HomeMy WebLinkAboutS-0867-GGG Staff AnalysisZoned "R—Z
Zoned 11R-2
KEY MAP
N.T.S
his Project
ND p sn 150
Scale 1" = 50 ft
LEGAL DESCRMTION
Part of the NE 1/4. NE 1/4. Section 36, T-2-14, R-14-W
PabeAi Co• ty, N4amas, mare Wicabry d—"d s
commencm9 al the SW r
c al said NE 1/4, NE 1/4;
Thence Soalh 66 Gag— 26 Minaln 21 Ssaonds Earl
along 1he South rim of sold WE 1/4, NE 1/4.
a dbtnnce of 620.57 feet 1e the POINT OF BEOORIING:
Thence North"
De9rees 10 Minaln 19 Ssaafds West,
o ZManc4 of 49519 teal to a Point;
Thence North 65 Degrees 12 M-1l 07 Seconds Earl,
a dni — of 104406 feel to a Pahl on the
Eosl Ilse of said NE 1/4, NE 1/4;
6,9 ALTes The.•4r Sftdh o1 (Wen $1 Minoln 59 S4conde Wesl
26,1 LIS along sold East line, o dhtonp Of 90965 Inl to the
SE comer of said NE 1/4, NE 1/4.
Thence North 86 De9reee 26 Mingles 21 Secende West
ab ng Ihs Soalh line of saidNE 1/4, NE 1/4.
a d'istanc4 of 715.40 Inl to Ob PONT OP BEGINNING
containi, 56 3662 sgaan feel or 13 40 ecru, a or by
PARKING SPACES
UNIT TYPE
BR/BA SQ FT / OF UNITS %
REQUIRED
At
I BR/I BA 662 (LOITER) 36 17.0
36
793 (UPPER)
A2
I BR/I BA 851 36 17.0
36
A3
I BR/I BA 772 16 7.5
16
Bf
2 BR/2 BA 1022 (LOITER) 52 245
78
1073 (UPPER)
B2
2 BR/2 BA 1264 (LOWER) 52 24.5
78
1305 (UPPER)
CI
3 BR/2 BA 1403 (UPPER) LOWER 20 9 6
40
TOTAL
SYNOPSIS
UNIT YIXF�'
to UNITS/10
12 CARAGESCE)
2A1 2A2 2B1 2B2 2C1
BLDG. Trp/v I1 IS BLDGS.)
2Ar14 U2AYS2A3 4D1us82 GES EA.
PARIaNC SPACES PROVIDED
120 GARAGES
270 SURFACE
390 TOTAL (1.84 SPACES/UNIT)
O �
Obi I
sy �
U t
d �
.� O
N
CARRINGTON PARK
AT
CHENAL VALLEY
Owner & Developer:
Davis Development
250 Corporate Center Court
P.O. Box 508
Stockbridge, Georgia 30281