Loading...
HomeMy WebLinkAbout14-082 Map 2C 01 �10°591 � 46" E 47g 57FT x 50'DRAINAGE t �JPRQ `h /R / LIMIT OF CONSTRUCTION EASEMENT X��ATE i �I pLQQ W � I / • X � LIMIT OF CONSTRUCTION p '° I � lSLNG CHAIN ' � j� •• �a � I • � K � ENC/NG \`�( I I I •• / EXISTING CURB OPENINGS, PROVIDE & �-� • X CONSTRUCT NEW RIP -RAP EROSION ' / \ I • PROTECTION AND RE -GRADING FOR NEW CHAIN-LI FENCE NEW 6'CURB & GUTTER (TYP.) •30.94' 255.26' •• TJ0TYP) fl` 2' 0 IHCI HAC HCI 75' 75' 0 POSITIVE DRAINAGE - RE: C201 & 15 / C501 NEW CHAIN -LINK FENCNEW H I 26-SPACE AT1T= 292' 264.61' rDoW 20 C �N-LINK FENCE EXISTING CHA//� LINK • FENCING - I X -- -- X X X XEXISTING 6"CURB& GUT; ER EXISTING STRIPES RE: NOTE 2 EXISTINGASPHALT ACRLIMIT OF CONSTRUCTIONI HC NEW PV'MT STRIPES RE: NOTE 2 OPEN DOCK QF, NEW DOCK DOOR NUMBERS TYPICAL - RE: NOTE 3 EXISTING STRIPES RE: NOTE 2 METAL SUILDING .... 169.36'ACR EX/ST/NGASPHALT HCLIMIT OF CONSTRUCTIONHC x X 179.36' 14' 23.5' 785' 11HAC • •• •• •• •• •• • —� •e •• -♦ HAC C6 NEW PV'MT STRIPES - RE: NOTE 2COVCRETE 19ET o SHE b 2' 41 SPACES AT 11' = 451' 7T 11 SPA. = 99'+—_Lt O r- L PtT 44' N 22' 1' C 7P 185' O O 188 25' HAC 36.75' O b PEW CHAIN LINK NEW 6" CURB & GUTTEE ' FENCING •• 3 C401 315 _- 5 00°05?t�" W 488. FT EXISTING CHAIN 488.95' PLAT) ' • •• L/NKFEVCING 0 40' 80, SITE PLAN ^I 1 SCALE SCALE: 1" = 40'-0" 2 C401 - C v 0 I an O 0 I 1 I 100 I�10 I� ul mo w O 0 loa W y N H v v — EXISTING STRIPES RE: NOTE 2 I I n �ze ►17 NOTES: 1. ALL DIMENSIONS AT TO THE BACK OF CURB, EDGE OF PAVEMENT OR FACE OF Ea BUILDING. 2. CONTRACTOR TO PROVIDE ALTERNATE PRICING TO RE -STRIPE ALL EXISTING C Y N T E R G Y A E C PAVING MARKINGS ON -SITE. FOR NEW ARCHITECTURE - ENGINEERING - CONSTRUCTION PAVEMENT PAVEMENT STRIPING SHOULD 12155 BOULDER,OK 9 8BT 5(X0H 91�R7T�FAX ]4119 BE INCLUDED BASE BID. 3, CONTRACTOR TO INCLUDE NEW PAINTED DOCK DOOR NUMBERS AS SHOWN ON ARKA PLAN (BASE BID). RE: 16 / C501. ; GIST RED P FES 10 4, THE EXISTING ASPHALT (ACR) REQUIRES E E SEVERAL AREA OF PAVEMENT PATCH & qQ No. i s REPAIR. CONTRACTOR TO PROVIDE UNIT r COST FOR SAW -CUT, REMOVAL AND _ REPLACEMENT. PATCH & REPAIR COST ROBERT L. DAY P.E. SHALL BE PRICED PER SQUARE FOOT. ENGINEER OFRECORD 5. LIMIT OF CONSTRUCTION SHOWN ON PLAN DOES NOT INCLUDE PAVEMENT PATCH & REPAIR OR ALTERNATE PAVEMENT STRIPING. PATCH & REPAIR AREAS & ALTERNATE PAVEMENT STRIPING WILL BE DETERMINED PRIOR TO CONSTRUCTION WITH THE OWNER / CONSTRUCTION MANAGER. 6. THE EXISTING FACILITY WILL REMAIN OPERATIONAL DURING CONSTRUCTION. CONSTRUCTION PHASING SHALL BE COORDINATED WITH OWNER / OPERATION I MANAGER. PAVEMENT LEGEND. EX. ASPHALT PATCH & REPAIR 2" ASPHALT SURFACE COURSE 4" ASPHALT BINDER COURSE 8" AGGREGATE BASE RE -COMPACT EXISTING SUBGRADE HEAVY-DUTY ASPHALTIC CONCRETE 2" ASPHALT SURFACE COURSE 4" ASPHALT BINDER COURSE 8" AGGREGATE BASE 12" SELECT FILL OR 10" MODIFIED SUBGRADE I HEAVY-DUTY CONCRETE J 6" PORTLAND CEMENT CONCRETE (4000 PSI REINFORCED, AIR ENTRAINED) #4 @ 18" O.C. EACH WAY 4" AGGREGATE BASE 12" SELECT FILL OR 10" MODIFIED SUBGRADE NOTE: REFER TO GEOTECHNICAL ENGINEERING REPORT PREPARED BY TERRACON PROJECT NO. 35135098 DATED OCTOBER 9, 2013 FOR ADDITIONAL INFORMATION PROJECT INFORMATION PROJECT ADDRESS: 6103 LINDSEY ROAD LITTLE ROCK, AR 72206 PROJECT NO. DATE 10/07/14 DRAWN BY CHECKED BY SAT TMK W Z N J Q = Z °C a z Y W V O F- (1) Lu J � J ISSUE/ REVISIONS 08/29/14 OWNER REVIEW 10/07/14 FOR PERMIT k�qp. i._ri SITE AND PAVEMENT IMPROVEMENTS: 6103 LINDSEY ROAD FOR: SOUTHEASTERN FREIGHT LINES C101