Loading...
HomeMy WebLinkAboutS-0867-BBB Staff AnalysisJune 6, 1996 ITEM N IA FILE NO,: S-867-BEB NAME: CHENAL VALLEY -- PRELIMINARY PLAT LOCATION: On Chenal Parkway at NW corner of west loop arterial DEVELOPER DELTIC FARM AND TIMBER #7 Chenal Club Circle Little Rock, AR 72211 821-5555 AREA: 118.18 ACRES ZONING: MF-24, 0-2, C-3 ENGINEER: WHITE-DATERS & ASSOC., INC. 401 Victory Street Little Rock, AR 72201 374-1666 NUMBER OF LOTS: 5 FT. NEW STREET: 3,200 PLANNING DISTRICT: Chenal (19) CENSUS TRACT: 42.06 VARIANQES REQUESTED: None BACKGROUND: PROPOSED USES: Office/Commercial and Multifamily This plat is a preparatory action to opening a new mixed use area within Chenal Valley Subdivision. Several of the lots will be developed as MF, and a large portion devoted to office uses, possibly commercial. A number of streets attach to this plat with all of Chenal Valley Drive along the east side being constructed in Phase I. TATFTE T OF PA P AL: To plat five lots on a large undeveloped, tree covered hill mass. To create one or more new streets to handle access, thru traffic and Master Street Plan requirements. A. PROPOSAL/REQUEST: To gain plat approval of five lots with a phasing scheme to permit one lot finals or perhaps revise portions for further reduction in lots sizes to accommodate the market need. Only one lot is to be initially filed for record. That one for an apartment complex. June 6, 1996 SUBDIVISION ITEM NO.t 1 (Cont.) _ FILE Na.: S-867-BBB B. EXISTING CONDITIONS: Gently sloping ground with a high point in the center of the plat and falling away to the plat boundaries. The site is timber covered with no existing roads internally except an access trail to a water tank site. This road will be eliminated once construction begins on the first phase. C. ENGINEERING/UTILITY COMMENTS: PUBLIC WORKS COMMENTS: A grading and NPDES permit may be required. Map has changed that designates flood areas current map is the 11-3-93 FIRM map. Master Street plan right-of-way and street improvements associated with Preliminary Plat are required. Dedicate and construct a right -turn lane where collector Chenal Valley Drive intersects the Outer Loop. Stormwater Detention analysis is required. Locate PAGIS monuments and identify other point monuments. Utilities: Sewer/main required with easements. Water/on the plat, mains and on -site' -fire protection system required. Certain charges apply. Contact Water Works. D. ISSUES/LEGAL TECHNICAL/DESIGN: Indicate phasing plan.. Need Bill of Assurance. Indicate driveway access plan or points. Indicate how sidewalks fit overall pedestrian plan. E. ANALYSIS• This review does not reveal issues or problems that cannot be resolved prior to the public hearing. The detention issue and treatment of turn lanes or specific traffic concerns can be dealt with at final plat when developing street design plans. F. 9TAFF RE MME ATI S• Approval of the plat subject to resolution of the several items addressed by staff. 2 June 6, 1996 SUBDIVISION ITEM NQ.; 1 (QontJ _ FILE NQ „ S-867-BBB SUBDIVISI N COMMITTEE CODR4RNT: (MAY 16, 1996) Mr. Joe White was present, representing both the site plan and the preliminary plat that accompanies it. Mr. White presented an overview of the proposal and responded to the written comments of staff. Mr. White stated that the subdivider will build all of Chenal Valley Drive with this project. Wood asked that Mr. White address the subject of access overall since the lot in this plat is one of several in a mixed use plat. Mr. White and David Scherer, of Public Works, discussed turn lanes and the overall size of the lots being controlling element. No specific resolution was gained. However, Mr. White indicated that further subdivision of this plat area may bring an internal street and solve some access problems. Mr. Scherer suggested dealing with detention on this site by designating ponding areas, etc. Mr. White stated that detention would be dealt with on the preliminary plat. Wood, of the Planning Staff, then moved the conversation to site plan needs and provision of typicals to illustrate the building areas, height, dimensions, etc. Mr. White will respond by submitting the plan need to the architect. They will better label items and resubmit the plan by May 23rd. 3