Loading...
HomeMy WebLinkAboutS-0867-PPPPPPP Staff AnalysisITEM NO NAME: Chenal Valley Phase 18G Revised Preliminary Plat LOCATION: located on Chalamont Drive and Tournay Circle Planning Staff Comments: (S-867-PPPPPPP) 1. Provide notification of the abutting property owners including the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than April 25, 2012. The Office of Planning and Development must receive the proof of notice no later than May 4, 2012. 2. Provide a 10-foot no vehicular access easement along the front of Lots 19 — 26 Block 69. Variance/Waivers: 1. A variance from Section 31-256 to allow a 15-foot platted building line for Lots 27 & 28 Block 68 and a 20-foot platted building line for Lots 19 - 26 Block 69. 2. A variance from the City's Land Alteration Ordinance to allow advanced grading of selected lots within Blocks 68 and 69 with the installation of the roads, water and sewer. Public Works Conditions: 1. Vegetation must be established on disturbed area within 21 days of completion of harvest activities where construction is not imminent. 2. Erosion controls must be installed to reduce discharge of polluted stormwater. 3. If the lots have not been final platted, a grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 4. Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. 5. Prior to construction of retaining walls, an engineer's certification of design and plans must be submitted to Public Works for approval. After construction, an as -built certification is required for construction of the retaining wall. 6. No residential waste collection service will be provided on private streets unless the property owners association provides a waiver of damage claims for operations on private property. If collection services are desired, the private drive surface must be 20 feet in width and signed for no parking. 7. The northern radius of the alley should be designed and constructed for a B-40 vehicle (garbage truck). The plan should show the maneuvering track of the vehicle. Utilities and Fire Department/County Planning: Item # 1. Wastewater: Sewer available to this project. ' Contact Little Rock Wastewater for questions concerning this request or additional information. Entergy: Owner/developer to pay cost of any line/pole relocation. Contact Entergy for additional information. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Contact Central Arkansas Water if additional fire protection or metered water service is required. Contact Central Arkansas Water regarding the size and location of the water meter. Fire Department: Place fire hydrants per code. Maintain access at least 20-feet wide. There must be two -ways to exit and enter the subdivision. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: There is no connectivity within the development. If Lot #29 wants to visit backyard neighbor at Lot #8, he must drive past 12 driveways first. Contact CATA for additional information. Parks and Recreation: No comment received. Planning Division: No comment. Landscape: No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, April 25, 2012. Item # 1. June 21, 2012 ITEM NO.: C FILE NO.: S-867-PPPPPPP NAME: Chenal Valley Phase 18G Revised Preliminary Plat LOCATION: Located on Chalamont Drive and Tournay Circle DEVELOPER: Deltic Timber 7 Chenal Club Circle Little Rock, AR 72223 FNC;INFFR- White-Daters and Associates 24 Rahling Circle Little Rock, AR 72223 AREA: 1.7 acres CURRENT ZONING PLANNING DISTRICT CENSUS TRACT NUMBER OF LOTS: 8 R-2, Single-family 19 - Chenal 42.13 VARIAN C ESMAIVERS REQUESTED: FT. NEW STREET: 0 LF 1. A variance from Section 31-256 to allow a 15-foot platted building line for Lots 27 & 28 Block 68 and a 20-foot platted building line for Lots 19 - 26 Block 69. 2. A variance from the City's Land Alteration Ordinance to allow advanced grading of selected lots within Blocks 68 and 69 with the installation of the roads, water and sewer. A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT: The applicant is requesting a revision to the previously approved preliminary plat for a portion of Phase 18G Chenal Valley Subdivision. The request includes the allowance of a 15-foot platted building line for Lots 27 and 28 Block 68 and a 20-foot platted building line for Lots 19 — 26 Block 69. The applicant is also requesting a variance from the City's Land Alteration Ordinance to allow June 21, 2012 SUBDIVISION ITEM NO.: C Cont. FILE NO.: S-867-PPPPPPP advanced grading of Lots 23 — 29 Block 68. The applicant is requesting to clear and grade a multi -lot area where construction of the new homes is not imminent. The applicant proposes to serve Lots 19 — 26 Block 69 with an 18-foot rear private drive. The applicant has indicated garbage collection will be off the private drive. EXISTING CONDITIONS: The Phase I portion of the subdivision has developed and has been final platted. There are currently a number of new homes both completed and under construction. The Phase II portion of the subdivision is under construction. The area is developing with single-family homes as a part of the Chenal Valley Subdivision. There is an existing school to the east, Joe T Robinson School which contains a middle and high school on the same campus. There is an elementary school located along Cantrell Road near the intersection of Chalamont Drive with Cantrell Road on the northeast corner of Morgan Cemetery Road and Cantrell Road. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has not received any comment from area residents. All abutting property owners were notified of the public hearing. The Coalition of West Little Rock Neighborhoods was notified of the proposed plat request. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Vegetation must be established on disturbed area within 21-days of completion of harvest activities where construction is not imminent. 2. Erosion controls must be installed to reduce discharge of polluted stormwater. 3. If the lots have not been final platted, a grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 2 June 21, 2012 SUBDIVISION ITEM NO.: C (Cont.) FILE NO.: S-867-PPPPPPP 4. Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. 5. Prior to construction of retaining walls, an engineer's certification of design and plans must be submitted to Public Works for approval. After construction, an as -built certification is required for construction of the retaining wall. 6. No residential waste collection service will be provided on private streets unless the property owners association provides a waiver of damage claims for operations on private property. If collection services are desired, the private drive surface must be 20 feet in width and signed for no parking. 7. The northern radius of the alley should be designed and constructed for a B-40 vehicle (garbage truck). The plan should show the maneuvering track of the vehicle. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available to this project. Contact Little Rock Wastewater for questions concerning this request or additional information. Enter : Owner/developer to pay cost of any line/pole relocation. Contact Entergy for additional information. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Contact Central Arkansas Water if additional fire protection or metered water service is required. Contact Central Arkansas Water regarding the size and location of the water meter. 9 June 21, 2012 SUBDIVISION ITEM NO.: C(Cont.)FILE NO_: S-867-PPPPPPP Fire ❑e artment: Place fire hydrants per code. Maintain access at least 20-feet wide. There must be two -ways to enter and exit the subdivision. Contact the Little Rock Fire Department for additional information. Counly Planning: No comment. CATA: There is no connectivity within the development. If Lot #29 wants to visit backyard neighbor at Lot #8, he must drive past 12 driveways first. Contact CATA for additional information. Parks and Recreation: No comment received. F. ISSUESITECHNICALIDESIGN: Planning Division: No comment. Landscape: No comment. G. SUBDIVISION COMMITTEE COMMENT: (April 19, 2012) Mr. Joe White of White-Daters and Associate was present representing the request. Staff presented an overview of the development stating there were few outstanding technical issues associated with the request. Staff requested Mr. White provide a 10-foot no right of vehicular access easement along the front of Lots 19 — 26 Block 69. Public Works comments were discussed. Staff stated vegetation was to be reestablished on disturbed areas within 21-days of completion of grading activities. Staff stated repair of damage to the public and private streets due to hauling operations for development of the subdivision would be repaired by the developer. Staff stated the northern radius of the alley should be designed and constructed to allow a turning radius for large vehicles such as a garbage truck. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised preliminary plat to staff addressing the comments raised at the April 19, 2012, Subdivision Committee meeting. The revised plan includes the placement of a 10-foot no right of vehicular access easement along the street frontage for the lots proposed with a rear drive access. 4 June 21, 2012 SUBDIVISION ITEM NO.: C Cont. FILE NO.: S-867-PPPPPPP The revised plan has included a radius for the alley to allow for turning of a large vehicle such as a garbage truck. The request is a revision to a previously approved preliminary plat for a portion of Phase 1 BG of the Chenal Valley Subdivision. The request includes a variance to allow a 15-foot front platted building line for Lots 27 and 28 Block 68 and a 20-foot front platted building line for Lots 19 — 26 Block 69. The applicant has indicated due to the topography of the lots the reduced building line is necessary to allow the new homes to be constructed. The applicant proposes to serve Lots 19 — 26 Block 69 with an 18-foot rear private drive. The applicant has indicated garbage collection will be off the private drive. The plat includes the placement of a 10-foot no right of vehicle access along these lots to eliminate the placement of driveways on Tournay Circle. The applicant has indicated the grade of the drives if placed on Tournay Circle would be so significant entering and exiting the driveways would be difficult. The request also includes a variance from the City's Land Alteration Ordinance to allow advanced grading of Lots 23 — 29 Block 68. The applicant is requesting to clear and grade a multi -lot area where construction of the new homes is not imminent. The applicant has indicated all vegetation will be reestablished per the City's Land Alteration Ordinance. I. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs ❑, E and F of the agenda staff report. Staff recommends approval of the variance request to allow a 15-foot front platted building line for Lots 27 and 28 Block 68 and a 20 foot front platted building line for Lots 19 — 26 Block 69. Staff recommends approval of the variance from the City's Land Alteration Ordinance to allow advanced grading of the indicated lots as proposed by the applicant. PLANNING COMMISSION ACTION: (MAY 10, 2012) The applicant was present. There were no registered objectors present. Staff presented the item stating the applicant had failed to notify property owners as required 5 June 21, 2012 SUBDIVISION ITEM NO.: C (Cont. ILE NO.: S-867-PPPPPPP by the Commission's By-laws. Staff presented a recommendation of deferral of the item to the June 21, 2012, public hearing. There was no further discussion of the item. The Chair entertained a motion for approval of the item as presented by staff on the Consent Agenda. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. STAFF UPDATE: The applicant has provided notice to abutting property owners as required by the Commission's By-laws. To staffs knowledge there are no outstanding technical issues associated with the request. Staff recommends approval of the request as noted in the recommendation section of the previous write-up. PLANNING COMMISSION ACTION: (JUNE 21, 2012) Mr. Joe White of White-Daters and Associates was present representing the request. There were no registered objectors present. Staff presented the item stating the applicant had provided notice to abutting property owners as required by the Commission's By-laws. Staff stated to their knowledge there are no outstanding technical issues associated with the request. Staff presented a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff presented a recommendation of approval of the variance request to allow a 15-foot front platted building line for Lots 27 and 28 Block 68 and a 20-foot front platted building line for Lots 19 — 26 Block 69. Staff presented a recommendation of approval of the variance request from the City's Land Alteration Ordinance to allow advanced grading of Lots 10, 11 and 12 Block 69 and Lots 23-29 Block 68. There was no further discussion of the item. The item was placed on the consent agenda and approved as recommended by staff by a vote of 11 ayes, 0 noes and 0 absent. 1.1