Loading...
HomeMy WebLinkAboutS-0867-QQ Staff AnalysisNovember 29, 1994 ITEM NO.: 3a FTLE Mn -$67-PP NAME: CHENAL VALLEY, TRACT 13 -- PRELIMINARY PLAT LOCATION: On the south side of Chenal Parkway, approximately 0.5 mile north of the Kanis Rd. intersection DEVELOPER: JOHN R. CARMICHAEL ENGINEER: WESTWOOD RESIDENTIAL COMPANY WHITE-DATERS & ASSOCIATES, INC. 5950 Berkshire Ln., 401 S. Victory St. Suite 500, LB 43 Little Rock, AR 72201 Dallas, TX 75225 374-1666 (214) 369-9433 AREA: 17.99 ACRES NUMBER ❑F LOTS: 1 FT. NEW STREET: 4,000 (Boundary Street improvements, only.) ZONING: MF-24, MF-18, & R-2 and C-2 PLANNING DISTRICT: 19 CENSUS TRACT: 42.02 VARIANCES RE ❑ESTER: None STATEMENT OF PROPOSAL: PROPOSED USES: Multi -Family Residential The applicant proposes a one -lot preliminary plat in order to construct an apartment development. The lot/plat area will provide for the development of a 17.99 acre site, and will include the construction of the full width of the boundary street along the north boundary of the site. No waivers or variances are requested. A. PROPOSAL RE VEST: Planning Commission approval of a preliminary plat for a one -lot plat is requested. No waivers or variances are requested. B. EXISTING CONDITIONS: The site is undeveloped and wooded. The topography is rolling, with a high point at the center of the tract rising approximately 35 feet above the south and north elevations. The median cut in Chenal Parkway is existing, and aligns -November 29, 1994 S[ BDIVISICN ITEM NO.: 3a (Continued) FILE NO.: S _857-PP with the boundary street to be constructed along the northern boundary of the proposed subdivision/lot. The existing zoning is MF-18, MF-24, C-2, and R-2. Surrounding the site is C-2 zoned land to the north, MF-18 to the northwest, R-2 to the west, MF-24 to the south, and 0-2 across Chenal Parkway to the east. C. ENGINEERING/UTILITY COMMENTS: Public Works comments that: 1) the vertical and horizontal alignment of the street shown as Village Dr. is not acceptable, that further review is needed, and the intersection design will require approval; 2) the area of the site cannot be determined, since there is no metes and bounds legal description shown on the plat; 3) the base flood elevation information and minimum finish floor elevation information are required at the time a development permit is approved; 4) sidewalks, per the Master Street Plan, are to be shown on the plat; and, 5) the street plan, stormwater detention and boundary survey information will be required. (Public Works notes that the plan area is outside the floodplain study area.) Water Works comments that an acreage charge of $300 per acre applies in this area, in addition to the normal connection charges. The Fire Department will need to review the plans to determine whether additional on -site fire hydrants will be required. Wastewater comments that a capacity analysis will be required, and capacity contribution fees will be assessed. Arkansas Power and Light Co. comments that a 15 foot easement will be required along the north, west, and south boundaries of the site. Arkansas Louisiana Gas Co. approved the submittal without comment. Southwestern Bell Telephone Co. will require a 10 foot easement along the south and east boundary of the property. The Fire Department approved the preliminary plat without comment. D. ISSUES/LEGAL/TECHNIC-AL/DESIGN: There are Public Works issues regarding the design of the boundary street which need to be resolved. Otherwise, there are no outstanding technical issues. 2 November 29, 1994 SUBDIVISION ITEM NO.: 3a Continued FILE NO.: S-867-PP E. ANALYSIS: The proposed preliminary plat meets the requirements of the Subdivision Regulations, except for the boundary street design issue. F. STAFF RECOMMENDATIONS: Staff recommends approval of the preliminary plat, subject to the applicant making the required changes to the design of the boundary street. SUBDIVISION COMMITTEE COMMENT: (NOVEMBER 10, 1994) Mr. Joe White, with White-Daters & Associates, Inc., the project engineering firm, was present. Mr. White reviewed the comments contained in the discussion outline. Mr. White, the Public Works staff person, and the Committee members discussed the boundary street design issue, and Mr. White said that he could make the needed changes to meet the Public Works design requirements. The Committee forwarded the item to the full Commission for approval of the preliminary plat. PLANNING COMMISSION ACTION: (NOVEMBER 29, 1994) Staff reported that all required changes, as brought out at the Subdivision Committee meeting, has been made, and all concerns had been addressed. The item was included on the consent agenda for approval and was approved with the vote of 10 ayes, 0 nays, 1 absent, and 0 abstentions. 3