HomeMy WebLinkAboutS-0867-NNNNNNNNN ApplicationCIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: PARKSIDE AT WILDWOOD BLOCKS 2,3 & 4
I have made a final inspection of the improvements and find that:
V All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Carl Pettit Engineering Specialist Date:_ 815/?QZ _ _
A DDRES5II�TG 5P&CIALLST REPORT
I have reviewed the plat and find that the street names and street configuration are acceptable.
Glenn Hale Addressing Specialist Date: 8/5/2021
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
conformance with City requirementslstandards.
street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent,
Approved engineering drawings for strectlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
Nat Banihatti Traffic Engineer Date: 8/16/2021
CIVIL ENGINESER REPORT
I have reviewed the file for this matter and find that:
V The maintenance bond has been submitted and it is the proper type and amount_
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
V All other requirements for final plat approval have been satisfied.
1(of ta, R&S-�
URVEYOR REPORT
I have reviewed the plat and find tbat:
Civil Engineer I/II Date: 8/17/ 0021
All requirements for final plat approval have been satisfied.
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
Date: 8-17-21
Design Review Engineer/Civil Engineering Manager
Effective: August 4, 2021
Date:
TH011l AS
ENGINEERING
COMPANY
CIVIL ENGINEERS LAND SURVEYORS
PROJECT DESCRIPTION _fWI-55Lj>Lnf�_n
Q
t A T% Z' DATE
PREPARED BY `1 ry
SHEETS
3810 LOOKOUT RD, NORTH LITTLE ROCK, AR 72116 TEL: (501) 753-4463
Thomas R. Pownall, P.E.
From: Henderson, Jeremy <jhende9@entergy.com>
Sent: Wednesday, July 28, 2021 2:41 PM
To: Thomas R. Pownall, P.E.
Subject: RE: Parkside at Wildwood Plat
Entergy approves.
From: Thomas R. Pownall, P.E.<thomas@thomasengineering2000.com>
Sent: Wednesday, July 28, 2021 2:30 PM
To: 'Vincent Hotho' <Steven.Hotho@lrwra.com>; Chris Green <Chris.Green@carkw.com>; Andrew Pownall at carkw
<Andrew.Pownall@carkw.com>; Joni Bates <joni.bates@centerpointenergy.com>; Henderson, Jeremy
<jhende9@entergy.com>; Chris <ck0826@att.com>
Subject: Parkside at Wildwood Plat
EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is
unknown, or the message seems suspicious in any way. DO NOT provide your
user ID or password.
All,
Attached is the plat for Parkside at Wildwood in Little Rock. Please review and state if it is acceptable. The City Of Little
Rock requires your comment. If I could have your reply by Friday, it would be great.
Thank you
Thomas R. Pownall, P.E.
Vice President
THOMAS
Ile ENGINEERING
COMPANY
CIVIL ENGINEERS LAi\'D SURVEYORS
3810 Lookout Road
North Little Rock, AR 72116
501.753.4463 - O
501.351.6695 - M
This message is intended for the exclusive use of the intended addressee. If you have received this message in error or
are not the intended addressee or his or her authorized agent, please notify me immediately by e-mail, discard any
paper copies and delete all electronic files of this message.
V, r
Thomas R. Pownall, P.E.
From: YOUNG, BRENT A <BY1726@att.com>
Sent: Wednesday, July 28, 2021 2:58 PM
To: Thomas R. Pownall, P.E.
Cc: KEATHLEY, CHRIS; MANION, JOSEPH E
Subject: RE: Parkside at Wildwood Plat
Thomas,
This plat is approved.
Thank You,
Brent Young
Manager OSP
Engineering Design
AT&T
(501)590-8906
From: Thomas R. Pownall, P.E. <thomas@thomasengineering2000.com>
Sent: Wednesday, July 28, 2021 2:39 PM
To: YOUNG, BRENT A <BY1726@att.com>
Subject: FW: Parkside at Wildwood Plat
B re nt,
Given Chris is out of town, can you please review this for acceptance. See below.
Thanks
Thomas R. Pownall, P.E.
Vice President
THOMAS
ire ENGINEERING
COMPANY
CIVIL ENGINEERS LAND SURVEYORS
3810 Lookout Road
North Little Rock, AR 72116
501.753.4463 - O
501.351.6695 - M
From: Thomas R. Pownall, P.E. <thomas@thomasengineering2OOO.com>
Sent: Wednesday, July 28, 2021 2:30 PM
To -'Vincent Hotho' <Steven.Hotho@lrwra.com>; Chris Green <Chris-Green@car_kw.com>; Andrew Pownall at carkw
<Andrew.Pownali@carkw.com>; Joni Bates (ioni.bates centerpointene�om)<iani.bates@centerpointenerpy.com>;
Thomas R. Pownall, P.E.
From: Vincent Hotho <Steven.Hotho@Irwra.com>
Sent: Monday, August 16, 2021 3:46 PM
To: Thomas R. Pownall, P.E.
Subject: RE: Parkside at Wildwood Sewer Approval
Thomas,
This plat is approved.
Thank you,
Vince
S. Vincent Hotho, P.E.
Engineering Manager
11 Clearwater Dr.
Little Rock, AR 72204
Office: (501)688-1452
wwnv.lrwra.com
LITTLE ROCK
Water Reclamation
Authority SOUL FUTURE.
This email and any files transmitted with it are confidential and intended solely for the
use of the individual or entity to whom they are addressed. If you have received this
email in error, please notify the sender. This message may contain confidential
information, and is intended only for the individual named.
From: Thomas R. Pownall, P.E.<thomas@thomasengineering2000.com>
Sent: Monday, August 16, 20213:42 PM
To: Vincent Hotho <Steven.Hotho@Irwra.com>
Subject: RE: Parkside at Wildwood Sewer Approval
Vince,
Easements extended for Lot 15 and Lot 19
Thanks!
Thomas R. Pownall, P.E.
Vice President
THOMAS
Ile ENGINEERING
COMPANY
CIVIL ENGINEERS LAND SURVEYORS
3810 Lookout Road
vn„ *$
LI, ILL RC-r-F
Water Reclamatin
AtAhoft du.�.�L r
7aF r.�ii�AF.
August 16, 2021
Mr. Thomas R. Pownall, P.E.
Thomas Engineering Company
3810 Lookout Road
North Little Rock, AR 72116
RE: Acceptance Letter for Project: Parkside at Wildwood Phase 2
127-2-200023
Dear Mr. Pownall:
The sanitary sewer gravity mains constructed, as represented by your "As Constructed"
drawings, to provide sewer service to the above referenced project, are hereby accepted.
The Utility shall begin operation and maintenance effective immediately, except that all
defects in material and workmanship must be remedied by the Developer or his Contractor,
if reported to the Developer or his Contractor (or his Engineer), within one (1) year of the
date of the Maintenance Bond.
ESTIMATED COST MATERIALS Manholes
$3.59,947.75 1,845 LF of 8" SDR-35 PVC Sewer Main 13 Pre -Cast
191 LF of 8" DIP Sewer Main
If you have any questions or comments, please call.
Sincerely,
LITTLE ROCK WATER RECLAMATION AUTHORITY
li
S. Vincent Hotho, P.E.
Engineering Manager
Office 501-688-1452
Cell 501- 609-6332
Email vince.hotho@lrwra.com
cc GIS
I CLEARWA7EFi DF_ LITTLE ROCK. AA 7 2 2 0 d I LF1WU_C6R9 1 50% 376_ 29U3
�-I
Thomas R. Pownall, P.E.
From: Johnston, Courtney X <courtney.johnston@centerpointenergy.com>
Sent: Wednesday, August 18, 2021 3:03 PM
To: thomas@thomasengineering2000.com
Subject: RE: [External Email] FW: Parkside at Wildwood Plat
Good afternoon Thomas,
We have reviewed the plat and found that CenterPoint Energy does not have a conflict with it. Please let this serve as
our letter of approval.
Thanks,
Courtney Johnston
+ Associate Engineer I AR/OK Region
501.377.4764 w. 1501.398.4157 c.
EfiaW CenterPointEnergy.com
v O O
From: Gober, Adam P <adam.gober@centerpointenergy.com>
Sent: Wednesday, August 18, 2021 1:09 PM
To: Johnston, Courtney X <courtney.johnston@centerpointenergy.com>
Cc: Mangan, Suzanne C <suzanne.mangan@centerpointenergy.com>; Bates, Joni B
<joni.bates@centerpointenergy.com>
Subject: FW: [External Email] FW: Parkside at Wildwood Plat
Hey Courtney,
Could you review this attached plat?
Thank you!
Adam P. Gober
Cente ?NI Engineer I AR/OK Region
-- - 501.377.4737 w. 1 501.541.7509 c.
y EOeW CenterPointEnergy.com
From: Bates, Joni B <ioni.bates center ointener .com>
Sent: Wednesday, August 18, 2021 9:22 AM
To: Gober, Adam P <adam. obey center ointener .com>
Subject: FW: [External Email] FW: Parkside at Wildwood Plat
Adam:
Thomas R. Pownall, P.E.
From: Andrew Pownall <Andrew.Pownall@carkw.com>
Sent: Tuesday, August 17, 2021 1:48 PM
To: Thomas R. Pownall, P.E.
Subject: RE: [External] Parkside at Wildwood Plat
CAW is abandoning the easement for the abandoned/removed 12" line through the property. CAW has no other
objections to the plat.
Andrew Pownall
Senior Engineer
Central Arkansas Water
501-377-1342 (Office)
501-218-6898 (Cell)
;crsa�
t:..•� I111�ter
From: Thomas R. Pownall, P.E.<thomas@thomasengineering2000.com>
Sent: Wednesday, July 28, 20212:30 PM
To: 'Vincent Hotho' <Steven.Hotho@lrwra.com>; Chris Green <Chris.Green@carkw.com>; Andrew Pownall
<Andrew.Pownall@carkw.com>; Joni Bates <joni.bates@centerpointenergy.com>; Henderson, Jeremy
<jhende9@entergy.com>; Chris <ck0826@att.com>
Subject: [External] Parkside at Wildwood Plat
CAUTION: This email originated from outside of the CAW. Do not click links or open attachments unless you recognize
the sender and know the content is safe.
All,
Attached is the plat for Parkside at Wildwood in Little Rock. Please review and state if it is acceptable. The City Of Little
Rock requires your comment. If I could have your reply by Friday, it would be great.
Thank you
Thomas R. Pownall, P.E.
Vice President
THOMAS
Ile ENGINEERING
COMPANY
CIVIL ENGINEERS LAND SURVEYORS
3810 Lookout Road
North Little Rock, AR 72116
501.753.4463 - 0
City of Little Rock
Planning and Development
Frling Fees
Date° , 20 7-1
Annexation
Board of Adjustment
Cond Use Permitrf UP
Final Plat
Planned Unit Dev
Preliminary Plat
Special Use Permit
Rezoning
Site Plans
Street Name Change
Street Name Signs
Number at ea
Public Hearing Signs
Number at ea
Total
File No
Location -AC 4�5
AUG 19 PAID
CITY OFLITTLE ROCK
$ 8JILD1j'JG CODE
$
$
s-71 ®.c.-z::)
$
$
a