HomeMy WebLinkAboutS-1751 Map 1Basis of Bearing: LIT Control Network, Arkansas North Zone
LEGEND
®
Electric Meter
E❑
Electric Box
wu
Water Meter
>4
Water Valve
¢-
Fire Hydrant
C-
Guy Anchor
�-
Utility Pole
Light Pole
Gas Meter
nG
Gas Valve
so
Stan Drain Manhole
Sanitary sewer Manhole
ZTELE
Telephone PedestaVRiser
•
Property Monument(found)
*
Properly Monument(set)
61v4i�
Deciduous Tree
Sign
—�'• rM—
Water Una
—w �—
Gee; Una
6s
Sanitary Sewer Una
F0
Fiber Optic Una
Underground Telephone Lira;
r•
Oven and Electric Una
— — —S•—
Underground Electric Una
O1TM
CATV Cable Line
Fence
—PL PL—
Prop" Una
UTILITIES
CAUTION:
Underground Utilities exist within and adjacent to the limits of construction and an attempt has
been made to locate these Utilities on the plans. However, all existing utilities may not be shown
and the actual locations of the utilities may vary from the locations shown. Prior to beginning
any type of excavation, the Contractor shall contact the utilities involved and make
arrangements for the location of the utilities on the ground. The Contractor shall maintain the
utility location markings until they are no longer necessary.
Arkansas State Law, the Underground Facilities Damage Prevention Act, requires two working
days advance notification through the Arkansas One -Call System Center before excavating
using mechanized equipment or explosives (except in the case of an emergency). The One -Call
System phone number is 1-800-482-8998. The Contractor is advised that there is a severe
penalty for not making this call. Not all Utility Companies are members of the Arkansas
One -Call System; Therefore, the Contractor is advised to contact all non-member utilities, as
well as the One -Call System.
CRISP C"
SITE SURVEY
SCALE: 1 : 40
FL
AR CHILDREN'S HOSPITAL
HANGAR
r 4_
(
j
GPM1 INB
,lTm.
xueiEJill
I .
66MN
TOP4
IFw N
INV6
Nvw
r
Na N,NP,s
Gnat, Ns,
ld
h9PN TAWNPACE
PRRbNG LOT
G,q IFN,
Tn, p56
m..,E
"NEENB.,5 I ESEPRLTSVNEACE
NNEGRIGW
IHVS.ME, B'CIAY
sw 2W8BG Cur r
wVv w.GG IF
aNG LOT
S
PK
CP.103fl.
PK
QfIbPORNE
CPNOPY BUILDING
o r L,♦E r
fMI6HEp FLWR�
ELEV RSq 00
TAC AIR
BUILDING
CRISP DRVE
0.R
TOP ENI ED
NVMO<3
PPPEMSRH4NOONEG
ri
ALLTEL HANGAR
GM INN
Tm2S5Te
FNCD DI
+CP 1o380
PK
/ 6M D.
93 Q
'NU
f 2505E
/
N
.'P CANcwvovER
GP,e I le
Tm�
+
r
NSF.S,
at- �cR,a3e,
PK
PIE
OrvC
FINISHED FL1R r.
ELEV M]6
0.WHFLTSVRFECE
PARKING LOT ,yL
�r
r
r r
ESPHALTSURFACE
r ( - TAC AIR NORTH
BUILDING
+
•
ewc
GGEswEsi
,p ')
j'
Ir
sam GGS
Tm aofi.0
PIwsHEGELGOR
r
OFRFOADHE COARSE,
OF ECOMER
` y wwa r
\
FEND
CRPAR(ING LOT ELEV ZEfl3
r
ice,
PR
r
Q
r
r r
CONCRETE EROSION CONTROL
r
-Ni.
/
L&wg6 DrrnwNw Pca
wNsmuCllON PLgN +
(
SET
GEUR R PROJECTROBBIE
+
+
0WTRUAS CggWNIN PER
110PIµ GET r
/ PROJECT
ECT HVMBr♦
URN64ER
+
CONCgETE 6VRFgCE
r
CONCRETE 6UNERCE \
+ r
r
t
/
j1
r + r
+ �
6EWERNOTENIS:
LINE (�900. BBB
LC PEgIMETERDRAWING /
EO hNG. CaSRVER
r rPR JECi NUMBER Bpp, {µIp
i
RKING
+
%
ERE ENTRY INT
NY INTO
O
THE BUILDING 9NOT
BROWN
a.
�
/
r
r
+
r r r
Ci r r • r /�
E.1.1
r CPPK 363 /
n
/ —SURE.,
` r
Ill
ABIRALTSVRISSE
r r r
r • r
r + r
+ SONVL
UNE WP6GRgWN PER
COTVPERIMETEADRgWING
PiWAWG.GVNER
ROJECTNVNBER Wp11BW