRRIGATION CONTRACTOR SHALL PROVIDE A FULLY THE GENERAL CONTRACTOR SHALL PROVIDE SCH40 FVC SLEEVING, BURIED
AT A MINIMUM OF IB" AND MAXIMUM OF 24" DEPTH
SHRUB RU B AND G RO U N DCOVE R PLANTING
a
OPERATIONAL CONVENTIONAL IRRIGAITON SYSTEM. THE
O
IRRIGATION CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
Nis
FOR REVIEW AND APPROVAL ALL PLANTING AREAS SHALL UPON COMPLETION OF SITE FI W NG AND COMPACTION OPERATIONS,
RECEIVE DRIP IRRIGATION, TREES SHALL RECEIVE BUBBLERS, AND PRIOR TO THE OFOF FOUNDATIONS, ROADWAYS,
T
T
AND SOD AREAS SHALL RECEIVE TURFIPOP SPRAY HEADS WALKS OR OTHER PAVEMENTS OR OBSTRUCTIONS. THE GENERAL
`
V
100% HEAD TO HEAD COVERAGE SHALL BE ACHIEVED. CONTRACTOR SHALL INSTALL SLEEVES IN SUFFICIENT SIZES TO
r
ACCOMMODATE FUTURE IRRIGATION PIPING AND/OR CONTROL WIRING,
Z
O
ENDS OF SLEEVES SHALL EXTEND IB INCHES PAST THE EDGES OF ALL
PAVING OR CONSTRUCTION. THE ENDS OF THE SLEEVES SHALL BE
a
CLEARLY MARKED FOR FUTURE USE BY THE IRRIGATION CONTRACTOR
W
+,
2
4-A
J
EDG PROJECT N0. NI R
461i 20210823
RLYIYONs
�t +.�r�•
.Ru+Mn
PHASE
Construction
Documents
TITLE
Landscape Notes
S. Details
SHEET No.
1 {e01