Loading...
HomeMy WebLinkAbout20-028 Map- - iu' Pubilr R.LI111-u1-W. i _ I �ti ),Ilal[ P•n ll)' \. ,Eil i; "i+LTic '- •• -- r., - __ Cin �u..:+Ju 11r,11 �j.+'rT..�1+E:I � (.orn�i _ OHIO STREET ~ .i5'13'.-KI ;\`; li- BLACK STEEP EDGING(TY-� _arc ~ 4. �4r IS G 26" CAL �1 _ ___-L_-_�- OAK TR MAIN D OAK S-SHUMARiF- BLIK STEEL EDGING - r �� - y l 7-DWARF YAUPON HOLLY' •.� 1 i C 3 GAL Ir Irr MIN le O-. y EXISTING 2!" CAL I 900, J l OAK TREE TO REMAIN f. MIMMR PLANTING .IIV/ BERMUDA 50D F(j'7j STRIP 7-DWARF YAUPON HOLLY GAL IB" HT MIN 36' QC. � - EXISTING 30" CAL y = OAK TREE TO REMAIN J// f .n •y _ _ � m II - /f _ lilj�cl 13rcl��rrh- _ m nI r— �. I EXISTING 16" CAL CRAPE MYRTLE TREE TO REMAIN ■ EXISTING 22' CAL I CRAPE MYRTLE TREE TO REMAIN I ; I I -SWEET BAY MAGNOLIA i y I 2" CAL i 4, 1"-SOFT RUSH i - 1 '24 OC y I I.SWEET BAY MAGNOLIA it i r[AL I i 0 � 1 R I 1 .1 1=LQ 04" G J' �Ill� i — E E �E -_ E EXISTING 20" CAL SUGARBERRY TREE TO REMAIN I i I � o 1 i i � i � 7-DWARF YAUPON HOLLY 3 GAL IB' HT MIN 3'- O.0 d-0WARF YAUPON HOLLY GAL IB" HT MIN 36" O-C y< I 1 ~ r � ' I -SWEET BAY MAGNOIRI-1� ® 2" CAL I ' I t ��. 1+I I m ' I m � � I m ~�BERMUOASOD (TYR) ---- t"SWEET BAY MAGNOLIA 2" CAL m ( m i BERMUD SOD (TYP) EXISTING 34" CAL - - - - " OAK TREE TO REMAIN �ISWEETBAY MAGNOLIA 2' CAL - ----`' EXISTING DENSE UNDERSTORY ■ S VEGETATION TO REMAIN \ EXISTING 26" CAL 4 OAK TREE TO REMAIN I / / EXISTING 30" (AL ------------� TRI MAGNOLIA TREE TO REMAIN MATCHLINE r E D G Ecological Design Group, Inc Pnon.: 4TTLEeeCM sI ResERsel Wvu.E N 86039'42 rr W OYIDE EEAMU6A SOD FOR 15TUE8 AR w T \BR cZ- L / h`-i . _R PLAN IT* D DENI D r EXISTING CAL 18 + / SUGARBERRY TREE TO REMAIN try. n;;t Nppy,_-.•s �@jDV!_ .. � { . o r Lail a■Iwoyeu �q: ' I O Z: ''TALL WOOD _ FENCE MATCHLINE _ ��Y -IIIIIIIIIIIIIII ■..■ .._� _ �. ,art. � -R�-- � � 1 . I I: BERMUDA SOD (TYP) O I i OYR7E BERMUDA SOD FOR O TUP BED AN FAS I T I EXISTING DENSE UNDERSTORY V I I VEGETATION TO REMAIN C • 1 Z L �� alLLI 1 ! � Y . = 4+ wr) j I [rto rpiJDC1 Y, zi-oa9 PATE 2p21 pe,2] II LANDSCAPE PLAN SCALE I— 10'-r PHASE Construction Documents I m 20, 40 vfl TITLE Landscape Plan jv NORTH I— o, v sIrtLT.w i ffl t, LANDSCAPE NOTES I, CONTRACTOR SHALL CONFIRM THE LOCATION OF ALL UTUTIES PRIOR TO STARTING ANY WORK. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ARKANSAS ONE -CALL TO CONFIRM ALL UTIUTIES, 3. ALL PLANTS MUST BE HEALTHY, VIGOROUS AND FREE OF PESTS AND DISEASE 3, STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL CONSTITUTE MINIMUM QUAUTY REQUIREMENTS FOR PLANT MATERIAL 4. ALL PLANTS MUST BE CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED ON THE PLANT LIST. S. ALL PLANTS ARE SUBJECT TO THE APPROVAL OF THE LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER CONSTRUCTION. 6 ALL PLANTING AREAS MUST BE COMPLETELY MULCHED WITH A 4" LAYER OF ORGANIC HARDWOOD MULCH. MULCH SHALL NOT BE PLACED IMMEDIATELY ADJACENT TO TREE TRUNKS, BUT SHALL BE KEPT AT LEAST 3" FROM ROOT COLLAR AT THE SOIL LINE 7, ALL PLANTING BEDS SHALL BE CONTAINED BY EDGING MATERIAL OTHER THAN VEGETATION, B PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL AVOID DAMAGE TO ALL UTIUTIES DURING THE COURSE OF THE WORK THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY AND ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC WHICH OCCURS AS A RESULT OF THE LANDSCAPE CONSTRUCTION AT NO COST TO THE OWNER 14, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK 15. THE CONTRACTOR IS RESPONSIBLE FOR FULLY MAINTAINING ALL PLANTING MATERIAL (INCLUDING BUT NOT LIMITED TO: WATERING, SPRAYING, MULCHING, FERTILIZING, ETC.) IN ALL PLANTING AREAS AND LAWN AREAS UNTIL THE WORK IS ACCEPTED IN TOTAL BY THE OWNER. 16. THE CONTRACTOR SHALL COMPLETELY GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE (1) YEAR BEGINNING ON THE DATE OF TOTAL ACCEPTANCE THE CONTRACTOR SHALL PROMPTLY MAKE ALL REPLACEMENTS BEFORE OR AT THE END OF THE GUARANTEE PERIOD, 17- ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOUATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES. QUANTITY, AND SIZE AND MEETING ALL PLANT LIST SPECIFICATIONS 10. ONCE INSTALLED, LANDSCAPING SHALL BE MAINTAINED IN HEALTHY LIVING CONDITION AND ALL PLANT MATERIAL THAT DIES SHALL BE REPLACED. 19. NOTIFY LANDSCAPE ARCHITECT OR DESIGNATED REPRESENTATIVE OF ANY LAYOUT DISCREPANCIES PRIOR TO ANY PLANTING. LOCATE ALL UTILITIES AND SITE LIGHTING CONDUITS BEFORE CONSTRUCTION BEGINS 20. MAINTENANCE THE CURRENT OWNER OF THE PROPERTY SHALL BE RESPONSIBLE FOR THE ONGOING MAINTENANCE OF REQUIRED LANDSCAPING IRRIGATION GENERAL NOTES IRRIGATION CONTRACTOR SHALL INSTALLALL EQUIPMENT AS PER MANUFACTURER'S CURRENT SPECIFICATIONS AND RECOMMENDATIONS. COORDINATE EXACT LOCATIONS OF WATER METER. BACKFLOW PREVENTER, CONTROLLER AND CLIMATE SENSOR WITH THE ARCHITECT AND GENERAL CONTRACTOR CONTRACTOR SHALL CAREFULLY VERIFY A MINIMUM RESIDUAL WATER PRESSURE OF 70pM @ 60gpor, CONTRACTOR SHALL NOTIFY THE OWNER IF WATER PRESSURE IS LESS THAN NOTED, WHEN TRENCHING UNDER THE DRIPLINE OF EXISTING TREES EXTREME CARE MUST BE GIVEN TO AVOID ROOT DAMAGE IF AT ALL POSSIBLE AVOID TRENCHING INSIDE THE DRIPLINE BY GOING AROUND THE TREE RATHER THAN UNDER IT. INSTALL PIPING AND SPRINKLERS ON THE INSIDE OF NEW CURBLINES IF POSSIBLE IF TRENCHING MUST OCCUR UNDER THE DRIPUNE, USE EITHER TUNNELING OR HAND -DIGGING METHODS RATHER THAN A MECHANICAL TRENCHER. MINIMIZE THE IMPACT OF ROOT SEVERING BY AVOIDING CONSTRUCTION DURING HOT, DRY WEATHER, KEEPING TREES WELL WATERED BEFORE AND AFTER DIGGING AND COVERING ROOTS WITH SOIL OR MULCH AS SOON AS POSSIBLE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES CAUSED TO ALL UTILITIES (BOTH OVERHEAD AND BELOWGROUND) DURING THE IRRIGATION INSTALLATION, CONTRACTOR SHALL SEEK THE ASSISTANCE AT LOCAL UTILITIES AND THE OWNER IN THE LOCATION OF THE UTILITIES PRIOR TO PERFORMING TRENCHING OPERATIONS IN THE WORKING AREA NEVER CUT LEADER TRIM UP TO 113 OF BRANCHES. RETAINING THB NATVk& VtkP% OF THE TREE SET TOP OF ROOT BALL 3' ABOVE FINISH GRADE BUILD 4- HT. SAUCER AROUND PLANTING PIT WITH TOPSOIL PROVIDE (3) 6' - T DIA LODGE POLES FOR TREE GUYING REVIEW IN FIELD TO INSURE SAFETY TRIPLE HAMMERED NATIVE - COLOR HARDWOOD MULCH 3' DEPTH 4' CLEAN STRAIGHT TRUNK NO LIMBS PROVIDE FERTILIZER TABLETS AND MYCO111HIZAE AS REQUIRED KEEP MULCH 6• CLEAR OF TRUNK MIX PLANTINGAS APPROVED PLAN I I Irl I I —1 I I� I I VERIFY SUBGRADE WILL DRAIN FRACTURE ROCK IF NOT I CANOPY TREE PLANTING / STAKING •E.3.300 S Y149 $0 IN TIkGK7 TOAND LRY ry53Y SOD 1H 71GRIr TO C-V, (—_)l SOD INSTALLATION NTS E I D I G EcaNgical Design Group, Inc ��c�c�lc4-Fcw R bon e:ie 3TB 020D UTTLEnocx SIO ROGERS I IINNE r11SCRP T 1T7 K7 . c_ ry' DI AtIM �H Know what, below. Ce11 before YOU dig WINTERIZATION SHALL BE DONE USING A COMBINATION OF MANUAL DRAIN VALVES IN THE LOW POINTS OF THE MAINUNE, AUTOMATIC DRAIN VALVES ON LATERAL UNESAND WRAPPING BACKFLOW PREVENTER WITH HEATTAPE INSIDE THE ENCLOSURE REFER TO PLANT J IS -SPACING WlOAT1r Muhcrl3 mmO PLANTSED ALUMINUM ECI O ALL FVC MAINLINE SHALL BE PVC SCH40, LATERAL UNES FVC CL200, ALL PVC FITTINGS SHALL BE SCH40 FVC TYPE I AND MUST BE OF DOMESTIC MANUFACTURE PVC SOLVENT CEMENT AND PRIMER SHALL BE AS RECOMMENDED I R WALK EDGE REF PUN FINISH GRADE APPROVED BY THE MANUFACTURER OF THE PIP APPRE I• ABOVE TURF O CONTRACTOR SHALL INSTALL A TRACER WIRE ABOVE ALL MAINLINE PIPING. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. PLANTW 11_11I .SSANDY 2 N INSTALL SPRINKLERS WITH CHECK VALVE FEATURE TO AVOID LOW- HEAD DRAINAGE FROM SPRINKLERS AT LOWER ELEVATIONS PROGRAM CONTROLLER WITH ; tmROOT LO AND BBB X�CO ONLY as PH FOR AZAIFA6 ONLY e�_IWA � (u 'CYCLE+SOAK' FEATURE AS REQUIRED TO ALLOW WATER TO INFILTRATE SOIL AND ELIMINATE RUN-OFF. in COMPACTED PUNT HIM BELOW BAILVI1 eA Ism' IRRIGATION NOTE SLEEVING NOTES ` THE IRRIGATION CONTRACTOR SHALL PROVIDE A FULLY THE GENERAL CONTRACTOR SHALL PROVIDE SCH40 FVC SLEEVING, BURIED AT A MINIMUM OF IB" AND MAXIMUM OF 24" DEPTH SHRUB RU B AND G RO U N DCOVE R PLANTING a OPERATIONAL CONVENTIONAL IRRIGAITON SYSTEM. THE O IRRIGATION CONTRACTOR SHALL PROVIDE SHOP DRAWINGS Nis FOR REVIEW AND APPROVAL ALL PLANTING AREAS SHALL UPON COMPLETION OF SITE FI W NG AND COMPACTION OPERATIONS, RECEIVE DRIP IRRIGATION, TREES SHALL RECEIVE BUBBLERS, AND PRIOR TO THE OFOF FOUNDATIONS, ROADWAYS, T T AND SOD AREAS SHALL RECEIVE TURFIPOP SPRAY HEADS WALKS OR OTHER PAVEMENTS OR OBSTRUCTIONS. THE GENERAL ` V 100% HEAD TO HEAD COVERAGE SHALL BE ACHIEVED. CONTRACTOR SHALL INSTALL SLEEVES IN SUFFICIENT SIZES TO r ACCOMMODATE FUTURE IRRIGATION PIPING AND/OR CONTROL WIRING, Z O ENDS OF SLEEVES SHALL EXTEND IB INCHES PAST THE EDGES OF ALL PAVING OR CONSTRUCTION. THE ENDS OF THE SLEEVES SHALL BE a CLEARLY MARKED FOR FUTURE USE BY THE IRRIGATION CONTRACTOR W +, 2 4-A J EDG PROJECT N0. NI R 461i 20210823 RLYIYONs �t +.�r�• .Ru+Mn PHASE Construction Documents TITLE Landscape Notes S. Details SHEET No. 1 {e01