HomeMy WebLinkAboutS-1766-E ApplicationJames, Donna
From: Vincent Hotho <Steven.Hotho@lrwu.com>
Sent: Friday, September 22, 2017 9:13 AM
To: James, Donna
Cc: Ashley Bice
Subject: FW: Village at the Gateway Phase III Final Plat
Attachments: Phase 3 Final Plat- Revised.pdf
With the sewer easements shown, LRWRA has no further objection to this plat.
Thank you,
Vince
Vince Hotho
Engineering Program Supervisor
11 Clearwater Dr.
Little Rock, AR 72204
Office: (501)688-1452
www.Irwra.com
LITTLE ROCK
r ` Water Reclamation
�ONX WATER
�ONI PuYtJlti.
This email and any files transmitted with it are confidential and intended solely for the
use of the individual or entity to whom they are addressed. If you have received this
email in error, please notify the sender. This message may contain confidential
information, and is intended only for the individual named.
From: Ashley Bice (mailto:ashley@bigrockrrc.com]
Sent: Friday, September 22, 2017 9:08 AM
To: Vincent Hotho <Steven.Hotho @Irwu.com>
Subject: RE: Village at the Gateway Phase III Final Plat
Check this revised plat. I added a 5' sanitary sewer easement in front of the north lots and also a 10' sanitary sewer
easement with 5' on each side of the existing line in Tract F.
Ashley Bice, PE
Civil Engineer
Big Rock Engineering
T: 501.593.1298
A: 12506 Vimv Ridge Rd.Alexander.AR.72002
E: ashley@bigrockrrc.com
From: Vincent Hotho [mailto:Steven.Hotho@Irwu.com]
Sent: Thursday, September 21, 2017 5:36 PM
To: Ashley Bice <ashley@bigrockrrc.com>
Subject: RE: Village at the Gateway Phase III Final Plat
Ashley,
Where's the sewer easements?
Vince Hotho
Engineering Program Supervisor
11 Clearwater Dr.
Little Rock, AR 72204
Office: (501)688-1452
www.Irwra.com
LITTLE ROCK
Water Reclamation
Authority ONNL , liF,A=U4 CJFiilRE.
This email and any files transmitted with it are confidential and intended solely for the
use of the individual or entity to whom they are addressed. If you have received this
email in error, please notify the sender. This message may contain confidential
information, and is intended only for the individual named.
From: Ashley Bice fmailto:ashley_@bigrockrrc.com]
Sent: Monday, September 18, 2017 11:01 AM
To: Vincent Hotho <Steven.Hotho@Irwu.com>
Cc: 'Bob' <bob@bgrockrrc.com>;'Russ Huckaby' <russ@bigrockrrc.com>
Subject: Village at the Gateway Phase III Final Plat
Vince,
Please find the attached PDF of the Final Plat for Phase II, Village at the Gateway, Little Rock, AR, for your review. Let me
know if you have any questions or need additional information.
Ashley Bice, PE
Civil Engineer
Big Rock Engineering
T: 501.593.1298
A: 12506 Vimv Ridge Rd.Alexander,AR,72002
E: ashley@bigrockrrc.com
James, Donna
From: Tamara Guffey <tguffey@whitedaters.com>
Sent: Wednesday, September 20, 2017 2AS PM
To: THOMPSON, THEODIS; Bates, Joni B.; 'MANION, JOSEPH Ejm4138@att.com'; Jason
Lowder (Jason. Lowder@carkw.com); Vincent Hotho Steven.Hotho@lrwu.com;
NEUMEIER, BERNARD
Cc: Joe White; Daniel Havner; James, Donna; Floriani, Vince; Harper, Vance; Brian Dale
Subject: Plat Approval - Parcel B, The Villages of Wellington
Attachments: ParcelBPLAT.PDF
Attached for your approval is a final plat copy of Parcel B, The Villages of Wellington, an
addition to the City of Little Rock. The owner of this property would like to file this plat as
soon as possible.
An email response or signed copy via email will suffice in lieu of a signed paper copy. If you
would like to review and sign off on a paper copy please let me know and we will have one
sent to you without delay. Any questions may be directed to Dan Havner at
dhavner@whitedaters.com or 821-1667 or Joe White at jwhite@whitedaters.com.
Thank you
Tamara Guffey
Office Manager
White-Daters & Associates, Inc.
24 Rahling Circle
Little Rock, AR 72223
P: (501) 821-1667
F: (501) 821-1668
_ a oa; �mWQo e
xa
.who ` _a 0.4 o [/] E.
�''<a Pi<k��7C w U Z x',
w N=�a� W F O y yI
k>✓ �u"<W a c$-
o w W � Fd
-Elrn
E U ¢�0.z w gad
z� a3�� HIS
€7 "E< alW zNa
€�k e
AH �rnz
=mwW$Wa
w gggg w g' . 1a-1 F
caw
inWci ` o'Ei �W=Wk
a�o� �3 wam=aa
o I
J tiY�Cn
JJ JJ 4�,
.rJJ iJ, I�I
r+ 111
rJ
J.r I
/ I
d�
ozd
m
W.
�. � JJ•iii i i i � z7�c
_ a�'w
N J J
9=N
gor
SN
AN
"a5a Y Q 1
� h
Neb9 -0t �1 s
, c �a'>>woe in O,LJNf773Ai �.€o to
rcu� /a�'uy (AI .05)L6.ON S771H N a y`�� g"g
i�Y3op`xV8n&��ffi
}■fin~ is �oLLW u3
tr
�a � =oR
ao PLL P"XM Cp
PCs>�ng38='e�t�i� L�Rid xNk s�� 0�0'z5�=090
t1.o`�`oi;�rItoTx:
TT" w n-d
James, Donna
From:
Sent:
To:
Cc:
Subject:
Attachments:
CAE approves this final plat.
Sent from my iPhone
Begin forwarded message:
Jonathan Long <Jonathan.Long@carkw.com>
Thursday, September 21, 2017 2:42 PM
James, Donna
Ashley Bice
Fwd: Village at the Gateway Phase III Final Plat
Phase 3 Final Plat.pdf, ATT00001.htm
From: "Ashley Bice" <ashley@bigrockrrc.com>
To: "Jonathan Long" <Jonathan.Long@carkw.com>
Cc: Jason Lowder <Jason.Lowder@carkw.com>, Russ Huckaby <russ@biRrockrrc.com>, Bob
<bob bigrockrrc.com>
Subject: Village at the Gateway Phase III Final Plat
Jason/Jonathan,
Please find the attached PDF of the Final Plat for Phase III, Village at the Gateway, Little Rock, AR, for
your review. Let me know if you have any questions or need additional information.
Ashley Bice, PE
Civil Engineer
Big Rock Engineering
T. 501.593.1298
A: 12505 Vimy Ridge Rd Alexander AR 72002
E. ashley@bigrockrrc.com
1
a��O
°
aaF3
'
a
�
�aE
B
`_s
Fs-
I -T=
-
-- -- -
- - - - - - - - - -
s
3 P
s a a
nv [
- - - - - -
- - - --
8 8 9
a
s E x
OVK i
`- -- -
BLD^.I! S =
as °
,a, A
3
D. ROW
a
�I a
zip
3
Ng
3S
S��
�33
ss
gY
sL
- -
- -
1110"
i _
-A
sLDCK 4
�o$ooa�(Dgo
a§o
1=
¢ 5 Q ww
mm c� Is { F�^ ar I Pow
si
a�?
I
r
I
I
� I
W ROW
LM it
t —YNIOGEHOM
9g}�
Yz=
rIt
8'
BLOCK
3
CIVIL ENGINEERING DIVISIOP;
FINAL PLAT FILING APPROVAL;-"'
FINAL PLAT NAME: VILLAGE AT GATEWAY PHASE III
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date:
ADDRESSING SPECIALIST REPORT
I have reviewed the plat and find that the street names and street configuration are acceptable.
E Addressing Specialist Date:
119 1
2� L
NE
TR FFIC ENG ER REPORT
I have reviewed the plat and find that:
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
Traffic Engineer Date:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
_ The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
All other requirements for final plat approval have been satisfied.
Civil Engineer I/II Date: /O%l317
SURVEYOR REPORT
I have reviewed the plat and find that:
7— All requirements for final plat approval have been satisfied. p
Surveyor Date: fr��
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied
r.
'� _ Date: i � J 1 17
Design Review Engineer/Civil Engineering Manager
Effective: Sept 19, 2017