HomeMy WebLinkAboutS-0867-QQ Staff AnalysisNovember 29, 1994
ITEM NO.: 3a FTLE Mn -$67-PP
NAME: CHENAL VALLEY, TRACT 13 -- PRELIMINARY PLAT
LOCATION: On the south side of Chenal Parkway, approximately 0.5
mile north of the Kanis Rd. intersection
DEVELOPER:
JOHN R. CARMICHAEL
ENGINEER:
WESTWOOD RESIDENTIAL COMPANY WHITE-DATERS & ASSOCIATES, INC.
5950 Berkshire Ln., 401 S. Victory St.
Suite 500, LB 43 Little Rock, AR 72201
Dallas, TX 75225 374-1666
(214) 369-9433
AREA: 17.99 ACRES NUMBER ❑F LOTS: 1 FT. NEW STREET: 4,000
(Boundary Street
improvements, only.)
ZONING: MF-24, MF-18,
& R-2 and C-2
PLANNING DISTRICT: 19
CENSUS TRACT: 42.02
VARIANCES RE ❑ESTER: None
STATEMENT OF PROPOSAL:
PROPOSED USES: Multi -Family
Residential
The applicant proposes a one -lot preliminary plat in order to
construct an apartment development. The lot/plat area will
provide for the development of a 17.99 acre site, and will
include the construction of the full width of the boundary street
along the north boundary of the site. No waivers or variances
are requested.
A. PROPOSAL RE VEST:
Planning Commission approval of a preliminary plat for a
one -lot plat is requested. No waivers or variances are
requested.
B. EXISTING CONDITIONS:
The site is undeveloped and wooded. The topography is
rolling, with a high point at the center of the tract rising
approximately 35 feet above the south and north elevations.
The median cut in Chenal Parkway is existing, and aligns
-November 29, 1994
S[ BDIVISICN
ITEM NO.: 3a (Continued) FILE NO.: S _857-PP
with the boundary street to be constructed along the
northern boundary of the proposed subdivision/lot.
The existing zoning is MF-18, MF-24, C-2, and R-2.
Surrounding the site is C-2 zoned land to the north, MF-18
to the northwest, R-2 to the west, MF-24 to the south, and
0-2 across Chenal Parkway to the east.
C. ENGINEERING/UTILITY COMMENTS:
Public Works comments that: 1) the vertical and horizontal
alignment of the street shown as Village Dr. is not
acceptable, that further review is needed, and the
intersection design will require approval; 2) the area of
the site cannot be determined, since there is no metes and
bounds legal description shown on the plat; 3) the base
flood elevation information and minimum finish floor
elevation information are required at the time a development
permit is approved; 4) sidewalks, per the Master Street
Plan, are to be shown on the plat; and, 5) the street plan,
stormwater detention and boundary survey information will be
required. (Public Works notes that the plan area is outside
the floodplain study area.)
Water Works comments that an acreage charge of $300 per acre
applies in this area, in addition to the normal connection
charges. The Fire Department will need to review the plans
to determine whether additional on -site fire hydrants will
be required.
Wastewater comments that a capacity analysis will be
required, and capacity contribution fees will be assessed.
Arkansas Power and Light Co. comments that a 15 foot
easement will be required along the north, west, and south
boundaries of the site.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. will require a 10 foot
easement along the south and east boundary of the property.
The Fire Department approved the preliminary plat without
comment.
D. ISSUES/LEGAL/TECHNIC-AL/DESIGN:
There are Public Works issues regarding the design of the
boundary street which need to be resolved. Otherwise, there
are no outstanding technical issues.
2
November 29, 1994
SUBDIVISION
ITEM NO.: 3a Continued FILE NO.: S-867-PP
E. ANALYSIS:
The proposed preliminary plat meets the requirements of the
Subdivision Regulations, except for the boundary street
design issue.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat, subject
to the applicant making the required changes to the design
of the boundary street.
SUBDIVISION COMMITTEE COMMENT: (NOVEMBER 10, 1994)
Mr. Joe White, with White-Daters & Associates, Inc., the project
engineering firm, was present. Mr. White reviewed the comments
contained in the discussion outline. Mr. White, the Public Works
staff person, and the Committee members discussed the boundary
street design issue, and Mr. White said that he could make the
needed changes to meet the Public Works design requirements. The
Committee forwarded the item to the full Commission for approval
of the preliminary plat.
PLANNING COMMISSION ACTION: (NOVEMBER 29, 1994)
Staff reported that all required changes, as brought out at the
Subdivision Committee meeting, has been made, and all concerns
had been addressed. The item was included on the consent agenda
for approval and was approved with the vote of 10 ayes, 0 nays,
1 absent, and 0 abstentions.
3