HomeMy WebLinkAbout15-086 Map 6GROUNDCOVER PLANT SPACING
"X" SPACING "Y" SPACING
6" O.C.
5.2"
(5-1/4")
8" O.C.
6.93" (6-7/8")
loll O.C.
8.66"
(8-5/8")
12"O.C.
10.4"
(10-3/8")
18" O.C.
15.6"
(15-1/2")
24" O.C.
20.8"
(20- 3/4")
30" O.C.
26"
36" O.C.
30"
GROUNDCOVER PLANTS
4" HARDWOOD MULCH
PREPARED SOIL
UNCOMPACTED SUBGRADE
OO GROUND COVER PLANTS TO BE SPACED
ACCORDING TO THE SPACING ON THE
PLANT LIST (X)
f O O O
0000
AGROUND COVER INSTALLATION
\ v /NOT TO SCALE
GUYING STAKE
-11 GA. GALVANIZED WIRE
ROOT BALL
TREE WELL
STEM CONNECTING WIRES
.TREESTEM
FLUORESCENT SAFETY FLAG
IF PLANTED IN PEDESTRIAN AREA
ONE LOOP OF NO. 9 GALV. WIRE IN
BLACK PLASTIC HOSE PER EACH STEM
ALLOW FOR SLIGHT EXPANSION
3 - 11 GA. GALVANIZED WIRE W/ 3"
TURNBUCKLE ATTACH TO EACH
SEPARATE STEM OR TRUNK.
4" MIN. MULCH
TOP OF PLANT BALL NOT TO BE
BELOW EXISTING GRADE
3" EARTH SAUCER
2"X2"X24" GUYING STAKES
CLEAN BACKFILL PLANTING SOIL
SLOPE SIDES 1:1
SUBGRADE, DO NOT COMPACT
AND WIRE BASKEI
MULTI TRUNK TREE PLANTING DETAIL
NOT TO SCALE
MINIMUM
tSPREAD y
CAREFULLY REMOVE
CONTAINER
DLANTING MIX
4" MIN. MULCH SEE GENERAL
M91:1
COMPACTED TOPSOIL
SHRUB PLANTING DETAIL
NOT TO SCALE
MIN.
SPREAD
CAREFULLY REMOVE
CONTAINER
MULCH AROUND STEMS
SEE GENERAL NOTES
PLANTING MIX
SLOPE SIDES 1:1
COMPACTED TOPSOIL
PERENNIAL PLANTING DETAIL
NOT TO SCALE
NOTE:
STEEL EDGING TO BE INSTALLED
AROUND ALL SHRUB BORDERS
WHEN ADJACENT TO TURF
TOP OF STAKE: TO BE 1/8"
BELOW TOP OF EDGING
TOP OF EDGING TO BE
/ 1/2" ABOVE TURF
5 STEEL EDGING
3 NOT TO SCALE
1. ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE
GUYING STAKE PROVISIONS OF"AMERICAN STANDARDS FOR NURSERY STOCK" AS
GALVANIZED WIRE PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN EXCEPT
WHERE STANDARDS DO NOT EXIST.
ROOT BALL
TREE WELL
VELY PRUNE CROWN IF NECESSARY
CUT CENTRAL LEADER
ICED RUBBER HOSE
2. TOPSOIL IS TO BE ADDED TO ALL PLANTING AREAS. ALL PLANT
MATERIALS TO BE APPROVED BY LANDSCAPE ARCHITECT BEFORE
INSTALLATION. PLANTING AREAS ARE TO HAVE A MINIMUM OF 4" OF
TOP SOIL AND 2" APPROVED COMPOST OR PEATMOSS ADDED AND
THOROUGHLY TILLED INTO EXISTING SOIL TO A MINIMUM DEPTH OF 8".
SUBMIT SOIL SAMPLES WITH ACCOMPANYING REPORT TO LANDSCAPE
ARCHITECT FOR APPROVAL PRIOR TO PLANTING AND PROVIDE
AND APPLY RECOMMENDED SUPPLEMENTS AS REQUIRED FROM
THE RESULTS OF THE SOIL TEST.
3. A PLANTING MIX OF 3 PARTS CLEAN TOPSOIL AND 1 PART APPROVED
COMPOST OR PEATMOSS SHALL BE USED TO BACKFILL ALL PLANTING
HOLES,
4. TOPSOIL SHALL BE FREE OF WEEDS, ROOTS, STONES, AND OTHER
FOREIGN MATERIALS. TOPSOIL SAMPLE SHOULD BE SUBMITTED WITH
SOIL ANALYSIS AND APPROVED BY LANDSCAPF ARCHITFCT PRIOR
k. WIRE W/ 3" TURNBUCKLE ATTACH @ TO INSTALLATION
RANCH OR MIN. 1/3 UP TREE
=LUORESCENT SAFETY FLAG
5. IT SHALL BE THE RESPONSIBILITY OF THE LANDSCAPE
F PLANTED IN PEDESTRIAN AREA
CONTRACTOR TO PROVIDE AND INSTALL ALL TOPSOIL AND BRING
SOIL LEVEL TO ROUGH GRADE.
ROOT BALL TO BE BURIED BELOW
EXISTING GRADE
6. IT SHALL BE THE RESPONSIBILITY OF THE LANDSCAPE
4" MIN. MULCH
CONTRACTOR TO BE AWARE OF THE LOCATION OF AND AVOID
DAMAGE TO ALL EXISTING SITE STRUCTURES AND UTILITIES.
3" EARTH SAUCER
SHOULD DAMAGE OCCUR IT SHALL BE THE RESPONSIBILITY OF
THE LANDSCAPE CONTRACTOR TO MAKE ALL NECESSARY
2"X2"X24" GUYING STAKES SET FLUSH TO
REPAIRS AND/OR REPLACEMENTS.
3RADE
CLEAN BACKFILL PLANTING SOIL
6" MIN.
SUBGRADE, DO NOT COMPACT
MIN. nr_Ivwvvr_ Ivr I/2
OF BURLAP AND
WIRE BASKET
TREE PLANTING DETAIL
NOT TO SCALE
7. VERIFICATION OF ALL MATERIAL TOTALS RESPONSIBILITY OF
LANDSCAPE CONTRACTOR.
8. CONTRACTOR IS TO EDGE ALL SHRUB AND GROUNDCOVER
BEDS WITH STEEL EDGING WHEN ADJACENT TO LAWN.
9. PROVIDE MINIMUM 4" SHREDDED HARDWOOD BARK MULCH TO
ALL SHRUB, GRASS, AND GROUNDCOVER BEDS.
10. PRIOR TO INSTALLING LANDSCAPE DIG ONE PLANT HOLE PER
BED. FILL THE COMPLETED HOLE WITH WATER TO CHECK FOR
DRAINAGE. IF HOLE DOES NOT DRAIN WITHIN 2 DAYS, USE A
METAL ROD AND HAMMER TO POUND HOLES THROUGH THE
BOTTOM UNTIL HOLE DRAINS. USE PROCEDURE FOR ALL HOLES
IN PLANT BED.
REVISION I R E V I S I O N D E S C R I P T I❑ N
LEVEL
DO NOT SCALE
TOLERANCES ON DIMENSIONS
DECIMALS t 1/16' ANGLES t p•
DRWN BY DATE
JHC 0/16/14
APVD BY JHC DATE
10/16/14
PROJECT # SCALE
043-01 1"=16'
PHDSC4pF10*
O
a :
JAMES H. ; m
CRANOR
No.5056
'*' r OF
Af6t5t*l
REVISION REVISIC
BY DATE
/ wcasa
zi
o AGRI PROCESS INNOVATIONS
RAWING TITLE
3of6 LANDSCAPE AND IRRIGATI❑N
CalArk International
1 [IF 4
No.API 043-01-002