Loading...
HomeMy WebLinkAboutS-0867-AAA Staff AnalysisJune 6, 1996 ITEM NO_: 26 FILE NO.: 5-867-AAA NAME: CHENAL VALLEY APTS. -- SUBDIVISION SITE PLAN REVIEW LOCATION: On the west side of proposed Chenal Valley Drive north of the intersection with the west loop arterial DEVELOPER MLP INVESTMENTS, L.L.C. 11780 Manchester Rd. Suite 207 Des Peres, MO 63131 .AREA: 17.80 ACRES ZONING: MF-24 ENGINEER• WHITE-DATERS & ASSOC., INC. 401 Victory St. Little Rock, AR 72201 374-1666 NUMBER OF LOTS: 1 FT. NEW STREET: 0 PLANNING DISTRICT: Chenal (19) CENSUS TRACT: 42.06 VARIANCES REQUESTED: None BACKGROUND: PROPOSED USES: Apartment This apartment site was established early in the overall planning of Chenal Valley. The adjacent street system complies with and aligns as required by the Master Street Plan. STATEMENT OF PROPOSAL: This developer's plan includes 302 units on a 17.80 acre site which will provide 16 plus units per acre. The buildings are two-story with a mix of 1, 2 and 3 bedroom. The project will be a gated community with one access provided by way of the proposed Chenal Valley Dr. (a new collector street). The Plan consists of seventeen (17) building clusters plus a recreation facility with pool, tennis and clubhouse. Kiosks will be provided for central mail delivery. There will be 48 covered parking spaces in garages and a total of 530 spaces. June 6, 1996 SUBDIVI I ITEM NO.: 26 CCont._) FILE NO.: s-867-AAA • Indicate total parking and number parking area as to count. ■ Areas to be landscaped should be shown. They appear to comply. • Describe perimeter treatment. • Show any covered parking. • Show dumpster locations. ■ Providing grades in preliminary form is required. (Spot elevation) or grading plan if available. • Show handicap access and parking. ■ Need detail around clubhouse, including uses within. • Eliminate parking in intersection next to clubhouse. ■ Need information on design of indicated parking in front of several units that appear to access garages. E. ANALYSIS• The review does not reveal issues or problems that cannot be resolved prior to the public hearing. The typical item is a notation required on the drawing. Wider drives to serve the project and building detail are the issues requiring most attention. F. STAFF RECOMMENDATIONS: Approval of the Plan subject to the modification of the plan to meet the needs or design questions raised by staff. SUBDIVISION COMMITTEE COMMENT: (MAY 16, 1996) Mr. Joe White was present, representing both this site plan and the preliminary plat that accompanies it. Mr. White presented an overview of the proposal and responded to the written comments of Staff. Mr. White stated that the subdivider will build all of Chenal Valley Dr. with this project. Wood asked that Mr. White address the subject of access overall since the lot in this plat is one of several in a mixed use plat. Mr. White and David Scherer, of Public Works, discussed turn lanes and the overall size of the lots being controlling element. No specific resolution was gained. However, Mr. White indicated that further subdivision of this plat area may bring an internal street and solve some access problems. Mr. Scherer suggested dealing with detention on this site by designating ponding areas, etc. Mr. White stated that detention would be dealt with on the preliminary plat. 3 June 6, 1996 SUBDIVISION ITEM NO.: 26 Cont. FILE - 67-AAA A. B. C. PROPOSAL/REQUEST: To create a medium density MF project on a large lot abutted by Office and MF zoned land. To create a new street system to provide access. To develop the land in accordance with the adopted Land Use Plan. EXISTING CONDITIONS: Gently sloping ground with a high point in the center of the project and falling away to all boundaries. The site is timber covered and undisturbed except for an access road to a water tank site. This road will be eliminated in this plan. ENGINEERING/UTILITY COMMENTS: PUBLIC WORKS COMMENTS: A grading and NPDES permit may be required. Map has changed that designates flood areas current map is the 11-3-93 FIRM map. Master Street Plan right-of-way and street improvements associated with Preliminary Plat are required. Dedicate and construct a right -turn lane where collector Chenal Valley Drive intersects the Outer Loop. Stormwater Detention analysis is required. Locate PAGIS monuments and identify other point monuments. Staff has several concerns related to circulation, drive widths (recommend 20 foot parking and 30 foot drives), access to Collector without a right -turn lane shown. This complex will generate collector street traffic to be funneled to a collector with one access point. Utilities: Sewer/main required with Water/on the plat, mains system required. Certain Contact Water Works. D. ISSUES1 LEGAW TECHNICAL/DESIGN: easements. and on -site fire protection charges apply. • Need typical on building types/No. 2 or 3 bedrooms, two- story, etc. • Need typical dimension on foundation line of units, and space between buildings. ■ Show height of buildings per zoning Ordinance definition. 2 June 6, 1996 SUBDIVISION ITEM INTO._: 26 _LCont .-) _ FILE NO.: S-867 -AAA Wood, of the Planning Staff, then moved the conversation to site plan needs and provision of typicals to illustrate the building areas, height, dimensions, etc. Mr. White will respond by submitting the plan need to the architect. They will better label items and resubmit the plan by May 23rd. SUBDIVISION COMMITTEE COMMENT: (MAY 28, 1996) This applicant responded very well to the comments in the staff write-up. The following are the items of information which have been placed on the revised drawings: Changes on Revised Plan 1. Typical building floor plans shown 2. Foundation dimensions shown by typical 3_ Height of buildings is two and three story mix maximum of 45 feet. 4. Total parking is 578 cars for 292 units. 5. Landscaping noted as: "to be per ordinance". 6. Perimeter treatment indicated as a 39± feet minimum natural or landscaped. 7. Covered parking is shown for 30 cars. 8. Dumpster site identified. 9. Handicap parking is shown. 10. Uses and areas around clubhouse identified. 11. Club to consist of lounge, workout and office. Remaining Issues 1. The fourteen parking spaces in front of clubhouse in the intersection. 2. Pedestrian or other walk/service areas. 3. Treatment on entry walls. How tall, material, etc. PLANNING COMMISSION ACTION: (TUNE 6, 1996) Staff reported there were no remaining issues of consequence to be resolved. The item was placed on the Consent Agenda for approval. A motion to approve the Consent Agenda was made and passed by a vote of 10 ayes, 0 nays and 1 absent. 4