Loading...
HomeMy WebLinkAboutS-0867-CCCCC Staff AnalysisITEM NO.: 1 Dc FILE NO.: S-867-CCCCC NAME: The Reserve at Chenal Valley Apartments Subdivisivnif� Pian Review LOCATION: Tract 75A — Chenal Valley, south of Rahling Road Planning Staff Comments: I . Provide notification of property owners located within 200-feet of the site, complete f with the certified abstract list, notice form with affidavit executed and proof of ailing. 2. Provide details of any proposed signage (height/area/location). 2 m 3. Provide details of any proposed fencing (height/material/location). J 4. Will there be one location for the garbage collection? If others are proposed indicated on the site plan the location along with the proposed screening. 5. Any site lighting must be low level and directional, directed inward away from residentially zoned properties. 6. Will there be an on -site manager? 7. Provide all building setback dimensions and the dimensions between buildings. 8. Building setbacks should be equal to the height of the building from the property lines. There are locations this is not the case. Building separation should be a minimum of 10-feet. 9. Identify the activity court located by the swimming pool. 10. Provide the bedroom mix in the general notes section of the site plan. 11. Provide construction materials of the buildings including roofing material. 12. The site plan indicates 492 parking spaces and only 372 spaces would typically be required. Does in fact the development need all the parking that is proposed? 3 Variance/Waivers: 1. Reduced side and rear and setback along the east west and south property lines. � Y 9 P p Y �j Public Works: 1. A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans 3 will need to be submitted and approved prior to the start of construction. 2. Prepare a letter of pending development addressing street lights as required by Section 31-403 of the Little Rock code. Contact Traffic Engineering at (501) 379- r 1813 (Steve Philpott) for more information regarding street light requirements. 3. Driveway width does not meet the access and circulation requirements of Sections .� 30-43 and 31-210. The width of driveway must not exceed 36 feet. The location of the driveway across from a collector street that may someday meet signal warrants is also a concern. A meeting with Public Works staff is suggested. Utilities and Fire Department/County Planning: Wastewater: Sewer available, not adversely affected. Capacity contribution analysis required. Contact Little Rock Wastewater Utility at 688-1414 for additional information. Entergy: No comment received. Center -Point Energy: Approved as submitted. SBC: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A Capital Investment Charge based on the size of the meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all meter connections including any metered connections off the private fire system. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. This development will have minor impact on existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Contact Central Arkansas Water at 992-2438 for additional details. Fire Departmen : Approved as submitted. County Planning: No comment received. CATA: No comment received. Plannina Division: No comment. Landscape_: The required full averag e A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall or dense evergreen plantings, is required along the eastern, western and southern perimeters abutting single-family properties. An irrigation system to water landscaped areas will be required. Prior to obtaining a building permit, it will be necessary to provide landscape plans stamped with the seal of a Registered Landscape Architect. The City Beautiful Commission recommends preserving as many existing trees as feasible on this tree -covered site. Extra credit toward fulfilling landscaping, requirements can be given when properly preserving trees of six (6) inch caliper or larger. Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the additional information as noted above) to staff on Wednesday, October 1, 2003. October 16, 2003 ITEM NO.: 1 FILE NO.: S-867-CCCCC NAME: The Reserve at Chenal Valley Apartments Subdivision Site Plan Review LOCATION: Tract 75A, Chenal Valley Subdivision, south of Rahling Road DEVELOPER: The Reserve at Chenal Valley Apartments, LLC 7570 Madison Road Madison, MS 39110 ENGINEER: White-Daters and Associates #24 Rahling Circle Little Rock, AR 72223-9187 AREA: 16.78 acres CURRENT ZONING PLANNING DISTRICT NUMBER OF LOTS: 1 FT. NEW STREET: 0 MF-18, Multi -family 18 units per acre 19 - Chenal CENSUS TRACT: 42.11 VARIANCES/WAIVERS REQUESTED: 1. Reduced building setback on the east and south property lines. 2. A variance to allow the clearing of the required land use buffer along the east property line. A. PROPOSAL: The applicant proposes the construction of 19-buildings containing 248 units of multi -family housing on this 16.78-acre site. The proposal includes the buildings to be two and three story with a maximum building height of 35-feet. There will be 72-1 bedroom units, 120-2 bedroom units and 56-3 bedroom units. All the October 16, 2003 SUBDIVISION ITEM NO.: 1 (C C FILE NO.: S-867-CCCCC units will have 9-foot ceilings and ceramic tile entryways and kitchen flooring. Exterior construction will be of frame structure with hardi-plank and brick exterior. The proposed density of the development is 14.77 units per acre. Each building will be constructed around outdoor landscaped common areas, concentrating on easy access to outside amenities and parking. Common area amenities include volleyball court, lighted tennis court, swimming pool with decorative fountains and accent lighting, abundantly landscaped outside cabana with fireplace and Jacuzzi, fitness center, 24-hour business center, indoor children's play room, walking natural trail limited access gate system and clubhouse. The applicant is requesting a reduced setback along the east and south property line for the proposed development. EXISTING CONDITIONS: The site is a vacant wooded east is zoned C-1 and 0-3 constructed a short distance Carrington Park Apartments. Further west of the site is Development. The area to residential uses. site sloping from north to south. The area to the and is also vacant. Champlin Drive has been and the area zoned MF-18 has developed as the The area to the west is also vacant and zoned 0-2. The Villages at Chenal Planned Commercial the north is wooded and vacant, zoned for non - NEIGHBORHOOD COMMENTS: As of this writing, staff has not received any comment from area residents. The Chenal Ridge Property Owners Association was notified of the Public Hearing along with all owners of property located within 200-feet of the site. ENGINEERING COMMENTS: Public Works: 1. A grading permit in accordance with Section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. 2. Prepare a letter of pending development addressing streetlights as required by Section 31-403 of the Little Rock code. Contact Traffic Engineering at (501) 379-1813 (Steve Philpott) for more information regarding street light requirements. 3. Driveway width does not meet the access and circulation requirements of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet. The location of the driveway across from a collector street that may someday meet signal warrants is also a concern. A meeting with Public Works staff is suggested. 2 October 16, 2003 SUBDIVISION ITEM NO.: 1 Cont. FILE NO.: S-867-CCCCC E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available, not adversely affected. Capacity contribution analysis required. Contact Little Rock Wastewater Utility at 688-1414 for additional information. Entergy: No comment received. Center -Point Ener : Approved as submitted. SBC: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A Capital Investment Charge based on the size of the meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all meter connections including any metered connections off the private fire system. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. This development will have minor impact on existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Contact Central Arkansas Water at 992- 2438 for additional details. Fire Department: Approved as submitted. County Planning: No comment received. CATA: No comment received. F. ISSUES/TECHNICAL/DESIGN: Planning Division: No comment. Landscape: The required full average width of the eastern land use buffers abutting single family residential properties is 48 feet. An average of 70% (33.6 feet) of this buffer is required to remain undisturbed. The plan submitted does not fulfill this requirement. 91 October 16, 2003 SUBDIVISION ITEM NO.: 1 Cont. FILE NO.: S-867-CCCCC A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall or dense evergreen plantings, is required along the eastern perimeter abutting single-family properties. An irrigation system to water landscaped areas will be required. Prior to obtaining a building permit, it will be necessary to provide landscape plans stamped with the seal of a Registered Landscape Architect. The City Beautiful Commission recommends preserving as many existing trees as feasible on this tree -covered site. Extra credit toward fulfilling landscaping, requirements can be given when properly preserving trees of six (6) inch caliper or larger. G. SUBDIVISION COMMITTEE COMMENT: (September 25, 2003) Mr. Joe White was present representing the request. Staff presented an overview of the proposed development indicating the request was for a subdivision site plan review. Staff noted there were areas in which the required building setbacks and buffers were not being met. Staff also stated all buildings should be separated by a minimum of 10-feet. Staff requested the applicant include the bedroom mix in the general notes section of the site plan. There was a general discussion concerning the trash compactor and the indicated location. Staff noted persons living near the front of the complex would have to travel a great distance to deposit their garbage. Staff suggested the applicant consider placing two trash collection locations on the site. Public Works comments were addressed. Staff stated there were concerns with the location of the driveway. Staff requested the applicant meet with staff independently to determine the most desirable location for the driveway. Landscaping comments were addressed. It was determined only a small portion of the eastern perimeter would require buffering. Staff noted the zoning along the western perimeter was zoned 0-2 which would not require buffering by this development. Staff noted the screening requirements and the requirement of an irrigation system to water landscaped area. Staff noted the development did not have any emergency exit. Mr. White stated the driveway was split and the Fire Department had been allowing this arrangement as the secondary entrance. Staff noted comments from the Fire Department, Central Arkansas Water and the Little Rock Wastewater department. Mr. White stated he would contact these agencies individually for further clarification. 4 October 16, 2003 SUBDIVISION ITEM NO.: 1(Cont.)FILE NO.: S-867-CCCCC There was no further discussion of the item; the Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised plan to staff addressing the issues raised at the September 25, 2003 Subdivision Committee meeting. The applicant has dimensioned all building setbacks, provided details of proposed signage and fencing. The applicant has indicated signage will comply with signage allowed in multi -family zones or a maximum of six feet in height and twenty-four square feet in sign area. The applicant has also indicated fencing will be vertical picket square steel tube with horizontal runners. The proposed fence will be a maximum of six feet in height. There are two locations in which the building does not meet the required building setback. In one location along the eastern property line the proposed building setback is 34.95 feet and along the south property line the maintenance building is proposed at 27-feet. Staff feels these setbacks are acceptable. The proposed building height is 35-feet on the apartment buildings and the maintenance building is proposed as a single -story building. The applicant has met with Public Works staff concerning the driveway location. Staff is agreeable to the driveway location but is requesting the applicant design the driveway to match the street design across Rahling Road. There is sufficient area for the drive to be designed as development becomes more immediate. The applicant is proposing the development to be a gated community. There are two sets of gates on the site. The gates will be designed with a center isle allowing the entering and exiting traffic to be separated. The drive lanes are proposed at 23-feet and the divided arrangement is acceptable to the Fire Department by allowing access to the development if a car were stalled in the drive lane. The proposed site plan indicated 492 parking spaces. The typical minimum parking requirement for a multi -family development would be one and one-half spaces per unit. The development includes 248 units resulting in a typical minimum -parking requirement of 372 spaces. The proposed parking is more than adequate to meet the typical minimum parking demand. The applicant has proposed a trash compactor on the site. There is only one location for collection proposed. The applicant has indicated the compactor will be placed in a well and a solid brick fence installed above grade for safety. The applicant is requesting a reduced land use buffer along the eastern perimeter where the site abuts single-family zoned property. The required buffer in this area of 33.6 feet is to remain undisturbed. The applicant has requested a variance to allow the buffer area to be disturbed and to eliminate the required buffer in this area. The required buffer in this area is adjacent to the R-2 zoned property. Staff feels although zoned residentially it is very unlikely the area will develop as residential. Staff is supportive of the request to eliminate the land use buffer in this area. 5 October 16, 2003 SUBDIVISION ITEM NO.: 1 Cont. FILE NO.: S-867-CCCCC To staff's knowledge there are no other outstanding issues associated with the proposed request. The proposed development is zoned MF-18 and the proposed density is 14.77 units per acres. Staff feels the proposed development should have minimal to no adverse impact on the surrounding area if constructed as proposed. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the conditions outlined in paragraphs D, E and F of the staff report. Staff recommends approval of the requested variance to allow a reduced setback along the east and south property line. Staff recommends approval of the requested variance to allow the clearing of the required land use buffer along the eastern perimeter. PLANNING COMMISSION ACTION: (OCTOBER 16, 2003) Mr. Joe White was present representing the request. There were no registered objectors present. Staff stated to their knowledge there were no outstanding issues associated with the proposed request. Staff presented a recommendation of approval of the request subject to compliance with the conditions outlined in paragraphs D, E and F of the above report. Staff also recommended approval of the requested variance to allow a reduced setback along the east and south property line. Staff presented a recommendation of approval of the requested variance to allow the clearing of the required land use buffer along the eastern perimeter. There was no further discussion of the item. The item was placed on the consent agenda and approved as recommended by staff by a vote of 9 ayes, 0 noes and 2 absent. C�