HomeMy WebLinkAboutS-1886 ApplicationCIVIL ENGINEERING DIVISION S ep'll
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: MARANTHA ADDITION LOTS 1 & 2 -
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date:
ADDRESSING SPECIALIST REPORT
I have reviewed the plat and find that the street names and street configuration are acceptable.
Addressing Specialist Date: _
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that;
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
Traffic Engineer Date: -
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
All other requirements for final plat approval have been satisfied.
Civil Engineer I/II Date:
SURVEYOR REPORT
I have reviewed the plat and find that:
\i/ All requirements for final plat approval have been satisfied.
Surveyor Date.:
MANAG R APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
Date: 11/10/2020
Design Review Engineer/Civil Engineering Manager
Effective: November 10, 2020
Daniel Havner
From: MANION, JOSEPH E <jm4138@att.com>
Sent: Tuesday, October 27, 2020 4:31 PM
To: Tamara Guffey
Subject: RE: Plat Approval - Lots 1 & 2 Maranatha Addition
AT&T approves.
Josepk Mavtim
AT&T OSP ENGR.
501-416-5541
From: Tamara Guffey <tguffey@whitedaters.com>
Sent: Tuesday, October 27, 2020 2:26 PM
To: Vincent Hotho <Steven.Hotho@Irwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Henderson, Jeremy
<jhende9@entergy.com>; Bates, Joni B. <joni.bates@centerpointenergy.com>; cenhrt-
south_little_rock_construction@comcast.com; MANION, JOSEPH E <jm4138@att.com>
Cc: Daniel Havner <dhavner@whitedaters.com>; vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>;
Moore, Monte <M Moore@ littlerock.gov>
Subject: Plat Approval - Lots 1 & 2 Maranatha Addition
Attached for review and approval is the plat of Lots 1 and 2, Maranatha Addition, an addition to the City of Little
Rock. The purpose of this plat is to divide the property into two tracts.
May we get an email response with your comments before Friday, November 6, 2020, the approximate filing date.
Please contact Dan Haver dhayner@whitedaters.com with any questions.
Thank you for your assistance.
Tamara Guffey
Office Manager
White-Daters & Associates, Inc.
24 Rahling Circle
Little Rock, AR 72223
P: (501) 821-1667
F: (501) 821-1668
Daniel Havner
From: Jason Lowder <Jason.Lowder@carkw.com>
Sent: Friday, October 30, 2020 9:24 AM
To: Tamara Guffey
Subject: RE: [External] Plat Approval - Lots 1 & 2 Maranatha Addition
Central Arkansas Water approves with no comments.
Respectfully,
Jason Lowder, Engineering Technician
jason.lowder@carkw.com
501-377-1245
�sater
CwA rlekooco"
From: Tamara Guffey <tguffey@whitedaters.com>
Sent: Tuesday, October 27, 2020 2:26 PM
To: Vincent Hotho <Steven.Hotho@Irwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Henderson, Jeremy
<jhende9@entergy.com>; Bates, Joni B. <joni.bates@centerpointenergy.com>; cenhrt-
south_little _ rock _construction@comcast.com; Joseph Manion (jm4138@att.com) <jm4138@att.com>
Cc: Daniel Havner <dhavner@whitedaters.com>; vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>;
Moore, Monte <MMoore@little rock.gov>
Subject: [External] Plat Approval - Lots 1 & 2 Maranatha Addition
FCAUTION:I This email originated from outside of the CAW. Do not click links or open attachments unless you recognize
the sender and know the content is safe.
Attached for review and approval is the plat of Lots 1 and 2, Maranatha Addition, an addition to the City of Little
Rock. The purpose of this plat is to divide the property into two tracts.
May we get an email response with your comments before Friday, November 6, 2020, the approximate filing date.
Please contact Dan Haver dhavner@whitedaters.com with any questions.
Thank you for your assistance.
Tamara Guffey
Office Manager
White-Daters & Associates, Inc.
24 Rahling Circle
Little Rock, AR 72223
P: (501) 821-1667
Daniel Havner
From: Gober, Adam P <adam.gober@centerpointenergy.com>
Sent: Wednesday, October 28, 2020 7:11 AM
To: Tamara Guffey
Cc: Bates, Joni B.; Evenson, Suzanne C
Subject: FW: [External Email] Plat Approval - Lots 1 & 2 Maranatha Addition
Attachments: PLAT_preliminary.pdf
Good morning Tamara,
CenterPoint Energy approves the proposed replat.
Thank you,
Adam P. Gober
CW&ypointl Engineer I AR/OK Region
501.377.4737 w. 1501.541.7509 c.
E06y CenterPointEnergy.com
0000
From: Bates, Joni B. <joni.bates@centerpointenergy.com>
Sent: Tuesday, October 27, 2020 2:31 PM
To: Gober, Adam P <adam.gober@centerpointenergy.com>
Subject: FW: [External Email] Plat Approval - Lots 1 & 2 Maranatha Addition
Sorry
Joni Bates
Marketing Coordinator
CenterPoint Energy
501-377-4558
Eef►
From: Tamara Guffey <tguffey@whitedaters.com>
Sent: Tuesday, October 27, 2020 2:26 PM
To: Vincent Hotho <Steven.Hotho@lrwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Henderson, Jeremy
<ihende9@entergy.com>; Bates, Joni B. <joni.bates@centerpointenergy.com>; cenhrt-
south little rock construction@comcast.com; Joseph Manion (im4138@att.com) <im4138@att.com>
Cc: Daniel Havner <dhavner@whitedaters.com>; vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>;
Moore, Monte <MMoore@littlerock.gov>
Subject: [External Email] Plat Approval - Lots 1 & 2 Maranatha Addition
Daniel Havner
From: Collins, Jesse <Jesse_Collins@comcast.com>
Sent: Tuesday, October 27, 2020 2:39 PM
To: Tamara Guffey; Vincent Hotho; Jason Lowder; Henderson, Jeremy; Bates, Joni B.;
[CENHRT-South Little Rock Construction]; Joseph Manion Om4138@att.com)
Cc: Daniel Havner; vharper@littlerock.gov; Floriani, Vince; Moore, Monte
Subject: RE: Plat Approval - Lots 1 & 2 Maranatha Addition
Approved
Jesse R Collins
Comcast
Construction Supervisor
2714 S. Shackleford Rd.
Little Rock,AR. 72205
Office 901-623-7639
Cell 501-353-8448
From: Tamara Guffey <tguffey@whitedaters.com>
Sent: Tuesday, October 27, 2020 2:26 PM
To: Vincent Hotho <Steven.Hotho@Irwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Henderson, Jeremy
<jhende9@entergy.com>; Bates, Joni B. <joni.bates@centerpointenergy.com>; [CENHRT-South Little Rock Construction]
<CENHRT-South_ Little _ Rock_ Construction@comcast.com>; Joseph Manion (jm4138@att.com) <jm4138@att.com>
Cc: Daniel Havner <dhavner@whitedaters.com>; vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>;
Moore, Monte <MMoore@Iittlerock.gov>
Subject: [EXTERNAL] Plat Approval - Lots 1 & 2 Maranatha Addition
Attached for review and approval is the plat of Lots 1 and 2, Maranatha Addition, an addition to the City of Little
Rock. The purpose of this plat is to divide the property into two tracts.
May we get an email response with your comments before Friday, November 6, 2020, the approximate filing date.
Please contact Dan Haver dhavner@whitedaters.c_om with any questions.
Thank you for your assistance.
Tamara Guffey
Office Manager
White-Daters & Associates, Inc.
24 Rahling Circle
Little Rock, AR 72223
P: (501) 821-1667
F: (501) 821-1668
Daniel Havner
From: Henderson, Jeremy <jhende9@entergy.com>
Sent: Tuesday, October 27, 2020 2:41 PM
To: Tamara Guffey
Subject: RE: Plat Approval - Lots 1 & 2 Maranatha Addition
Entergy approves.
From: Tamara Guffey <tguffey@whitedaters.com>
Sent: Tuesday, October 27, 2020 2:26 PM
To: Vincent Hotho <Steven.Hotho@Irwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Henderson, Jeremy
<jhende9@entergy.com>; Bates, Joni B. <joni.bates@centerpointenergy.com>; cenhrt-
south_ little _ rock_ construction@comcast.com; Joseph Manion (jm4138@att.com) <jm4138@att.com>
Cc: Daniel Havner <dhavner@whitedaters.com>; vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>;
Moore, Monte <MMoore@littlerock.gov>
Subject: Plat Approval - Lots 1 & 2 Maranatha Addition
EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is
unknown, or the message seems suspicious in any way. DO NOT provide your
user ID or password.
Attached for review and approval is the plat of Lots 1 and 2, Maranatha Addition, an addition to the City of Little
Rock. The purpose of this plat is to divide the property into two tracts.
May we get an email response with your comments before Friday, November 6, 2020, the approximate filing date.
Please contact Dan Haver dliavner@wlitedaters.com with any questions.
Thank you for your assistance.
Tamara Guffey
Office Manager
White-Daters & Associates, Inc
24 Rahling Circle
Little Rock, AR 72223
P: (501) 821-1667
F: (501) 821-1668
This message is intended for the exclusive use of the intended addressee. If you have received this message in error or
are not the intended addressee or his or her authorized agent, please notify me immediately by e-mail, discard any
paper copies and delete all electronic files of this message.
Prepared by:
Russell Milam
P.O. Box 242916
Little Rock, AR 72223
Owner: Steven Lynn Lahodny Trust)
To: The Public )
)
II�IIIIIIIII�IIIIIIII IIIII III I IIIII 2020077708
PRESENTED: 11-19-2020 12:14.37 PM RECORDED: 11-19-2020 12:18:35 PM
In Official Records of Terri Hollingsworth Circuit/County Clerk
PULASKI CO, AR FEE $20.00
BILL OF ASSURANCE
tni�ife0�.
Whereas, Steven Lynn Lahodny Trust, is the sole owner of the following described property
PART OF THE SW1/4 SEIA OF SECTION 30, T-2-N, R-14-W, PULASKI COUNTY,
ARKANSAS, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING
AT THE SOUTHEAST CORNER OF THE SAID SW1/4 SE1/4; THENCE N87°40'53"W, A
DISTANCE OF 428.36 FEET; THENCE NO3°06'03"E, A DISTANCE OF 239.16 FEET;
THENCE N87056'39"W, A DISTANCE OF 364.43 FEET; THENCE NO3°12'18"E, A
DISTANCE OF 89.72 FEET; THENCE N87°54'43"W, A DISTANCE OF 262.03 FEET;
THENCE N03009'58"E, A DISTANCE OF 330.34 FEET; THENCE S87°41'53"E, A
DISTANCE OF 1038.93 FEET; THENCE S01045'52"W, A DISTANCE OF 656.76 FEET TO
THE POINT OF BEGINNING, an addition to Pulaski County, Arkansas.
NOW, THEREFORE, WITNESSETH:
That I, the said owner, hereinafter termed grantor has caused said tract of land to be surveyed by
White-Daters & Associates., Registered Professional Engineer/Land Surveyor, and a plat thereof made
which is identified by the title Final Plat of Lot 1 & 2 Maranatha Addition, an Addition to Pulaski
County, Arkansas, and the date November 2020 and by the signature of the said engineer/surveyor and
the said grantor and bears a Certificate of Approval executed by the Little Rock Planning Commission,
and is on record in the Office of the Circuit Clerk and ex-officio Recorder of Pulaski County, Arkansas,
as Instrument No.
and the grantor does hereby make this Bill of Assurance.
The grantor does hereby certify that they have platted said real estate in accordance with said plat.
The lands embraced in said plat shall be forever known as designed on said plat; and every deed of
conveyance for said property shall use this designation.
1
The filing of the Bill of Assurance and plat for record in the office of the Circuit Clerk and Ex-
officio Recorder of Pulaski County shall be a valid and complete delivery and dedication of the streets
and easements shown on the said plat.
The purpose of this instrument is to form two lots.
WITNESS, our hands this day of 20 � 0
l
Owner: teven Lynn Lahodny, Trus of the
Steven Lahodny Trust dated December 28, 2011
STATE OF ARKANSAS
COUNTY OF Lk- 10,
BE IT REMEMBERED that on this day came before me a Notary Public within and for the
County and State aforesaid, the undersigned Steven Lynn Lahodny stated that he/she had
executed the foregoing Bill of Assurance.
�g r
Not ublic
My Commission Ex ires: A ie�Eo.,..,.,
a
a
9
ARKANSAS
JY
Revlewd only for inclusion of minimum standards
mqulred by ft City of tide Rock cubdI -01ion ragulat om.
13ill of Assurance i ' '€r' . t, :. " ; l %t the
developer MY of:the
We Rods subdivision and zoning ordinances.
i -�o
City ot LMe Rock Pfarrfft6a Conirn,ssion
0
City of Little Rock
Planning and Development
Filing Fees
Date; =ti p
Annexation
Board of Adjustment
Cond Use Permit/ T UP
Final Plat
Planned Unit Dev
Preliminary Plat
Special Use Permit
Rezoning
Site Plans
Street Name Change
Street Name Signs
Number at ea
Public Hearing Signs
Number at ea
Total
File No
Location
Applicant,
By
$
$
$
$ �L rz>
CITY OFLITTLE TLE ROCK
BUILDING CODE
$
4* /��