HomeMy WebLinkAboutS-1779 Application20
z �
K
= �
�
p
CatC
N
=rQ
�Q+ y
G
co
w
b
b
b
5.
o
o
��
�.
co
to--
f°
�•
o
'
M
I
�
a' �
c
an
to
a
y5
6N d!
1044
ISLAMIC CENTER FOR HUMAN EXCELLENCE INC
BUILDING FUND
PH. 501-372-1942
1717 WRIGHT AVE
LITTLE ROCK, AR 72202 DATE ---
PAY TO THE
ORD OF
r
�� �.. r �•- � G �� DOLLARS
0 Sank Dmeffow FM
FOR [� .w;i,; ,' 7• i
000 10440 1:08 2907 2731: 28040 21368e
City of Little Rock
Planning and Development
Filing Fees
Date $ , 201;�__
Annexation
$
Board of Adjustment
$
Cond Use Permit/ T UP
$
Final Plat
$
Planned Unit Dev
$
Preliminaiy Plat
Special Use Permit
$
$_
Rezoning
Site Plans
a �'
Sti eet Name Change
, 7--
Street Name Signs:
Number at ea
$
Public Hearing signs
Number at ea
$
Total
ry
$ /
File No
Lo+
Ap
By
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: BELLA ROSA PLACE
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date:
ADLESSING SPECIALIST REPORT
I have review the plat and find hat the street names and street configuration are acceptable.
Addressing Specialist Date:
"TRAFFIC ENGINEER REPOR
I have reviewed the plat and find that:
_ All streetlight installation, striping, signage and other traffic improvem( .ts have been constructed and are in
conformance with City requirements/standards,
�L street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
�rY~ Traffic Engineer Date:_ )'3 J
CIVIL ENGINEER REPOR"I.
I have reviewed the file for this matter and find that:
"fhe maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
All other requirements for final plat approval have been satisfied.
Civil Engineer 1/11 Date: � )2J 1
SURVEYOR REPORT
I have reviewed the plat and find that:
_ All requirements for final plat approval have been satisfied.
Surveyor Date: c�r r• �t�
MANAGE / PPROVAL
All Civil Engineering requirements for tiling this final plat have bc^en satisFied.
Dater)
Design Review Engineer.Civil Engineering Manager
Hflcctivc:.lul�- 29. 201 G
- � .�aa.wn e" nitusi' � oror vo �u'ar i
nr.an ...ra owwl>>e.vxzhw�eti i/���.�� aeiaeu�:m io
FINAL PLAT OF BELLA ROSA PLACE
SUBDIVISION TO THE CITY OF r°`_u....�,,..�....w....,..._.°.^.�._
LITTLE ROCK, PULASKI COUNTY, ARKANSAS
ON
NORTH
o 5
FP
From: Jonathan Long <Jonathan.Long @carkw.com>cf
Subject: RE: 15-190 Bella Rosa - Preliminary Final Plat
Date: July 28, 2016 3:49:24 PM CDT
To: DCI Projects <dciprojects@dci-Ir.com>
1 Attachment, 13 KB
This meets CAWs requirements.
From: DCI Projects [mailto:dciprojects@dci-Ir.com]
Sent: Wednesday, July 27, 2016 1:36 PM
To: Jonathan Long
Subject: Fwd: 15-190 Bella Rosa - Preliminary Final Plat
Jonathan,
Have you had a chance to look at this? CAWs sign off is the last one needed to complete
this.
Thanks,
Andrew
Begin forwarded message:
From: Andrew Fuller <andrewf@dci-Ir.com>
Subject: 15-190 Bella Rosa - Preliminary Final Plat
Date: July 7, 2016 8:45:35 AM CDT
To: Jonathan Long <Jonathan.long @carkw.com>, Joni Bates
<Toni.bates@centerpointenerpu.com>, Jeremy Henderson
<ihende9@enter com>, Vincent Hotho <Steven.Hotho@lrwu.com>
Cc: Roy Andrews <r=a@dci-Ir.com>
W
Attached is the draft version of the Final Plat for the Bella Rosa Subdivision that we have
submitted to the City. We will need you to sign off on this so that the CLR will approve the
Final Plat
Thanks,
Andrew
Andrew Fuller, P.E.
Development Consultants Inc.
2200 North Rodney Parham Road, Suite 220
Little Rock, Arkansas 72212
Office: 501.221.7880
From: Vincent Hotho <Steven.Hotho @Irwu.com>(y'
Subject: 21602 - Bella Rosa Place
Date: July 21, 2016 1:01:39 PM CDT
To: Andrew Fuller <andrewf@dci-Ir.com>
Cc: Vern Stubbs <Vern.Stubbs@Irwu.com>, Allen Gatlin <alien,gatlin@Irwu.com>, Jacquie Roberts
<jacquie. roberts@lrwu.com>
1 Attachment, 46 KB
Andrew,
Please find attached the Final Acceptance Letter for the referenced project.
Thank you,
S. Vincent Hotho, P.E.
Program Supervisor
Little Rock Wastewater Utility
Ofc: 501.688.1452
M bI: 501.442,6042
Little Fleck
CA AO Was tcwa t cr
July 21, 2016
Mr. Andrew Fuller, P.E.
Development Consultants Incorporated
2200 [North Rodney Parham Road
Little Rock, AR 72212
RE: Bella Rosa Place
127-2-1602
Dear Mr, Fuller:
The sanitary sewer gravity mains constructed, as represented by your "As Constructed"
drawings, to provide sewer service to the above referenced project, are hereby
accepted. The Utility shall begin operation and maintenance effective immediately,
except that all defects in material and workmanship must be remedied by the
Developer or his Contractor, if reported to the Developer or his Contractor (or his
Engineer), within one (1) year of the date of the Maintenance Bond.
ESTIMATED COST MATERIAL Manholes
$33,305.00 523 LF 8" DI Sewer Main 5 Pre -Cast
If you have any questions or comments, please call.
Sincerely,
LIT—PIOCKWASAr ATER
.E.
Devoled Engineer/Program Supervisor
Office 501-688-1452
Cell 501- 352-0390
Email Y..Wt;L-.l}tt�l r a�ir,vll cyn
cc GIS
11 Clearwater Drive I Ldde RocK AR 72204 1 501-376-2903 1 www.lrwu.=n
From: "Fuentes, Kenneth W" <kenneth.fuentes9centerpointenergy.com>B
Subject: RE: 15-190 Bella Rosa - Preliminary Final Plat
Date: July 7, 2016 4:36:57 PM CDT
To: "andrewfQdci-Ir.com" <andrewf@dci-Ir.com>
Cc: "Bates, Joni B."<joni.bates@centerpointenergy.com>
5 Attachments, 457 KB
Andrew,
I see no conflict with our facilities and the submitted preliminary final plat for Bella Rosa.
Thanks,
Kenneth W. Fuentes
Engineer I
Southern Gas Operations I Arkansas/Oklahoma Region
401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201
Office:501-377-4606 1 Fax:501-377-4733 1 Mobile:501-516-9585
kenneth fuentes centeroointenerav con
CGenlenParnt
Energy
From: Bates, Joni B.
Sent: Thursday, July 07, 2016 9:42 AM
To: Fuentes, Kenneth W
Subject: FW: 15-190 Bella Rosa - Preliminary Final Plat
Kenneth:
Can you please assist Andrew with this request.
Thanks, Joni
Joni Bates
Marketing Coordinator
CenterPoint Energy
501-377-4558
CErrterPoint
From: Andrew Fuller [niaJto:andrmNf@idci-Er.com]
Sent: Thursday, July 07, 2016 8:46 AM
To: Jonathan Long; Bates, Joni B.; Jeremy Henderson; Vincent Hotho
Cc: Roy Andrews
Subject: 15-190 Bella Rosa - Preliminary Final Plat
All,
Attached is the draft version of the Final Plat for the Bella Rosa Subdivision that we have
submitted to the City. We will need you to sign off on this so that the CLR will approve the
Final Plat
Thanks,
Andrew
Andrew Fuller, P.E.
Development Consultants Inc.
2200 North Rodney Parham Road, Suite 220
Little Rock, Arkansas 72212
Office: 501.221.7880
E7
.,.� �_ ti.1'.,:,..�,"t4 � � tea-= - � .• "- - -m.
6.� C�- � —• '- r�ry•R Y J dl � �{ _mow � �'r� r
.5 Y
FINAL PLAT OF ROPLACE
TOT
SUBDIVISION TO THE CITY OF
LITTLE ROCK, PULASKI COUNTY, ARKANSAS
' 1 I
NORTH • "
FP
From: "Charles, Nathan" <ncharles@littlerock.org>
Subject: RE: 15-190 Bella Rosa Place Subdivision - Storm Drain As -Built
Date: July 12, 2016 11:04:37 AM CDT
To: 'Andrew Fuller' <andrewf@dci-Ir.com>
Cc: "Floriani, Vince" <VFloriani@littlerock.org>
Looks good.
Thanks
From: Andrew Fuller [mailto:andrewf@dci-Ir.com]
Sent: Tuesday, July 12, 2016 10:49 AM
To: Charles, Nathan
Subject: Re: 15-190 Bella Rosa Place Subdivision - Storm Drain As -Built
Try this one. I added the lines over the leaders.
Thanks,
Andrew
On Jul 12, 2016, at 10:36 AM, Charles, Nathan wrote:
Andrew,
It is not clear what exactly on the plans the notes are describing. Please revise drawing with
arrows pointing to what the notes are describing.
Thanks
Nathan
From: Andrew Fuller fmailto:andrewFCwdc[-Ir.corrn]
Sent: Monday, July 11, 2016 10:01 AM
To: Charles, Nathan; Floriani, Vince
Cc: Roy Andrews
Subject: 15-190 Bella Rosa Place Subdivision - Storm Drain As -Built
Gentlemen,
Attached is the Storm Drain As -Built for the Bella Rosa Place Subdivision for your use.
Please let me know if you have any questions or comments.
Thanks,
Andrew
Andrew Fuller, P.E.
<image001.jpg>
Development Consultants Inc.
2200 North Rodney Parham Road, Suite 220
Little Rock, Arkansas 72212
Office: 501.221.7880
From: "Henderson, Jeremy" <jhende9@entergy.com>(f
Subject: Re: 15-190 Bella Rosa - Preliminary Final Plat
Date: July 7, 2016 8:55:30 AM CDT
To: Andrew Fuller <andrewf@dci-Ir.com>
Approved by Entergy.
On Jul 7, 2016, at 8:45 AM, Andrew Fuller <and rewf0,dci-Ir. com> wrote:
2 Attachments, 27 KB
EXTERNAL SENDER. DO NOT click links if sender is unknown.
DO NOT provide your user ID or password.
►_v
Attached is the draft version of the Final Plat for the Bella Rosa Subdivision that we have submitted to the
City. We will need you to sign off on this so that the CLR will approve the Final Plat
Thanks,
Andrew
Andrew Fuller, P.E.
<DCI LOG01,jpg>
Development Consultants Inc.
2200 North Rodney Parham Road, Suite 220
Little Rock, Arkansas 72212
Office: 501,221,7880
<15-190 FP 2016-07-07,pdf>
James, Donna
From: Andrew Fuller <andrewf@dci-Ir.com>
Sent: Thursday, July 7, 2016 8:46 AM
To: James, Donna; Floriani, Vince; Harper, Vance
Cc: Roy Andrews
Subject: 15-190 Bella Rosa - Preliminary Final Plat
Attachments: 15-190 FP 2016-07-07.pdf
All,
Attached is the draft version of the Final Plat for the Bella Rosa Place Subdivision for your review and
comment.
Please let me know if you have any questions or need any additional information.
Thanks,
Andrew
Andrew Fuller, P.E.
Development Consultants Inc.
2200 North Rodney Parham Road, Suite 220
Little Rock, Arkansas 72212
Office: 501.221.7880
I
� yr
4*1
FINAL PLAT OF BELLA ROSA PLACES
SUBDIVISION TO THE CITY OFgp�.�
LITTLE ROCK, PULASKI COUNTY, ARKANSAS
ro� -,�.r�
R .� .-....�. .. ,..,
FP