HomeMy WebLinkAboutS-1577-1 Staff AnalysisJuly 5, 2007
ITEM NO.: 4 FILE NO.: S-1577
NAME: Welspun Subdivision Site Plan Review
LOCATION: Located South of Frazier Pike and East of Thibault Road
DEVELOPER:
Welspun Pipe
200 Ridgeway Road
Little Rock, AR 72205
GNVI-INIFFR-
Entech Consulting Engineers
1215 Sturgis Road
Conway, AR 72034
CONTRACTOR:
May Construction
2226 Cottondale Lane
Suite 100
Little Rock, AR 72202
AREA: 600 + acres
CURRENT ZONING
NUMBER OF LOTS: 1
The area is not zoned.
PLANNING DISTRICT: 26 — Port South
CENSUS TRACT: 40.07
FT. NEW STREET: 0 LF
VARIANCES/WAIVERS REQUESTED: A five year deferral of the required street
improvements to Frazier Pike Road.
A. PROPOSAUREQUEST:
The applicant is seeking a Subdivision Site Plan review for the development of
this 600 acre site. The new facility will consist of a 322,900 square foot Spiral
Pipe plant for the manufacturing of steel spiral pipe, 122,700 square foot coating
mill for the interior and exterior coating of the manufactured pipe, outside storage
July 5, 2007
SUBDIVISION
ITEM NO.: 4 (Cont.
FILE NO.: S-1577
of the raw and coated materials. Main access to the site will be from the existing
Frazier Pike Road. There will be a railroad spur for the shipment of finished
product from the site. The plant will operate 24 hours per day with approximately
200 to 250 employees spread over three (3) shifts.
B. EXISTING CONDITIONS:
The site has historically been used for agriculture purposes. The site is presently
sitting feral. The site is located outside the City Limits of the City of Little Rock
but within the Extraterritorial Planning Jurisdiction in which the City exercises
Subdivision control. Along the northern boundary of the site is a City of Little
Rock wastewater treatment plant and the eastern boundary is the Arkansas
River. The remainder of the area is predominately agriculture with a scattering of
homes located on acreage.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
owners of property located within 200-feet of the site along with the College
Station Neighborhood Association were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Frazier Pike is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2. Storm water detention ordinance applies to this property. Staff recommends
an in -lieu payment.
3. With site development, provide the design of street beyond the Little Rock
Port Authority property conforming to the Master Street Plan. Construct
one-half street improvement to Frazier Pike with the planned development.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: The property is located outside the current City limits and outside
the current service boundary. If annexed into the City of Little Rock, contact Little
Rock Wastewater Utility for easement and service requirements.
Entergy: No comment received.
Center -Point Enema: Approved as submitted.
AT and T: No comment received-
2
July 5, 2007
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1577
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A Capital Investment Charge based on the size of the connection(s) may
apply to this project in addition to normal charges.
3. A water main extension will be required, including the installation of off -site
faculties. Approval of plans by the Arkansas Department of Health
Engineering Division and Little Rock Fire Department is required.
4. This development will have a major impact on the existing water distribution
system. The developer should contact Central Arkansas Water regarding
water requirements. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. The site must maintain a
minimum gate opening and access of 20-feet. The site is located outside the
City limits of Little Rock. Annexation is required to receive City Fire service.
Contact the Little Rock Fire Department for additional information.
County Plannin :
1. Provide a revised drawing which labels the street names, clearly indicates
setbacks, from property lines and distance between structures. The revised
drawing should properly dimension the various rights of ways, access
easements and indicate the City limits.
2. Construct accesses to industrial standards.
CATA: The site is located near CATA Bus Route #20 — the College Station
Route.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division: No comment.
Landscape:
1. Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. An automatic irrigation system to water landscaped areas will be required.
3. Prior to construction, it will be necessary to provide an approved landscape
plan stamped with the seal of a Registered Landscape Architect.
July 5, 2007
SUBDIVISION
ITEM NO.: 4 (Cont.
FILE NO.: S-1577
4. The City Beautiful Commission recommends preserving as many existing
trees as feasible. Credit toward fulfilling Landscape Ordinance requirements
can be given when preserving trees of six (6) inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT. (June 14, 2007)
The applicant was present representing the request. Staff presented an
overview of the proposed development stating there were few technical issues
remaining outstanding associated with the request. Staff requested the applicant
provide a full size copy of the proposed site plan.
Public Works comments were addressed. Staff stated the streets should be
constructed to industrial street standard. Staff stated the storm water detention
ordinance would apply to development of the site.
Landscaping comments were addressed. Staff stated a landscape plan would be
required prior to construction on the site.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them directly for additional information
and clarification. There was no further discussion of the item. The Committee
then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the June 14, 2007, Subdivision Committee meeting. The applicant has
provided a full size drawing of the proposed site plan including dimensions of all
property lines and building setbacks from the property lines. The applicant has
indicated the site contains approximately 600 acres and the total proposed
building area is 445,600 square feet. The new facility will consist of a
322,900 square foot spiral pipe plant for the manufacturing of steel spiral pipe
and a 122,700 square foot coating mill for the interior and exterior coating of the
manufactured pipe. The site will contain areas of outside storage of the raw and
coated materials. These areas are not proposed for screening due to the size of
the of the property and the limited visibility from the abutting roadways.
The applicant has indicated main access to the site will be from the existing
Frazier Pike Road. The applicant is seeking a five-year deferral of the required
street improvements to Frazier Pike Road. Staff is supportive of the deferral
request.
Staff is supportive of the request. The applicant has included on the proposed
site plan the typical minimum standards per the Subdivision Ordinance for the
site plan review process. To staff's knowledge there are no outstanding issues
associated with the request. Staff feel the development of the site as proposed
should have minimal impact on this site and the area.
Cl
July 5, 2007
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1577
STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the applicant's request for a five-year deferral of
the required street improvements to Frazier Pike Road.
PLANNING COMMISSION ACTION: (JULY 5, 2007)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the
applicant's request for a five-year deferral of the required street improvements to Frazier
Pike Road.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the consent agenda for approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 vacant position.
ITEM NO.: 4. S-1577
NAME: Welspun Subdivision Site Plan Review
LOCATION: located South of Frazier Pike and East of Thibault Road
Planninq Staff Comments.
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than June 20, 2007. The Office of Planning and
Development must receive the proof of notice no later than June 28, 2007.
2, Will Frazier Pike be closed as a public right of way or will the area be maintained as
a public street.
3. Provide a site plan which includes all permanent buildings and structures proposed
or existing with dimensions on the buildings and setbacks from property lines.
4. Provide a site plan which includes all parking areas, whether existing or proposed,
and the radius on all drive lanes, curves or turns.
5. Provide all points of ingress and egress to the site from adjacent streets or
properties and dimensions of drives.
6. Provide all property lines with dimensions.
7. Provide existing right of way dimensions on abutting streets and all street names
clearly delineated.
8. Provide the areas within the development to be devoted to landscaping.
9. Provide the total number of parking spaces and the total number of handicap parking
spaces.
10. Provide the percent building coverage, both principal and accessory, in square feet.
11. Provide the parcel size.
12. Provide the floor area, principal and accessory, both existing and proposed.
Variance/Waivers: None requested.
Public Works Conditions:
1. Frazier Pike is classified on the Master Street Plan as a minor arterial. A dedication
of right-of-way 45 feet from centerline will be required.
2. Storm water detention ordinance applies to this property. Staff recommends an in -
lieu payment.
3. With site development, provide the design of street beyond the Little Rock Port
Authority property conforming to the Master Street Plan. Construct one-half street
improvement to Frazier Pike including 5-foot sidewalks with the planned
development.
Utilities and Fire Department/County Planning:
Item # 4
Wastewater: The property is located outside the current City limits and outside the
current service boundary. If annexed into the City of Little Rock, contact Little Rock
Wastewater Utility for easement and service requirements.
Enter : No comment received.
Center -Point Energy- Approved as submitted.
AT and T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. A Capital Investment Charge based on the size of the connection(s) may apply to
this project in addition to normal charges.
3. A water main extension will be required, including the installation of off -site faculties.
Approval of plans by the Arkansas Department of Health Engineering Division and
Little Rock Fire Department is required.
4. This development will have a major impact on the existing water distribution system.
The developer should contact Central Arkansas Water regarding water
requirements. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
Fire Department: Place fire hydrants per code. The site must maintain a minimum
gate opening and access of 20-feet. The site is located outside the City limits of Little
Rock. Annexation is required to receive City Fire service. Contact the Little Rock Fire
Department for additional information.
Count Plannin
1. Provide a revised drawing which labels the street names, clearly indicates setbacks,
from property lines and distance between structures. The revised drawing should
properly dimension the various rights of ways, access easements and indicate the
City limits.
2. Construct accesses to industrial standards.
CATA: The site is located near CATA Bus Route #20 — the College Station Route
Planning Division: No comment.
Landscape:
1. Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. An automatic irrigation system to water landscaped areas will be required.
3. Prior to the issuance of a building permit, it will be necessary to provide an approved
landscape plan stamped with the seal of a Registered Landscape Architect.
Item # 4
4. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this tree covered site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or larger.
Revised Plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, June 20, 2007.
Item # 4