Loading...
HomeMy WebLinkAboutS-1844-B ApplicationCity of Little Rock Planning and Development J C . PA.ID Filing Fees CITY DF LITTLE RQC�( Date 20� BJILDNG RODE Annexation $ Board of Adjustment $ Cond Use Permit/ T U P $ Final Plat $ tk Planned Unit Dev $ Preliminary Plat $ Special Use Permit $ Rezoning $ Site Plans $ Street Name Change $ Street Name Signs Number at ea $ Public Hearing Signs Number at ea $ Total $ File No Locationt•t� Applicant By 1111111111111112111111111111111111111 2021062749 PRESENTED: 09-03-2021 12:33:22 PM RECORDED: 09-03-2021 12:53:08 PM In Official Records of Terri Hollingsworth Circuit/County Clerk This Instrument Prepared By: AkEILBOTT LAIC ])ON A. EILBOTT • ATTORNEY, PLC PostOffice ce Box 23870 . Made Rock AR 72221-3870 Telephone 501,2252885 . ellbot law.com PULASKI CO, AR FEE $30.00 Recording Information: q1.6/m ORC I? go 1Q�a2 l (0rrrrf eafrr�I� BILL OF ASSURANCE COVrNANTS AND RESTRICTIONS OF COPPER RUN PHASE III SUBDIVISION AN ADDITION TO THE CITY OF LITTLE ROCK, ARKANSAS This Bill of Assurance of Copper Run, Phase III Subdivision, an Addition to the s .--e, City of Little Rock, Arkansas is executed this r day of , 2021, and is made by Layman Lane LLC, an Arkansas Limited Liability Company, by Graham Smith, its authorized member, duly authorized by appropriate resolution of the members of Layman Lane LLC, hereinafter referred to as "Developer": Developer caused to be filed in the Office of the Circuit Clerk and Ex-Officio Recorder of Pulaski County, Arkansas, a certain Bill of Assurance Covenants and Restrictions Copper Run, Phase II, an Addition to the City of Little Rock, Arkansas, as Instrument No. 2020046639 on July 24, 2020, same is hereafter referred to as Phase II Bill of Assurance and; 2. Developer hereby dedicates and declares the property described in Exhibit A attached hereto and made a part hereof and incorporated herein as though specifically set forth word for word, shall be held, transferred, sold, conveyed and occupied subject to the covenants, restrictions, easements and charges as set forth in the Original Bill of Assurance, Covenants and Restrictions, Copper Run, Phase II, an Addition to the City of Little Rock, Arkansas, Instrument No. 2020046639 on July 24, 2020, and same are hereby incorporated herein as though set forth word for word. 3. Developer has caused to be made a plat hereinafter referred to as "the "Plat", filed herewith in the Plat Record Book as Instrument No. prepared by Joe White & Associates, Inc. and by Joe D. White, Jr., Registered Professional Engineer, No. 7094, and showing a survey by Daniel W. Havner, Registered Land Surveyor, No. 1542, dated the 2 day of 2021, and bearing a Certificate of Approval executed by the Planning Commission of the City of Little Rock, Arkansas, and showing the boundaries and dimensions of the property now being subdivided into lots, tracts and streets. 4. Developer, to the extent required, hereby donates, and dedicates to the public an easement of way on, over and under the streets and rights of way on the Plat to be used and utilized as public streets. In addition to the streets that are shown on the Plat, certain easements for drainage and/or utilities which Developer hereby donates and dedicates to and for the use of public utilities, without limiting the generality of the foregoing electric power, gas, telephone, water, sewer and cable television with a right hereby granted to the persons, firms and corporations engaged in supplying the utilities to use and occupy the easements and to have ingress and egress therefrom for the installation, maintenance, repair and replacement of the utility services. 2 5. The filing of this Bill of Assurance and Plat for record in the office of the Circuit Clerk and Ex-Officio Recorder of Pulaski County, Arkansas, shall be a valid and complete delivery and dedication of the streets and easements subject to the limitations herein set out. 6. The lands and property embraced in the Plat shall be forever known as: COPPER RUN, PHASE III SUBDIVISION, AN ADDITION TO THE CITY OF LITTLE ROCK, ARKANSAS Lots 25-30 Block 1 Lots 68-74 Block 2 Lot 1 and Lots 14-26, Block 4 and any and every deed of conveyance of any lot so described shall be deemed to contain a sufficient description thereof. 7. Tracts I and J as set forth on said Plat may be utilized for drainage, pedestrian paths, trails, and landscaping with approval of Layman Lane LLC. City of Little Rock Municipal Property Owner's Multipurpose Improvement District No. 2018-327 (Copper Run Recreation) shall be responsible for the upkeep, maintenance and all expenses associated with Tracts I and J. EXECUTED the date first mentioned above. LA BY k. kbBERT GRAeHAm SMITH, AUTHORIZED MEMBER 3 ACKNOWLEDGMENT STATE OF ARKANSAS COUNTY OF PULASKI Be it remembered that on this day of JL� �_2021, before me, a notary public within and for the county and state aforesaid, duly qualified and acting, appeared ROBERT GRAHAM SMITH, to me well known, who stated he was a Member of LAYMAN LANE, LLC, an Arkansas Limited Liability Company, and was duly authorized in that capacity to execute the foregoing for and on behalf of the Limited Liability Company, and stated he had executed and delivered the foregoing for the considerations and purposes therein mentioned and set forth. WITNESS my hand and seal this,? day of JU'it 2021. Notary ublic My Commission Expires; NKK _uBoc#12_ 373543 led r� ■oq AjR�51���D�f QZ it9swWW only for kr cWslon at minhum standards .requhWby to City of We Rock sjbdivGion regulatiora. BSI of Assurancs provisions established by W dnraiopar may,exosed rninhur-: regulations of the Li&subdwision aw zaning ordiriartces. WXY, L,= 9 3 ".'--T"C11ftV4*PANik cornmissim M Tamara Gu From: Floriani, Vince <VFloriani@littlerock.gov> Sent: Thursday, September 2, 2021 10:18 AM To: Tamara Guffey; S. Vince Hotho Cc: Brian Dale Subject: RE: Preliminary Plat copper Run, Phase III Tamara, Civil Engineering is good with approval of the final plat. When will I get the maintenance bond? Vince Floriani, P.E. Design Review Engineer Little Rock Public Works -Civil Engineering 723 W. Markham St. Little Rock, AR 72201 501-371-4817 vfloriani@littlerock.gov From: Tamara Gulley <tguffey@joewhiteassociates.com> Sent: Thursday, September 2, 20219:32 AM To: S. Vince Hotho <steven.hotho@lrwra.com>; Floriani, Vince <VFloriani@littlerock.gov> Cc: Brian Dale <bdale@joewhiteassociates.com> Subject: FW: Preliminary Plat copper Run, Phase III Importance: High CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning Vince Hotho and Vince Floriani) We are recording this plat today on Copper Run Phase III. I believe you both have everything you need now for the plat approval. May I get an approval emailed back to take to the City today? Thank you for your assistance. Tamara Guffey Office Manager JOE WHITE & ASSOCIATES, INC. 101, 0 OVIL ENCINFERING - C0\S1LgMNG SUVIM - LAND SURVEMG Joe White & Associates, Inc. 25 Rahling Circle, Suite A-2 Little Rock, AR 72223 Office: (501) 214-9141 Website: www.ioewhiteassociates.com 1 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: COPPER RUN PHASE III I have made a final inspection of the improvements and find that: Ali improvements shown on constriction drawings for the development are constructed and in conformance witb City requirementststandards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: _ ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: _ All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. X 2 street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a pinch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. ��4z alAziell Traffic Engineer Date:__. 9-2-2021 CIVIL ENGLNEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. _ Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for Final plat approval have been satisfied. Civil Engineer I/II Date: SURVEYOR REPORT I have reviewed the plat and find that: All requirements for final plat approval have been satisfied. z,q9 4�& Surveyor Date: MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. tlz;� Date: 9-2-2021 Design Review Engineer/Civil Engineering Manager Effective: July 21, 2021 Tamara Guffe From: Vincent Hotho <Steven.Hotho@lrwra.com> Sent: Thursday, September 2, 2021 1:03 PM To: Tamara Guffey; Floriani, Vince Cc: Brian Dale Subject: RE: Preliminary Plat copper Run, Phase III LRWRA has no objection to this plat. S. Vincent Hotho, P.E. Engineering Manager 11 Clearwater Dr. Little Rock, AR 72204 Office: (501)688-1452 +A&vvv Irwra rom LITTLE ROCK Water Reclamation ONE �.ri-= Authority f=_ ONE This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information, and is intended only for the individual named. From: Tamara Guffey <tguffey@joewhiteassociates.com> Sent: Thursday, September 2, 2021 9:32 AM To: Vincent Hotho <Steven.Hotho @Irwra.com>; Floriani, Vince <VFloriani@littlerock.gov> Cc: Brian Dale <bdale@joewhiteassociates.com> Subject: FW: Preliminary Plat copper Run, Phase III Importance: High Good morning Vince Hotho and Vince Floriani! We are recording this plat today on Copper Run Phase III. 1 believe you both have everything you need now for the plat approval. May I get an approval emailed back to take to the City today? Thank you for your assistance. Tamara Guffey Office Manager JOE WHITE S ASSOCIATES INC. C I% IL ENGINEERING - CONSULTING SER►'ICES - LAND SL RVEYING Joe White & Associates, Inc. 25 Rahling Circle, Suite A-2 Tamara Guffe From: MANION, JOSEPH E <jm4138@att.com> Sent: Monday, July 12, 2021 8:14 AM To: Tamara Gulley Subject: RE: Preliminary Plat copper Run, Phase III AT&T APPROVES Joseph Mavtiovt AT&T OSP ENGR. 501-416-5541 From: Tamara Gulley <tguffey@joewhiteassociates.com> Sent: Friday, July 9, 2021 3:42 PM To: S. Vince Hotho <Steven.Hotho@Irwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Joni Bates (joni.bates@centerpointenergy.com) <joni.bates@centerpointenergy.com>; MANION, JOSEPH E <jm4138@att.com>; CENHRT-South_Little-Rock Construction@comcast.com; Henderson, Jeremy <jhende9@entergy.com> Cc: vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>; Dan Havner <dhavner@joewhiteassociates.com>; Brian Dale <bdale@joewhiteassociates.com> Subject: Preliminary Plat copper Run, Phase III THIS IS A REPLAT REVIEW APPROVAL REQUEST FROM JOE WHITE & ASSOCIATES, INC. Attached is the Plat of Lots 25-30, Block 1, Lots 68-74, Block 2, Lots 1, 14-26, Block 4, Tracts I & J, Copper Run, Phase III, an addition to the City of Little Rock. We would like to file this replat by Friday, July 23, 2021. Could you please review the attached plat and email back your comments by July 23rd? Any questions may be directed to Brian Dale, PE at bdale@'oewhiteassociates.com 'oewhiteassociates.com or call (501) 214-9141. Thank you for your assistance. Tamara GufFey Office Manager JOE WHITE & ASSOCIATES, INC. . � I711 t;Vc:l`liftilVG • [��titik1 iLy�..,t R►7C i.�.t.��iitil7t�I►'[W 25 Rahling Circle, Suite A-2 Little Rock, AR 72223 Office: (501) 214-9141 Direct: (501) 340-0721 Website: www.ioewhiteassociates.com Tamara Guffey From: Andrew Pownall <Andrew.Pownall@carkw.com> Sent: Wednesday, July 21, 2021 2:02 PM To: Brian Dale Cc: Tamara Guffey Subject: RE: [External] RE: [External] FW: Preliminary Plat copper Run, Phase III Attachments: COPPER RUN PHASE III FINAL PLAT 7-21-21.pdf Thank you. The attached plat is approved. Andrew Pownall Senior Engineer Central Arkansas Water 501-377-1342 (Office) 501-218-6898 (Cell) From: Brian Dale <bdale@joewhiteassociates.com> Sent: Wednesday, July 21, 2021 1:57 PM To: Andrew Pownall <Andrew.Pownall@carkw.com> Cc: Tamara Guffey <tguffey@joewhiteassociates.com> Subject: [External] RE: [External] FW: Preliminary Plat copper Run, Phase III [CAUTIONJ This email originated from outside of the CAW. Do not click links or open attachments unless you recognize the sender and know the content is safe. Attached as requested. thx Brian R. Dale President JOE WHITE & ASSOCIATES2INC. . C1 1L E\GINEERJXG-CONS[ILTI\G SERVICES - LAID SURVEYING 25 Rahling Circle, Suite A-2 Little Rock, AR 72223 Office: (501) 214-9141 Website: www.ioewhiteassociates.com From: Andrew Pownall <Andrew.Pownall@carkw.com> Sent: Wednesday, July 21, 2021 11:15 AM To: Tamara Guffey <t uffe oewhiteassociates.com> Cc: Brian Dale <bdale ioewhiteassociates.com> Subject: RE: [External] FW: Preliminary Plat copper Run, Phase III Tamara Guffey From: Gober, Adam P <adam.gober@centerpointenergy.com> Sent: Wednesday, July 21, 2021 12:36 PM To: Tamara Guffey Cc: Bates, Joni B Subject: FW: [External Email] FW: Preliminary Plat copper Run, Phase III Attachments: COPPER RUN, PHASE III PRELIMINARY PLAT 7-6-21.pdf Tamara, CenterPoint approves the attached preliminary plat. Thanks, sBWO Adam P. Gober Engineer I AR/OK Region 501.377.4737 w. 1501.541.7509 c. CenterPointEnergy.com 0000 From: Bates, Joni B <joni.bates@centerpointenergy.com> Sent: Wednesday, July 21, 2021 11:36 AM To: Gober, Adam P <adam.gober@centerpointenergy.com> Subject: FW: [External Email] FW: Preliminary Plat copper Run, Phase III Adam This plat needs to be reviewed please. Thank you, Joni From: Tamara Gulley <t uffe joewhiteassociates.com> Sent: Wednesday, July 21, 2021 10:58 AM To: S. Vince Hotho <steven.hotho@Irwra.com>; Andrew. Pownall@carkw.com; Bates, Joni B <Io n i . bates @ce me rgoi me nergy.co m > Cc: Brian Dale <bdale moewhiteassociates.com> Subject: [External Email] FW: Preliminary Plat copper Run, Phase III EXTERNAL EMAIL CAUTION: This message originated from outside CenterPoint Energy. Do not click on links, open attachments, or enter data unless you recognize the sender, were expecting the content and know it to be safe. Tamara Guffe From: Border, Michael <Michael_Border@comcast.com> Sent: Friday, July 9, 2021 4:45 PM To: Tamara Guffey; S. Vince Hotho; Jason Lowder; Joni Bates (Joni.bates@centerpointenergy.com); jm4138@att.com; [CENHRT-South Little Rock Construction]; Henderson, Jeremy Cc: vharper@littlerock.gov; Floriani, Vince; Dan Havner; Brian Dale Subject: RE: Preliminary Plat copper Run, Phase III Approved by Comcast Thanks Mike Border Construction Specialist 2 2714 S. Shackleford Little Rock AR 72205 501-993-6529 From: Tamara Gulley <tguffey@joewhiteassociates.com> Sent: Friday, July 9, 2021 3:42 PM To: S. Vince Hotho <Steven.Hotho @Irwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Joni Bates (joni.bates@centerpointenergy.com) <joni.bates@centerpointenergy.com>; jm4138@att.com; [CENHRT-South Little Rock Construction] <CENHRT-South_Little_Rock_Construction@comcast.com>; Henderson, Jeremy <jhende9@entergy.com> Cc: vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>; Dan Havner <dhavner@joewhiteassociates.com>; Brian Dale <bdale@joewhiteassociates.com> Subject: [EXTERNAL] Preliminary Plat copper Run, Phase III THIS IS A REPLAT REVIEW APPROVAL REQUEST FROM JOE WHITE & ASSOCIATES, INC. Attached is the Plat of Lots 25-30, Block 1, Lots 68-74, Block 2, Lots 1, 14-26, Block 4, Tracts I & J, Copper Run, Phase III, an addition to the City of Little Rock. We would like to file this replat by Friday, July 23, 2021. Could you please review the attached plat and email back your comments by July 23rd? Any questions may be directed to Brian Dale, PE at bdale@ioewhiteassociates.com ioewhiteassociates.com or call (501) 214-9141. Thank you for your assistance. Tamara Guffey Office Manager JOE WHITE & AMCIATES. INC. ��['11k1.[\�C:ltii'�Str.�Y.:-tx]L"�'1y.1frRC".SFR�'IC.'l-ti-1 �1[lsl.11t1'{'1'>itii: 25 Rahling Circle, Suite A-2 Little Rock, AR 72223 Tamara Guffe From: Henderson, Jeremy <jhende9@entergy.com> Sent: Wednesday, July 14, 2021 7:17 AM To: Tamara Guffey Subject: RE: Preliminary Plat copper Run, Phase III Entergy approves. From: Tamara Guffey <tguffey@joewhiteassociates.com> Sent: Friday, July 09, 2021 3:42 PM To: S. Vince Hotho <Steven.Hotho@Irwra.com>; Jason Lowder <Jason.Lowder@carkw.com>; Joni Bates (joni.bates@centerpointenergy.com) <joni.bates@centerpointenergy.com>; jm4138@att.com; CENHRT- South_Little _Rock_Construction@comcast.com; Henderson, Jeremy <jhende9@entergy.com> Cc: vharper@littlerock.gov; Floriani, Vince <VFloriani@littlerock.gov>; Dan Havner <dhavner@joewhiteassociates.com>; Brian Dale <bdaie@joewhiteassociates.com> Subject: Preliminary Plat copper Run, Phase III EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way. DO NOT provide your user ID or password. THIS IS A REPLAT REVIEW APPROVAL REQUEST FROM JOE WHITE & ASSOCIATES, INC. Attached is the Plat of Lots 25-30, Block 1, Lots 68-74, Block 2, Lots 1, 14-26, Block 4, Tracts I & J, Copper Run, Phase III, an addition to the City of Little Rock. We would like to file this replat by Friday, July 23, 2021. Could you please review the attached plat and email back your comments by July 23rd? Any questions may be directed to Brian Dale, PE at bdale@ioewhiteassociates.com or call (501) 214-9141. Thank you for your assistance. Tamara Guffey Office Manager JOE WHITE & ASSOCIATES, INC. 25 Rahling Circle, Suite A-2 Little Rock, AR 72223 Office: (501) 214-9141 Direct: (501) 340-0721 Website: www.iaewhiteassociates.com