Loading...
HomeMy WebLinkAboutS-0867-WW Staff Analysisi October 31, 1995 ITEM N FILE NO.: -8 7-WW NAME: CHENAL VALLEY "DUQUESNE" COMMUNITY -- PRELIMINARY PLAT LOCATION: Southwest of Chenal Parkway, approximately 0.25 mile south of the Cantrell Road intersection DEVELOPER: ENGINEER: Jack McCray Joe White DELTIC FARM & TIMBER CO., INC. WHITE-DATERS & ASSOCIATES, INC. #7 Chenal Club Circle 401 S. Victory St. Little Rock, AR 72211 Little Rock, AR 72201 821-5555 374-1666 AREA: 81.23 ACRES NUMBER OF LOTS: 191 FT. NEW STREET: 12,300 ZONING: R-2 PROPOSED USES: Single -Family Residential PLANNING DISTRICT: 19 CENSUS TRACT: 42.06 VARIANCES REQUESTED: None TATEMENT QF PROPO AL: The applicant proposes a preliminary plat of an 81.23 acre tract to develop a 191 lot single-family subdivision. Access to the "Duquesne" Community is proposed to be from a single boulevard entrance off Northfield Dr. The community is to contain 12,300 linear feet of new streets, with sidewalks, as required. A total of 13 "tracts" are shown, these being to provide access to abutting unplatted areas, for open space, at the boulevard entrance and in islands in street rights -of -way, and for stormwater detention. No variances are requested. A. PROPOSAL RE VEST: Planning Commission approval of a preliminary plat is requested. B. EXISTING CONDITIONS: The site is undeveloped and heavily wooded. The terrain is extremely hilly, with approximately 160 feet of grade differential within the site. October 31, 1995 SpBDIV'ISION ITEM(Cont.)FILE N -8 7-WH The existing zoning of the tract is R-2. There is an 0-2 and a C-2 tract abutting the property to the north; otherwise, all abutting land is zoned R-2. C. ENGINEERING/UTILITY OMME T : Public Works Staff comments: Implementation of the plan for Chenal Parkway for widening of the two lane portion to the parkway to a four -lane section, called for in the Master Street Plan, needs to be undertaken with this development. Northfield Dr. must be extended from the entrance to the subdivision to Chenal Parkway to Master Street Plan standards. The intersection of Northfield Dr. and Chenal Parkway is to be constructed in accordance with the Master Street Plan. Water courses entering the tract and the planned exit points must be shown. Rights -of -way must be dedicated for drainage channel easements exiting the tract. Stormwater detention is required. NPDES and grading permits are required. Submit a letter for street lights per Ordinance. Water Works comments that: a) water main extensions will be required, but that it is doubtful that the upper elevations of the development can be served off the existing pressure system; installation of major facilities may be needed, with hydraulic studies being needed to determine the requirements; and, b) annexation will be required. Wastewater comments that Little Rock Wastewater can only serve a part of the proposed subdivision; that the western portion of the tract is outside the present service basin and that pump stations will not be allowed to provide service to this area. Arkansas Power and Light Co. approved the submittal. Arkansas Louisiana Gas Co. approved the submittal. Southwestern Hell Telephone Co. approved the submittal. The Fire Department approved the submittal, but notes that fire hydrants will be required to be installed. 2 October 31, 1995 SUBDIVISION ITEM NO.:(ContFILE NO :n-857-WW D. ISS ES/LE AL/TEOHN1CALLDESIGN Sec. 31-89 requires that: a) a storm drainage analysis, showing drainage data for all watercourses entering and leaving the'plat"boundaries, is to be furnished; b) the names of owners of unplatted land abutting the proposed plat area are to be shown; c) all bearings and distances are to be shown for all boundary lines, and the ties to all corners of record are to be located, and sufficient curve data is to be provided to adequately describe the curve, with the minimum information being the radius, arc distance, delta angle, and chord bearing and distance; d) an accurate and adequate description of all monuments be noted, showing the size and type of material of the monuments; and e) proposed PAGIS monuments be shown. Sec. 31-91 requires that the Certificates be executed. Suggested certificate verbiage is included. Sec. 31-89 requires that the certificate include the provision that the plat has been surveyed and duly filed for record in the offices of the state surveyor and the county circuit clerk/recorder within the last 7 years. The certificates provided on the preliminary plat drawing (Surveying, Engineering, and Planning Commission) are North Little Rock certificates, not Little Rock certificates. E. ANALYSIS: The 81 acre tract, with 191 home sites and 12,300 feet of streets, is served by way of one entrance. The internal street system is limited to only standard residential streets of 27 feet in width, with no collector streets within the plat area. There is staff concern that this is insufficient access to serve this large of an area, and that access for emergency vehicles and residents could be limited if the entrance roadway were blocked. It is also noted that Northfield Dr., the collector street by which access is taken from Chenal Parkway, runs through commercial -office zoned property, and, once this non-residential area is developed, traffic to the "Duquesne" community will have to compete with the commercial traffic on Northfield Dr. Other issues noted are easily addressed, and are routinely remedied during the preliminary -final plat process. October 31, 1995 SUBDIVISION ITEM n FILE - 7-WW F. STAFF RECOMMENDATIQN : Staff recommends approval of the preliminary plat, subject to the plat being amended to provide a second, or secondary, access point to the "community" street system, and subject to the developer agreeing on a time -table and/or "trigger" for upgrading Chenal Parkway to Master Street Plan standards. SQBDIV19j1gN COMMITTEECOMMENT: (OCTOBER 12, 1995) Mr. Joe White, with White-Daters & Associates, Inc., was present. Staff outlined the proposed development, and reviewed with the applicant and the Committee members the comments contained in the discussion outline. Mr. White responded to the Public Works concern regarding improvements to Chenal Parkway, and stated that there is a commitment by the developer to make the needed improvements to Chenal Parkway as the number of lots increases. He said that he would meet with the City Engineering staff to reach an agreement on when the improvements would be "triggered". Mr. White responded to the Planning staff concerns regarding the one access point to the "community", and said that controlled and limited access to communities are specifically desired by residents. Mr. White reported that all deficiencies noted in the staff outline would be addressed. The Committee forwarded the item to the full Commission for the public hearing. PLANNING COMMISSION ACTION: (OCTOBER 31, 1995) Staff reported that all issues had been resolved; that the developer had agreed to provide a second entrance to the development for emergency vehicle access, and approval of the preliminary plat needed to be contingent upon that assurance. The item was included on the Consent Agenda, and was approved in the approval of the Consent Agenda with the vote of 9 ayes, 0 nays, 2 absent, and 0 abstentions. 4