HomeMy WebLinkAboutS-1774 Staff AnalysisAugust 11, 2016
IIa►A5,Kl e�-]
NAME: Oak Hill Estates Replat of Lot 8
LOCATION: Located at 525 Zanzibar Street
DEVELOPER:
Scott Kemph
525 Zanzibar Street
Little Rock, AR 72212
SURVEYOR:
Arkansas Surveying and Consulting
Scott Foster
1926 Salem Road
Benton, AR 72019
AREA: 3.00 acres NUMBER OF LOTS: 2
WARD: N/A PLANNING DISTRICT: 18 — Ellis Mountain
CURRENT ZONING
VARIANCE/WAIVERS
R-2, Single-family
None requested.
FILE NO.: S-1774
NEW STREET: 0 LF
CENSUS TRACT: 42.07
The applicant submitted a request dated May 2, 2016, requesting deferral of this item to
the June 30, 2016, public hearing. Staff is supportive of the deferral request.
PLANNING COMMISSION ACTION:
(MAY 19, 2016)
The applicant was present. There were no registered objectors present. Staff
presented the item stating the applicant had submitted a request dated May 2, 2016,
requesting deferral of the item to the June 30, 2016, public hearing. Staff stated they
were supportive of the deferral request. There was no further discussion. The item was
placed on the consent agenda and approved as recommended by staff by a vote of
11 ayes, 0 noes and 0 absent.
August 11, 2016
SUBDIVISION
ITEM N
STAFF UPDATE:
FILE NO.: S-1774
The applicant submitted a request dated June 16, 2016, requesting deferral of this item
to the August 11, 2016, public hearing. Staff is supportive of the deferral request.
PLANNING COMMISSION ACTION: (JUNE 30, 2016)
The applicant was not present. There were no registered objectors present. Staff
presented the item stating the applicant had submitted a request dated June 16, 2016,
requesting deferral of this item to the August 11, 2016, public hearing. Staff stated they
were supportive of the deferral request. There was no further discussion. The item was
placed on the consent agenda and approved as recommended by staff by a vote of
8 ayes, 0 noes and 3 absent.
STAFF UPDATE:
Staff recommends based on the number of previous deferrals withdrawal of this item.
PLANNING COMMISSION ACTION:
(AUGUST 11, 2016)
The applicant was not present. There were no registered objectors present. Staff
presented the item with a recommendation of withdrawal. Staff stated based on the
number of previous deferrals withdrawal of the item was appropriate. There was no
further discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 9 ayes, 0 noes and 2 absent.
0
ITEM NO.; 2. 5-1774
NAME: Oak Hill Estates Replat of Lot 8
LOCATION: located at 525 Zanzibar Street
Planning Staff Comments:
1. Provide notification of the abutting property owners of the development including the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than May 4, 2016. The Office of Planning and
Development must receive the proof of notice no later than May 13, 2016.
2. Provide septic certification for Tract 2 prior to request for final platting of the lots. No
911 address will be provided for Tract 2 until County Planning has received and
approved the septic certification for this lot.
3. Provide a letter from the Volunteer Fire Department concerning the proposed plat
and their ability to serve the new lot(s).
4. Provide a draft bill of assurance for the proposed subdivision.
5. Will the pond be filled to place a new house? If the pond remains it does not appear
the typical zoning setbacks for residential construction can be met.
Variance/Waivers: None requested.
lic Works Conditions:
1. Zanzibar Street is classified on the Master Street Plan as a residential street. A
dedication of right-of-way 25 feet from centerline will be required.
2. Nation Street is classified on the Master Street Plan as a residential street. A
dedication of right-of-way 25 feet from centerline will be required.
3. A 20 foot radial dedication of right-of-way is required at the intersection of Zanzibar
Street and Nation Street.
Utilities and Fire Department/County Planning:
Wastewater: Outside the service boundary. No comment.
Entergy: Entergy does not object to this proposal. A single phase power line exists
along the west side of Zanzibar Street on the west side of the property. There do not
appear to be any conflicts with existing Entergy facilities. Contact Entergy in advance
regarding future service requirements to the development and future facilities locations
as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: No objection. All Central Arkansas Water requirements in
effect at the time of request for water service must be met.
ITEM NO.: 2
S-1774
Fire Department: No comment.
Parks and Recreation: No comment received.
County Planning}
1. Provide bill of assurance for review.
2. Re -title plat and BOA to "Oak Hill Estates Lots 8A and 813".
3. Show source of title.
4. Label all street centerlines.
5. Verify that each lot boundary contains the entire septic field for the respective
residences.
6. Provide CAD file of the plat.
7. Dedicate additional right of way as required to Zanzibar and Nation Streets to
comply with the City of Little Rock Master Street Plan.
8. Pay $10.00 review fee.
Rock Region Metro:
Building Code: The 2012 AR Fire Prevention Code Vol. III for one (1) and two (2) family
dwellings requires foundations meet the following Sections of the Code. If the
foundation cannot be verified by the building official at the time of the footing inspection
the building official may require verification the foundation meets the required elevation
by a licensed engineer.
R403.1.7.3 Foundation elevation. On grade sites, the top of any exterior foundation
shall extend above the elevation of the street gutter at point of discharge or the inlet of
an approved drainage device a minimum of 12-inches (305 mm) plus two (2) percent.
R403.1.7.4 Alternate setback and clearances. Alternate setbacks and clearances are
permitted, subject to the approval of the building official. The building official is permitted
to require an investigation and recommendation of a qualified engineer to demonstrate
that the intent of this Section has been satisfied. Such an investigation shall include
consideration of materials, height of slope, slope gradient, load intensity and erosion
characteristics of slope material.
Please address any questions to the building inspectors at 501.371.4833 or
501.371.4834.
Planning Division: No comment.
Landscape: No comment.
ITEM NO.:
Revised plat/plan'. Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, May 4, 2016.