HomeMy WebLinkAboutS-1755 Staff AnalysisITEM NO.: 4.
NAME: 65th Street Self Storage Subdivision Site Plan Review, located in the 4400
Block of 65th Street
LOCATION: located in the 4400 Block of 65th Street
Planning Staff Comments_
1. Provide notification of the property owners located within 200-feet of the
development including the certified abstract list, notice form with affidavit executed
and proof of mailing. The notice must be mailed no later than August 12, 2015. The
Office of Planning and Development must receive the proof of notice no later than
August 21, 2015.
2. The site plan indicates the rear areas will be covered and fenced. It appears the
turning movements with fences in place in a number of locations it appears the turn
will be difficult.
3. Will the facility have a gated 24-hour entry allowed access? The typical hours for
construction contractors is 6 am to 6 pm Monday through Friday, 7 am to 6 pm
Saturday and 1 pm to 6 pm Sunday. Staff has concerns with allowing contraction
contractors with access f6 am to 10 pm seven days per week.
4. The zoning district requires a 50/15/25 setback. The maximum building height
allowed is 45-feet.
5. Provide details of any proposed perimeter fencing. Provide the total height and the
construction material.
6. Provide the proposed signage plan. Provide the location of any proposed ground
sign. Include the total height and total area. The maximum height allowed in
Industrial Zones is 30-feet and the maximum sign area allowed in 72 square feet.
Wall signage is allowed at a maximum of 10 percent of the fagade fronting a public
street.
7. Provide a site lighting plan. All site lighting must be low-level and directional, aimed
downward and into the site.
8. Will there be a dumpster located on the site? If so indicate the dumpster location
along with a note concerning the required screening.
9. Provide the proposed phasing plan.
10. Will the front units contain conditioned and unconditioned storage space?
11. Provide the percentage of building coverage, the percentage of paved area and the
percentage of landscape area.
Variance/Waivers:
Public Works Conditions:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
2. All driveways shall be concrete aprons per City Ordinance.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction. If the development is proposed to be phased, is a
variance requested to grade future phases with construction of Phase 1?
4. All existing curb cuts not proposed to be used should be closed with new curb and
gutter.
5. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
7. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The driveway spacing from the side
property line on an arterial street is 150 feet. A variance must be requested for the
proposed driveway location.
8. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
9. An additional curb cut will not be permitted for the proposed future development on
the north adjacent to West 65th Street.
Utilities and Fire Department/County Planning:
WactPwntPr-
Entergy: Entergy does not object to this proposal. An overhead line exists on the
west side of the property as indicated on the plat and should not interfere with the
proposed use of the property. There is also a single phase line along the front of the
property on 65t" Street. Contact Entergy in advance regarding future service
requirements to the development, line extension, and future facilities locations as this
project proceeds.
CenterPoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
3. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Contact Central Arkansas Water regarding the size and location of water meter.
6. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project.
7. The facilities on -site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's materials and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of a Customer Owned Line
Agreement is required.
8. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives area used, a
reduced pressure zone back flow preventer shall be required.
9. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department: Maintain Access:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code
Vol. 1.
Section D104.1 Buildings exceeding three stories or 30 feet in height. Building or
facilities exceeding 30 feet or three stories in height shall have at least two means of fire
apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or facilities
having a gross building area of more than 62,000 square feet shall be provide with two
separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square feet
that have a single approved fire apparatus access road when all building are
equipped throughout with approved automatic sprinkler systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they shall
be placed a distance apart equal to not less than one half of the length of the maximum
overall diagonal dimension of the lot or area to be served, measured in a straight line
between accesses.
Dead Ends. Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4
Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates. Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road
gates. Gates securing the fire apparatus access roads shall comply with all of the
following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall
be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or when
a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL
325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water
(Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Captain Tony
Rhodes 501.918.3757). Number and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning_ No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Building Code: Project is subject to full commercial plan review and approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; cricheY _Iittlerock,org or
Mark AlderFer at 501.371.4875; malderfer@littlerock.org..
Planning Division: No comment.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. A land use buffer six (6) percent of the average width / depth of the lot will be
required when an adjacent property has a dissimilar use of a more restrictive nature.
The property to the west is zoned R-2, Single-family. As a component of all land use
buffer requirements, opaque screening, whether a fence or other device, a minimum
of six (6) feet in height shall be required upon the property line side of the buffer. A
minimum of seventy (70) percent of the land use buffer shall be undisturbed.
Easements cannot count toward fulfilling this requirement. The plantings, existing
and purposed, shall be provided within the Landscape Ordinance of the City, Section
15-81.
3. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property or the right-of-way of any street. This strip shall be at least
nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall be planted for
every thirty (30) linear feet of perimeter planting strip.
4. Landscape areas shall be provided between the vehicular use area used for public
parking and the general vicinity of the building, excluding truck loading or service
areas not open to public parking. These areas shall be equal to an equivalent
planter strip three (3) feet wide along the vehicular use area.
5. An irrigation system shall be required for developments of one (1) acre or larger.
6. For developments of less than one (1) acre a there shall be a water source within
seventy- five (75) feet of the plants to be irrigated.
7. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, August 12, 2015.
A a,,j 1et 97. 2015
ITEM NO_: 4
NAME: 65th Street Self Storage Subdivision Site Plan Review
LOCATION: Located in the 4400 Block of 65th Street
DEVELOPER:
65th Street Land Company, LLC
P.O. Box23670
Little Rock, AR 72211
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 23.4 acres
CURRENT ZONING
PLANNING DISTRICT:
CENSUS TRACT:
VARIANCEMAIVERS:
NUMBER OF LOTS: 1
1-2, Light Industrial
13 — 65th Street East
20.02
FILE
: S-1755
FT. NEW STREET: 0 LF
1. A variance from Sections 30-43 and 31-210 to allow the driveway to be located
nearer the property line than typically allowed.
2. A variance from the City's Land Alteration Ordinance to allow grading of the entire
site with the construction of the first phase of buildings.
3. A variance from Section 36-508 to allow the contractor's storage yard area to be
constructed of a graveled surface.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The proposed development contains 23.4-acres located at the southeast corner
of 65th Street and Patterson Road. The property is zoned 1-2, Light Industrial.
The developer is proposing a self -storage facility on the south 19.4-acres of the
property. The facility will be a combination of enclosed storage for individual
renters as well as a fenced outdoor storage area for contractors or similar users
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1755
needing outdoor storage. Several of the outdoor storage areas will have
individual enclosures for security and possibly covers to protect the storage area.
The site plan indicates the construction of eleven (11) buildings containing
172,500 square feet of self -storage. The buildings are proposed with a 15-foot
side yard setback and a 25-foot rear yard setback. The area proposed for future
development includes a 50-foot front setback as typically required per the 1-2,
Light Industrial zoning district.
The four (4) acres adjacent to 65th Street will be set aside for future development
utilizing 1-2, Light Industrial District uses as allowable uses.
B. EXISTING CONDITIONS:
The site is a relatively flat wooded site located south of 65th Street. The
Arkansas Food Bank is located to the east and Job Corp and The Goodwill of
Arkansas are located to the south. To the west is a single-family subdivision.
Along 65th Street there are a number of commercial and industrial type uses.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
All property owners located within 200 feet of the site along with the Upper
Baseline Neighborhood Association, the Wakefield Neighborhood Association
and Southwest Little Rock United for Progress were notified of the public hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
2. All driveways shall be concrete aprons per City Ordinance.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other than
residential subdivisions, site grading and drainage plans must be submitted
and approved prior to the start of construction. If the development is
proposed to be phased, is a variance requested to grade future phases with
construction of Phase 1 ?
4. All existing curb cuts not proposed to be used should be closed with new curb
and gutter.
2
August 27, 2015
SUBDIVISION
ITEM NO.: 4 Cont.) FILE NO.: S-1755
5. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
7. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The driveway spacing from the
side property line on an arterial street is 150 feet. A variance must be
requested for the proposed driveway location.
8. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of
occupancy.
9. An additional curb cut will not be permitted for the proposed future
development on the north adjacent to West 65th Street.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if new sewer
service is required for this project. Contact Little Rock Wastewater Utility for
additional information.
Entergy: Entergy does not object to this proposal. An overhead line exists on
the west side of the property as indicated on the plat and should not interfere with
the proposed use of the property. There is also a single phase line along the
front of the property on 65th Street. Contact Entergy in advance regarding future
service requirements to the development, line extension, and future facilities
locations as this project proceeds.
CenterPoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
3
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1755
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
3. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Contact Central Arkansas Water regarding the size and location of water
meter.
6. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 501.377.1226 if you would like to
discuss backflow prevention requirements for this project.
7. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's materials
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of a
Customer Owned Line Agreement is required.
8. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives area
used, a reduced pressure zone back flow preventer shall be required.
9. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
Fire Department:
Maintain Access:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive of
shoulders.
4
August 27, 2015
SUBDIVISION
ITEM NO.:
FILE NO.: S-1755
Commercial and Industrial Developments — 2 means of access. - Maintain
fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1.
Section D104.1 Buildings exceeding three stories or 30 feet in height.
Building or facilities exceeding 30 feet or three stories in height shall have at
least two means of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square
feet that have a single approved fire apparatus access road when all
building are equipped throughout with approved automatic sprinkler
systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of
the maximum overall diagonal dimension of the lot or area to be served,
measured in a straight line between accesses.
Dead Ends. Maintain fire apparatus access roads at dead end locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet
shall be provided with width and turnaround provisions in accordance with Table
D103.4. Requirements for Dead-end fire apparatus access roads.
Gates. Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus
access road gates. Gates securing the fire apparatus access roads shall
comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by
one person.
4. Gate components shall be maintained in an operable condition at all times
and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
0
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (Cont.
FILE NO.: S-1755
entry tools or when a key box containing the keys to the lock is installed at
the gate location.
7. Locking device specifications shall be submitted for approval \by the fire
code official
8. Electric gate operators, where provided, shall be listed in accordance with
UL 325.
9. Gates, intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012
Arkansas Fire Prevention Code. Section C101 — C105, in conjunction with
Central Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock Fire
Marshal's Office (Captain Tony Rhodes 501.918.3757). Number and Distribution
of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Project is subject to full commercial plan review and approval
prior to issuance of a building permit. For information on submittal requirements
and the review process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; criche [ittlerock.or or
Mark Alderfer at 501.371.4875; malderfer Iittlerock. or .
Planning Division: No comment.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. A land use buffer six (6) percent of the average width / depth of the lot will be
required when an adjacent property has a dissimilar use of a more restrictive
nature. The property to the west is zoned R-2, Single-family. As a component
of all land use buffer requirements, opaque screening, whether a fence or
other device, a minimum of six (6) feet in height shall be required upon the
property line side of the buffer. A minimum of seventy (70) percent of the land
A
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1755
9
use buffer shall be undisturbed. Easements cannot count toward fulfilling this
requirement. The plantings, existing and purposed, shall be provided within
the Landscape Ordinance of the City, Section 15-81.
3. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property or the right-of-way of any street. This strip shall
be at least nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall
be planted for every thirty (30) linear feet of perimeter planting strip.
4. Landscape areas shall be provided between the vehicular use area used for
public parking and the general vicinity of the building, excluding truck loading
or service areas not open to public parking. These areas shall be equal to an
equivalent planter strip three (3) feet wide along the vehicular use area.
5. An irrigation system shall be required for developments of one (1) acre or
larger.
6. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
SUBDIVISION COMMITTEE COMMENT:
(August 5, 2015)
Mr. Joe White of White-Daters and Associates was present representing the
request. Staff presented an overview of the item stating there are additional
items necessary to complete the review process. Staff questioned the area
proposed for contractor's storage. Staff stated it did not appear there was
adequate maneuverability room for trucks and trailers. Staff also questioned the
days and hours of operation for the proposed development.
Public Works comments were addressed. Staff stated the City's Stormwater
Detention ordinance would apply to the future development of the site. Staff also
questioned the driveway location and stated the requested location would require
a variance from the subdivision and master street plan ordinances.
Landscaping comments were addressed. Staff stated a land use buffer was
required along the western perimeter of the site. Staff stated screening was also
required along the western perimeter. Staff stated a minimum landscape strip of
nine (9) feet was required adjacent to paved areas.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
7
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (Cont.
H. ANALYSIS:
FILE NO.: S-1755
The applicant submitted a revised site plan to staff addressing the technical
issues associated with the request raised at the August 5, 2015, Subdivision
Committee meeting. The applicant the revised site plan has addressed staff's
concerns related to the maneuverability within the contractor's storage area. The
applicant has also indicated the days and hours of the proposed development.
A note on the site plan states the hours proposed are from 6:00 am to 7:00 pm
Monday through Friday. 7:00 am to 7:00 pm Saturday and from 1:00 pm to
7:00 pm Sunday. The City has established work hours for contractors. The
hours proposed for this development allow for one (1) additional hour at the end
of the day from the currently established contractors work hours within the City.
The applicant has stated the additional hour at the end of the day will allow the
contractor to leave a job site and store his equipment or materials and not violate
the approved hours of operation for the development.
The proposed development contains 23.4-acres and is currently zoned 1-2, Light
Industrial District. The development is proposed with a storage facility on the
south 19.4-acres and future development of the four (4) acres located along
West 65t" Street with a future 1-2, Light Industrial District user. The applicant is
requesting Subdivision/Multiple Building Site Plan Review as per Section 31-13
of the Little Rock Code of Ordinances. The request is to allow multiple structures
on a single parcel.
The storage facility will be a combination of enclosed storage for individual
renters as well as a fenced outdoor storage area for contractors or similar users
in need of outdoor storage. The outdoor storage area will have individual fenced
enclosures for security and possibly covers to protect the storage area. Eleven
(11) buildings containing 172,500 square feet of self -storage is proposed. The
buildings are proposed with a 15-foot side yard setback and a 25-foot rear yard
setback.
Signage will comply with signage allowed in industrial zones. A single
development sign is proposed along West 65th Street. The sign is proposed with
a maximum height of 30-feet and a maximum sign area of 72 square feet.
The request includes a variance from Sections 30-43 and 31-210 to allow the
driveway to be located nearer the property line than typically allowed. The
ordinance states drives are to be located a minimum of 150-feet from the
property line. The drive is located 50-feet from the property line. Staff is
supportive of the driveway placement. The drive for the adjacent property is
E:3
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1755
located near its eastern property line. Patterson Road intersects West 65th Street
near this property's western boundary. Staff feels the separation will limit
potential conflicting traffic movements from this development and Patterson
Road.
The applicant is seeking a variance from the City's Land Alteration Ordinance to
allow grading of the entire site with the construction of the first phase of buildings.
The applicant has indicated the grading is necessary to balance to site and limit
the amount of fill needed for subsequent phases of this development.
The request includes a variance from Section 36-508 to allow the contractor's
storage yard area to be constructed with a graveled surface. The zoning
ordinance states all areas subject to wheeled traffic are to be constructed of a
hard surface material. The applicant has stated due to the potential users of the
site, heavy equipment and trailers, the movement of the vehicles will potentially
damage the pavement and cause deterioration. Staff is supportive of the
request. The City recently adopted an ordinance allowing for Low Impact
Development and allowing construction of parking lots with a pervious material.
Staff feels the applicant's proposal meets the intent of the recently adopted
ordinance.
The Subdivision Ordinance states Subdivision Site Plan Review is a
development review process that provides for case by case consideration of
project particulars including the provision of parking and landscaping in
accordance with the appropriate ordinances, siting of buildings, and the
relationships with adjoining properties. The property is zoned 1-2, Light Industrial
District. The zoning district establishes setbacks as a 50-foot front yard and
15-foot side yards and 25-foot rear yards. The site plan indicates the placement
of a 16-foot building setback along the eastern perimeter and a 135-foot building
setback along the western perimeter. The rear setback is indicated with a
minimum setback of 25-feet.
The maximum height of buildings is 45-feet. The buildings are proposed with
adequate setbacks to meet the minimum requirements of the zoning district. The
maximum building height proposed is 35-feet. The rear of the self -storage
buildings will be placed to provide security and screening. The contractor's
storage area will be screened with fabric mesh placed on a chain link fence.
Ordinance No. 20,839 adopted by the Little Rock Board of Directors on February
11, 2014, modified Section 31-13(f) of the Little Rock Code to limit the term of
approval of a site plan to a maximum of three years from the date of approval. If
an approved multi -phase development, has not been completed within three (3)
years of the date of approval the site plan must be reviewed and reapproved by
the Commission in the same manner as the initial site plan review
I
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1755
Staff is supportive of the applicant's request. The request appears to comply
with the development criteria of the underlying zoning. Although there are
variances associated with the request staff does not feel these variances will
adversely impact the development or the area. The site plan as presented
preserves a 70-foot undisturbed buffer along the western perimeter which abuts
the Wakefield Subdivision.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the following variance requests:
1. A variance from Sections 30-43 and 31-210 to allow the driveway to be
located nearer the property line than typically allowed.
2. A variance from the City's Land Alteration Ordinance to allow grading of the
entire site with the construction of the first phase of buildings.
3. A variance from Section 36-508 to allow the contractor's storage yard area to
be constructed with a graveled surface. The design and treatment of this
surface must be approved by public works staff prior to construction.
PLANNING COMMISSION ACTION: (AUGUST 27, 2015)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report.
Staff presented a recommendation of approval of the following variance requests:
1. A variance from Sections 30-43 and 31-210 to allow the driveway to be located
nearer the property line than typically allowed.
2. A variance from the City's Land Alteration Ordinance to allow grading of the
entire site with the construction of the first phase of buildings.
3. A variance from Section 36-508 to allow the contractor's storage yard area to be
constructed with a graveled surface. The design and treatment of this surface
must be approved by public works staff prior to construction.
10
August 27, 2015
SUBDIVISION
ITEM NO.: 4 (C
FILE NO.: S-17
There was no further discussion. The item was placed on the consent agenda and
approved as recommended by staff by a vote of 11 ayes, 0 noes and 0 absent.
11