Loading...
HomeMy WebLinkAboutS-0867-EEEEEEEE Staff AnalysisI>twkArkIQ �� NAME: Chenal Valley Phase 20 and 21 Revised Preliminary Plat LOCATION: North of Chenal Valley Drive on Varennes Court Plannina Staff Comments: S-867-EEEEEEEE 1. Provide notification of the property owners located within 200-feet of the development including the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than June 15, 2016. The Office of Planning and Development must receive the proof of notice no later than June 24, 2016. 2. The lots appear to comply with the typical development standards of the R-2, Single- family zoning district. What are the setbacks proposed for the side and rear lot lines of the indicated lots both in Ensbury and Varennes? Variance/Waivers: A request to allow the development of lots with private streets (Section 31-207) and to allow the development of an internalized pedestrian circulation system (Section 31-175(2)). Public Works Conditions: 1. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 2. Stormwater detention ordinance applies to this property. 3. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 4. Streetlights are required by Section 31-403 of the Little Rock code of ordinances. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Greg Simmons, Traffic Engineering, 501.379.1813, gsimmonsQlittlerock.org for more information. 5. No residential waste collection service will be provided on private streets unless the property owners association provides a waiver of damage claims for operations on private property. An easement area or language provided in the Bill of Assurance must be included to allow the trash receptacles from Lots 11 through 14, Block 98 to be taken to the cul de sac for pick up. 6. Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. 7. All public drainage easements must be unobstructed and access provided to the public right-of-way by constructed infrastructure and/or documented on the final plat. 8. All public drainage easements must contain drainage infrastructure approved by the City of Little Rock Public Works Department. 9. 100 year overflow swales must be constructed and placed within public drainage easements. ITEM NO.: 2 S-867-EEEEEEEE 10. Provide a Sketch Grading and Drainage Plan per Section 29-186(e) indicating where the proposed public drainage easements are proposed to determine if access can be provided for maintenance. 11.The island proposed at the intersection of Chenal Valley Drive and Ensbury Loop should be located no closer than 22 feet from the projection of the back of curb on Chenal Valley Drive. 12. Approximately 80 feet of street width is proposed across Ensbury Loop at the intersection of Chenal Valley Drive. The island should be designed with a pedestrian refuge area. Utilities and Fire Department/County Planning: Wastewater: Sewer main extension required with easements if new sewer service is required for this project. Contact Little Rock Wastewater Utility for additional information. Entergy: Entergy does not object to this proposal. Three phase and single phase underground power lines exist in the area. There do not appear to be any existing conflicts with Entergy facilities on this property. Contact Entergy in advance to discuss future service requirements, new facilities locations and adjustments to existing facilities (if any) as this project proceeds. Centerpoint Energy: No comment received. AT & T: No comment received. Central Arkansas Water: 1. All Central Arkansas Water requirements in effect at the time of request for water service must be met. 2. A water main extension will be needed to provide water service to this property. 3. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and the Little Rock Fire Department is required. 4. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. 5. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be one at the expanse of the developer. 6. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department regarding the required placement of the hydrant(s) and contact Central Arkansas Waster regarding procedures for installation for the hydrant(s). 7. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. ITEM NO.: 2 S-867-EFEEEEEF 8. Contact Central Arkansas Water regarding the size and location of water meter. 9. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZA) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by Central Arkansas Water. The test results must be sent to Central Arkansas Water's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you would like to discuss backflow prevention requirements for this project. 10. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's materials and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of a Customer Owned Line Agreement is required. 11. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated with a double detector check valve assembly. If additives area used, a reduced pressure zone back flow preventer shall be required. Fire Depar#ment: 1. Maintain Access. 2. Fire Hydrants. 3. Maintain fire apparatus access roads at fire hydrant locations as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet, exclusive of shoulders. 4. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not exceed 10 percent in grade except as approved by the fire chief. 5. Loading. Maintain fire apparatus access road design as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds. 6. Dead Ends. Maintain fire apparatus access roads at dead end locations as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with width and turnaround provisions in accordance with Table D103.4. Requirements for Dead-end fire apparatus access roads. 7. Gates. Maintain fire apparatus access road gates as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road ITEM NO.: 2 S-867-EEEEEEEE gates. Gates securing the fire apparatus access roads shall comply with all of the following criteria: a. Minimum gate width shall be 20 feet. b. Gates shall be of swinging or sliding type. c. Construction of gates shall be of material that allow manual operation by one person. d. Gate components shall be maintained in an operable condition at all times and replaces or repaired when defective. e. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. f. Manual opening gates shall not be locked with a padlock or chain and padlock unless they are capable of being opened by means of forcible entry tools or when a key box containing the keys to the lock is installed at the gate location. g. Locking device specifications shall be submitted for approval \by the fire code official h. Electric gate operators, where provided, shall be listed in accordance with UL 325. i. Gates, intended for automatic operation shall be designed, constructed and installed to comply with requirements of ASTM F 2200. 8. One- or Two -Family Residential Developments. As per Appendix D, Section D107.1 of the Arkansas Fire Prevention Code Vol. 1, One- or Two -Family dwelling residential developments. Developments of one- or two-family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads, and shall meet the requirements of Section D104.3. Exceptions: 1. Where there are more than 30 dwelling units on a single public or private fire apparatus access road and al dwelling units are equipped throughout with an approved automatic sprinkler system in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3 of the Arkansas Fire Code, access from two directions shall not be required. 2. The number of dwelling units on a single fire apparatus access road shall not be increased unless fire apparatus access roads will connect with future development, as determined by the fire code official. 9. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Capt. Tony Rhodes 501,918.3757 or Capt. John Hogue 501.918.3754). Number and Distribution of Fire Hydrants as per Table C105.1. Parks and Recreation: No comment received. County Planning: No comment. ITEM NO.: 2 S-867-EEEEEEEE Rock Region Metro: Location is not currently served by METRO. The Developer's plan indicates two dead-end courts which make providing paratransit service difficult and inefficient. It also does not advance a future connected street network desirable in an urban suburban environment such as Little Rock. Consider a design which provides connection for pedestrians and cyclists as well as transit for the future along Chenal Valley Road. Building Code: No comment. Planning Division: No comment. Landscape: No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, June 15, 2016. August 11, 2016 ITEM NO.: C FILE NC NAME: Chenal Valley Phase 20 and 21 Revised Preliminary Plat LOCATION: North of Chenal Valley Drive on Varennes Court DEVELOPER: Deltic Timber Corporation #7 Chenal Club Circle Little Rock, AR 72223 ENGINEER: White-Daters and Associates 24 Rahling Circle Little Rock, AR 72223 AREA: 75.7 acres NUMBER OF LOTS: 110 WARD: 5 PLANNING DISTRICT: 19 - Chenal CURRENT ZONING: R-2, Single-family -867-EEEEEEEE FT. NEW STREET: 7,450 LF CENSUS TRACT: 42.13 VARIANCE/WAIVERS: A request to allow the development of lots with private streets (Section 31-207) and to allow the development of an internalized pedestrian circulation system (Section 31-175(2)). BACKGROUND: On April 19, 2001, the Little Rock Planning Commission approved a preliminary plat for Blocks 83 — 117 Chenal Valley Subdivision. The approval allow for the subdivision of 365 acres into 688 single-family lots. The developer proposed approximately 24,850 linear feet of new streets within the development constructed with public and private accesses. As part of the plat the developer proposed the extension of Chenal Valley Drive to the west and extended around the perimeter of the subdivision looping back to Chenal Parkway. The plat included eight (8) smaller gated communities. The roadway was constructed and several of the proposed smaller gated communities have developed. August 11, 2016 SUBDIVISION ITEM NO.: C (Cont.) FILE NO.: S-867-EEEEEEEE On March 30, 2006, the Little Rock Planning Commission approved a revision to the preliminary plat to allow the minimum side yard setback of six (6) feet for all lots within Blocks 96, 97, 99, 101-104 Chenal Valley Addition. All previously proposed lot development standards continued to apply to the proposed plat. On July 27, 2005, a final plat was filed for Lots 1 — 21, Block 98 and Tracts A, B, C & D, Block 98, the Varennes Neighborhood. A. PROPOSAUREQUEST/APPLICANT'S STATEMENT: The applicant is proposing to revise the approved preliminary plat, Ensbury Neighborhood and replat a number of lots within a previously platted subdivision, the Varennes Neighborhood. The previous approval allowed for the development of 143 lots within the Ensbury Neighborhood. There were 25 lots final platted within the Varennes Court Neighborhood. The current request is to allow 36 lots within the Varennes Neighborhood and 74 lo_ts within the Ensbury Neighborhood. The applicant is seeking to develop the subdivision utilizing private streets. Section 31-207 of the Little Rock Code of Ordinances states private streets for residential development shall be discouraged. However, private streets may be approved by the Planning Commission to serve isolated developments. The design standard must conform to public street design standards. Private streets are permissible only in the form of cul de sac and short loop streets and only when it is determined that the streets can be adequately served by all public service vehicles. The developer is proposing the use of an internalized pedestrian circulation system in -lieu of sidewalks. Section 31-175 of the Little Rock Code of Ordinances outlines the minimum design requirements for sidewalks. The ordinances states internalized pedestrian circulation systems in the form of paved pathways may be substituted for sidewalks along collector and residential streets upon approval by the Planning Commission. B. EXISTING CONDITIONS: The site is densely wooded located along the north side of Chenal Valley Drive. To the south is Wildwood Place Subdivision, a single-family subdivision and to the east is the Hallen Court Subdivision. North of the site is the Chenal Valley Country Club golf course. Chenal Valley Drive has been constructed with two (2) lanes and a marked bike path in each direction. There is curb, gutter and sidewalk in place along Chenal Valley Drive. 2 August 11, 2016 SUBDIVISION ITEM NO.: C(Cont.)FILE NO.: S-867-EEEEEEEE C. NEIGHBORHOOD COMMENTS: All abutting property owners were notified of the public hearing. There is not an active neighborhood association located within this area. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 2. Stormwater detention ordinance applies to this property. 3. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 4. Streetlights are required by Section 31-403 of the Little Rock code of ordinances. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Greg Simmons, Traffic Engineering, 501.379.1813, gsimmons(a).iittierock.org for more information. 5. No residential waste collection service will be provided on private streets unless the property owners association provides a waiver of damage claims for operations on private property. An easement area or language provided in the Bill of Assurance must be included to allow the trash receptacles from Lots 11 through 14, Block 98 to be taken to the cul de sac for pick up. 6. Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. 7. All public drainage easements must be unobstructed and access provided to the public right-of-way by constructed infrastructure and/or documented on the final plat. 8. All public drainage easements must contain drainage infrastructure approved by the City of Little Rock Public Works Department. 9. 100 year overflow swales must be constructed and placed within public drainage easements. 3 August 11, 2016 SUBDIVISION ITEM NO.: C (Cont.) FILE NO.: S-867-EEEEEEEE 10. Provide a Sketch Grading and Drainage Plan per Section 29-186(e) indicating where the proposed public drainage easements are proposed to determine if access can be provided for maintenance. 11. The island proposed at the intersection of Chenal Valley Drive and Ensbury Loop should be located no closer than 22 feet from the projection of the back of curb on Chenal Valley Drive. 12. Approximately 80 feet of street width is proposed across Ensbury Loop at the intersection of Chenal Valley Drive. The island should be designed with a pedestrian refuge area. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements if new sewer service is required for this project. Contact Little Rock Wastewater Utility for additional information. Entergy: Entergy does not object to this proposal. Three phase and single phase underground power lines exist in the area. There do not appear to be any existing conflicts with Entergy facilities on this property. Contact Entergy in advance to discuss future service requirements, new facilities locations and adjustments to existing facilities (if any) as this project proceeds. Centerpoint Energy: No comment received. AT & T: No comment received. Central Arkansas Water.- 1 All Central Arkansas Water requirements in effect at the time of request for water service must be met. 2. A water main extension will be needed to provide water service to this property. 3. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and the Little Rock Fire Department is required. 4. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. 12 August 11, 2016 SUBDIVISION 1,00MIN[o•Tii# 5. If there are facilities that Central Arkansas Water. developer. FILE NO.: S-867-EEEEEEEE need to be adjusted and/or relocated, contact That work would be one at the expense of the 6. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department regarding the required placement of the hydrant(s) and contact Central Arkansas Waster regarding procedures for installation for the hydrant(s). 7. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. 8. Contact Central Arkansas Water regarding the size and location of water meter. 9. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZA) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by Central Arkansas Water. The test results must be sent to Central Arkansas Water's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you would like to discuss backflow prevention requirements for this project. 10. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's materials and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of a Customer Owned Line Agreement is required. 11. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated with a double detector check valve assembly. If additives are used, a reduced pressure zone back flow preventer shall be required. Fire De artment.- 1. Maintain Access. 2. Fire Hydrants. 3. Maintain fire apparatus access roads at fire hydrant locations as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet, exclusive of shoulders. 5 August 11, 2016 SUBDIVISION ITEM NO.: C (Cont.) FILE NO.: S-867-EEEEEEEE 4. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not exceed 10 percent in grade except as approved by the fire chief. 5. Loading. Maintain fire apparatus access road design as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds. 6. Dead Ends. Maintain fire apparatus access roads at dead end locations as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with width and turnaround provisions in accordance with Table D103.4. Requirements for Dead-end fire apparatus access roads. 7. Gates. Maintain fire apparatus access road gates as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road gates. Gates securing the fire apparatus access roads shall comply with all of the following criteria: a. Minimum gate width shall be 20 feet. b. Gates shall be of swinging or sliding type. c. Construction of gates shall be of material that allow manual operation by one person. d. Gate components shall be maintained in an operable condition at all times and replaces or repaired when defective. e. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. f. Manual opening gates shall not be locked with a padlock or chain and padlock unless they are capable of being opened by means of forcible entry tools or when a key box containing the keys to the lock is installed at the gate location. g. Locking device specifications shall be submitted for approval by the fire code official h. Electric gate operators, where provided, shall be listed in accordance with UL 325. i. Gates, intended for automatic operation shall be designed, constructed and installed to comply with requirements of ASTM F 2200. August 11, 2016 SUBDIVISION ITEM NO.: C (Cont. FILE NO.: S-867-EEEEEEEE 8. One- or Two -Family Residential Developments. As per Appendix D, Section D107.1 of the Arkansas Fire Prevention Code Vol. 1, One- or Two -Family dwelling residential developments. Developments of one- or two-family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads, and shall meet the requirements of Section D104.3. Exceptions: 1. Where there are more than 30 dwelling units on a single public or private fire apparatus access road and all dwelling units are equipped throughout with an approved automatic sprinkler system in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3 of the Arkansas Fire Code, access from two directions shall not be required. 2. The number of dwelling units on a single fire apparatus access road shall not be increased unless fire apparatus access roads will connect with future development, as determined by the fire code official. 9. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Capt. Tony Rhodes 501,918.3757 or Capt. John Hogue 501.918.3754). Number and Distribution of Fire Hydrants as per Table C105.1. Parks and Recreation: No comment received. County Planning: No comment. Rock Region Metro: Location is not currently served by METRO. The Developer's plan indicates two dead-end courts which make providing paratransit service difficult and inefficient. It also does not advance a future connected street network desirable in an urban suburban environment such as Little Rock. Consider a design which provides connection for pedestrians and cyclists as well as transit for the future along Chenal Valley Road. F. ISSUES/TECHNICAL/DESIGN� Buildinq Code: No comment. Planning Division- No comment. Landscape: No comment. 7 August 11, 2016 SUBDIVISION ITEM NO.: C Cont. FILE NO.: S-867-EEEEEEEE G. SUBDIVISION COMMITTEE COMMENT: (June 8, 2016) Mr. Tim Daters of White-Daters and Associates was present representing the request. Staff presented an overview of the item stating the request was a revision to a previously approved preliminary plat and a replat of lots previously final platted with the Chenal Valley Subdivision. Staff stated the lots within the Varennes Neighborhood were being increased and lots within the Ensbury Neighborhood were being decreased. Staff stated the lots within the Varennes Neighborhood were being replatted. Staff stated the lots within the Varennes Neighborhood were being developed utilizing private streets. Staff stated the lots within the Ensbury Neighborhood would be developed utilizing public streets. Public Works comments were addressed. Staff stated a grading permit was required prior to any clearing on the site. Staff stated the City's Stormwater Detention Ordinance would apply to the development of the site. Staff stated residential waste collection would not take place on private streets unless the Property Owners Association signed a waiver of damage claims. Staff also stated Lots 11 through 14 would be required to take their trash bins to the cul de sac for garage collection. Staff stated all 100 year drainage swales were to be constructed and placed within public drainage easements. Staff stated the width of Ensbury Loop adjacent to Chenal Valley Drive was near 80-feet. Staff stated the island within the street should be designed as a pedestrian refuge area. Mr. Daters stated the design of the street was previously approved by Public Works staff and the street was presently under construction. Staff noted the comments from the various other departments and agencies. Staff suggested the applicant contact the departments or agencies directly with any questions or concerns. There were no more issues for discussion. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised preliminary plat to staff addressing the issues raised at the June 8, 2016, Subdivision Committee meeting. The applicant has provided a secondary access as requested by staff. The applicant has indicated at the time of final platting easements will be provided to allow the placement of trash containers as necessary for Lots 11 through 14. The request is to revise the previously approved preliminary plat for the Ensbury Neighborhood and for a replat of a number of lots within the previously platted Varennes Neighborhood. The previous approval allowed for the development of 143 lots within the Ensbury Neighborhood. There were 25 lots final platted within the Varennes Court Neighborhood. The current request is to allow 36 lots within L] August 11, 2016 SUBDIVISION ITEM NO.: C FILE NO.: S-867-EEEEE the Varennes Neighborhood and 74 lots within the Ensbury Neighborhood. All lots as proposed comply with the typical development standards of the R-2, Single-family zoning district with regard to lot dimensions, lot sizes and setbacks. The applicant is seeking to develop the subdivision utilizing both public and private streets. Section 31-207 of the Little Rock Code of Ordinances states private streets for residential development shall be discouraged. However, private streets may be approved by the Planning Commission to serve isolated developments. The design standard must conform to public street design standards. Private streets are permissible only in the form of cul de sac and short loop streets and only when it is determined that the streets can be adequately served by all public service vehicles. The streets within the Varennes Neighborhood will be developed as private streets. The streets within the Ensbury Neighborhood will be developed as public streets. There will be 7,450 linear feet of both public and private streets developed within this phase of Chenal Valley. The streets within the subdivision will be constructed as per the Master Street Plan for a residential street. Varennes Court and Ensbury Loop will be constructed 27-foot pavement width, back of curb to back of curb, within a 50-foot right of way. Varennes Cove and Ensbury Place will be constructed with a 27-foot pavement width, back of curb to back of curb, within a 45-foot right of way as allowed per the Master Street Plan for a minor residential street. The developer is proposing the use of an internalized pedestrian circulation system in -lieu of sidewalks. Section 31-175 of the Little Rock Code of Ordinances outlines the minimum design requirements for sidewalks. The ordinances states internalized pedestrian circulation systems in the form of paved pathways may be substituted for sidewalks along collector and residential streets upon approval by the Planning Commission. The first phase of the Ensbury Neighborhood is currently under construction. 40 of the proposed lots are included in the first phase. The remaining lots will be developed in no more than two (2) additional phases. Varennes Court in the Varennes Neighborhood was previously installed with the final platting of the lots. Varennes Cove will be installed to allow access to the new proposed lots in a single phase. Staff is supportive of the applicant's request for a revision to the previously approved preliminary plat and the replatting of the lots within the Varennes Neighborhood. The lots are proposed similar in size to lots within the Chenal Valley Subdivision. To staff's knowledge there are no remaining outstanding technical issues in need of addressing related to the proposed platting of the lots. M August 11, 2016 SUBDIVISION ITEM NO.: C (Cont. FILE NO.: S-867-EEEEEEEE Staff feels the request to allow the development of single-family lots is appropriate. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. PLANNING COMMISSION ACTION: (JUNE 30, 2016) The applicant was present. There were registered objectors present. The Chair stated it was the Commission's practice that when there were eight (8) or few members present the Commission offered to the applicant the ability to defer their item to a later hearing date to allow for more Commissioners to be present to hear the request. The Chair stated it took six (6) positive votes to move an item forward to the Board of Directors with a recommendation of approval. Mr. Justin T. Allen stated the owner was requesting to defer the item to the August 11, 2016, public hearing. There was no further discussion. The Chair entertained a motion for approval of the deferral request. The motion carried by a vote of 8 ayes, 0 noes and 3 absent. STAFF UPDATE: There has been no change to the application request since the previous write-up and analysis. Staff continues to recommend approval of the request. PLANNING COMMISSION ACTION: (AUGUST 11, 2016) The applicant was present. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. There was no further discussion. The item was placed on the consent agenda and approved as recommended by staff by a vote of 9 ayes, 0 noes and 2 absent. 10