Loading...
HomeMy WebLinkAboutS-1766-E ApplicationJames, Donna From: Vincent Hotho <Steven.Hotho@lrwu.com> Sent: Friday, September 22, 2017 9:13 AM To: James, Donna Cc: Ashley Bice Subject: FW: Village at the Gateway Phase III Final Plat Attachments: Phase 3 Final Plat- Revised.pdf With the sewer easements shown, LRWRA has no further objection to this plat. Thank you, Vince Vince Hotho Engineering Program Supervisor 11 Clearwater Dr. Little Rock, AR 72204 Office: (501)688-1452 www.Irwra.com LITTLE ROCK r ` Water Reclamation �ONX WATER �ONI PuYtJlti. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information, and is intended only for the individual named. From: Ashley Bice (mailto:ashley@bigrockrrc.com] Sent: Friday, September 22, 2017 9:08 AM To: Vincent Hotho <Steven.Hotho @Irwu.com> Subject: RE: Village at the Gateway Phase III Final Plat Check this revised plat. I added a 5' sanitary sewer easement in front of the north lots and also a 10' sanitary sewer easement with 5' on each side of the existing line in Tract F. Ashley Bice, PE Civil Engineer Big Rock Engineering T: 501.593.1298 A: 12506 Vimv Ridge Rd.Alexander.AR.72002 E: ashley@bigrockrrc.com From: Vincent Hotho [mailto:Steven.Hotho@Irwu.com] Sent: Thursday, September 21, 2017 5:36 PM To: Ashley Bice <ashley@bigrockrrc.com> Subject: RE: Village at the Gateway Phase III Final Plat Ashley, Where's the sewer easements? Vince Hotho Engineering Program Supervisor 11 Clearwater Dr. Little Rock, AR 72204 Office: (501)688-1452 www.Irwra.com LITTLE ROCK Water Reclamation Authority ONNL , liF,A=U4 CJFiilRE. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information, and is intended only for the individual named. From: Ashley Bice fmailto:ashley_@bigrockrrc.com] Sent: Monday, September 18, 2017 11:01 AM To: Vincent Hotho <Steven.Hotho@Irwu.com> Cc: 'Bob' <bob@bgrockrrc.com>;'Russ Huckaby' <russ@bigrockrrc.com> Subject: Village at the Gateway Phase III Final Plat Vince, Please find the attached PDF of the Final Plat for Phase II, Village at the Gateway, Little Rock, AR, for your review. Let me know if you have any questions or need additional information. Ashley Bice, PE Civil Engineer Big Rock Engineering T: 501.593.1298 A: 12506 Vimv Ridge Rd.Alexander,AR,72002 E: ashley@bigrockrrc.com James, Donna From: Tamara Guffey <tguffey@whitedaters.com> Sent: Wednesday, September 20, 2017 2AS PM To: THOMPSON, THEODIS; Bates, Joni B.; 'MANION, JOSEPH Ejm4138@att.com'; Jason Lowder (Jason. Lowder@carkw.com); Vincent Hotho Steven.Hotho@lrwu.com; NEUMEIER, BERNARD Cc: Joe White; Daniel Havner; James, Donna; Floriani, Vince; Harper, Vance; Brian Dale Subject: Plat Approval - Parcel B, The Villages of Wellington Attachments: ParcelBPLAT.PDF Attached for your approval is a final plat copy of Parcel B, The Villages of Wellington, an addition to the City of Little Rock. The owner of this property would like to file this plat as soon as possible. An email response or signed copy via email will suffice in lieu of a signed paper copy. If you would like to review and sign off on a paper copy please let me know and we will have one sent to you without delay. Any questions may be directed to Dan Havner at dhavner@whitedaters.com or 821-1667 or Joe White at jwhite@whitedaters.com. Thank you Tamara Guffey Office Manager White-Daters & Associates, Inc. 24 Rahling Circle Little Rock, AR 72223 P: (501) 821-1667 F: (501) 821-1668 _ a oa; �mWQo e xa .who ` _a 0.4 o [/] E. �''<a Pi<k��7C w U Z x', w N=�a� W F O y yI k>✓ �u"<W a c$- o w W � Fd -Elrn E U ¢�0.z w gad z� a3�� HIS €7 "E< alW zNa €�k e AH �rnz =mwW$Wa w gggg w g' . 1a-1 F caw inWci ` o'Ei �W=Wk a�o� �3 wam=aa o I J tiY�Cn JJ JJ 4�, .rJJ iJ, I�I r+ 111 rJ J.r I / I d� ozd m W. �. � JJ•iii i i i � z7�c _ a�'w N J J 9=N gor SN AN "a5a Y Q 1 � h Neb9 -0t �1 s , c �a'>>woe in O,LJNf773Ai �.€o to rcu� /a�'uy (AI .05)L6.ON S771H N a y`�� g"g i�Y3op`xV8n&��ffi }■fin~ is �oLLW u3 tr �a � =oR ao PLL P"XM Cp PCs>�ng38='e�t�i� L�Rid xNk s�� 0�0'z5�=090 t1.o`�`oi;�rItoTx: TT" w n-d James, Donna From: Sent: To: Cc: Subject: Attachments: CAE approves this final plat. Sent from my iPhone Begin forwarded message: Jonathan Long <Jonathan.Long@carkw.com> Thursday, September 21, 2017 2:42 PM James, Donna Ashley Bice Fwd: Village at the Gateway Phase III Final Plat Phase 3 Final Plat.pdf, ATT00001.htm From: "Ashley Bice" <ashley@bigrockrrc.com> To: "Jonathan Long" <Jonathan.Long@carkw.com> Cc: Jason Lowder <Jason.Lowder@carkw.com>, Russ Huckaby <russ@biRrockrrc.com>, Bob <bob bigrockrrc.com> Subject: Village at the Gateway Phase III Final Plat Jason/Jonathan, Please find the attached PDF of the Final Plat for Phase III, Village at the Gateway, Little Rock, AR, for your review. Let me know if you have any questions or need additional information. Ashley Bice, PE Civil Engineer Big Rock Engineering T. 501.593.1298 A: 12505 Vimy Ridge Rd Alexander AR 72002 E. ashley@bigrockrrc.com 1 a��O ° aaF3 ' a � �aE B `_s Fs- I -T= - -- -- - - - - - - - - - - - s 3 P s a a nv [ - - - - - - - - - -- 8 8 9 a s E x OVK i `- -- - BLD^.I! S = as ° ,a, A 3 D. ROW a �I a zip 3 Ng 3S S�� �33 ss gY sL - - - - 1110" i _ -A sLDCK 4 �o$ooa�(Dgo a§o 1= ¢ 5 Q ww mm c� Is { F�^ ar I Pow si a�? I r I I � I W ROW LM it t —YNIOGEHOM 9g}� Yz= rIt 8' BLOCK 3 CIVIL ENGINEERING DIVISIOP; FINAL PLAT FILING APPROVAL;-"' FINAL PLAT NAME: VILLAGE AT GATEWAY PHASE III INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. E Addressing Specialist Date: 119 1 2� L NE TR FFIC ENG ER REPORT I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: _ The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for final plat approval have been satisfied. Civil Engineer I/II Date: /O%l317 SURVEYOR REPORT I have reviewed the plat and find that: 7— All requirements for final plat approval have been satisfied. p Surveyor Date: fr�� MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied r. '� _ Date: i � J 1 17 Design Review Engineer/Civil Engineering Manager Effective: Sept 19, 2017