HomeMy WebLinkAboutS-1501-D Staff AnalysisMay 24, 2007 ITEM NO.: 11 FILE NO.: S-1501-D NAME: Dassault Falcon — Paint and Prep. Hangar — Subdivision Site Plan Review LOCATION: Located at 3801 East 10th Street DEVELOPER: Dassault Falcon Jet 3801 East 10th Street Little Rock, AR 72202 ENGINEER: FTN Associates, Ltd. 3 Inwood Circle, Suite 220 Little Rock, AR 72211 ARCHITECT: Hurd Long Architects & Design Consultants 319 President Clinton Avenue, Suite 201 Little Rock, AR 72201 AREA: 70.49 acres CURRENT ZONING: PLANNING DISTRICT: CENSUS TRACT NUMBER OF LOTS: 1 zoning lot FT. NEW STREET: 0 LF 1-2, Light Industrial 25 — Port Planning District VARIANCESMAIVERS REQUESTED: A five (5) year deferral of the Master Street Plan requirement for street construction to East 10th Street. A. PROPOSAUREQUEST: The applicant is requesting a subdivision site plan review of a multiple building site for the proposed new Dassault Falcon Jet Paint and Prep Hangar to be located at the Dassault Falcon Jet Facility at 3801 East 10th Street. The building project is a new building at the DFJ Facility, that at present consists of 713,000 square feet of aircraft service hangars, aircraft painting hangars, interiors design May 24, 2007 SUBDIVISION ITEM NO.: 11 (Cont.) _ FILE NO.: S-1501-D offices, interiors fabrication and installation shops, cafeteria and administrative offices. The proposed project is a 66,000 square foot 3-bay paint and prep hangar located on the south side of DFJ leased property, along the south side of East 10th Street and the North side of Little Rock National Airport. The project will add additional aircraft production space for aircraft presently in production, along with space for a new line of larger Falcon Aircraft coming into production this year. The proposed project consists of 3 main elements: (1) 56,000 square foot 3-bay aircraft paint hangar and 1-bay prep hangar with water suppression sprinkler system and 28-foot tall hangar doors allowing for 4 aircraft (2) 1-hour firewall separation between work hangar areas and water fire sprinkler system (3) 10,000 square feet of office and work areas with water sprinkler system. The project construction consists of pre-engineered metal building construction to match the existing adjacent buildings, roof top mechanical systems, aircraft parking and access ramps on the north side of the building, water detention and drainage structures on the southeast side of the building. The addition of the building as proposed should not generate the requirement for additional parking. Present DFJ has parking for 1,300 cars on the site located on the north side of the building. B. EXISTING CONDITIONS: The area proposed for the construction is a lease area of the airport and is located along the general aviation runway. There are a number of aviation related businesses located in the area around the airport property. To the north of the site are a number of residential uses including single-family residences, multi -family housing and a church. The airport has purchased most of the area south of East 9th and east of Ventura and the airport is negotiating with owners of the remaining homes for acquisition. These homes will be removed with the first phase of the airport's expansion plan. C. NEIGHBORHOOD COMMENTS: All property owners located within 200-feet of the site and the East Little Rock Neighborhood Association were notified of the public hearing. As of this writing staff has received one informational phone call from an area resident. 2 May 24, 2007 SUBDIVISION ITEM NO.: 11 (Cont. X E. F ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: FILE NO.: S-1501-D 1. With site development, provide the design of street conforming to the Master Street Plan. Construct one-half street improvement to 10th Street including 5-foot sidewalks with the planned development. Staff is supportive of a 5 year deferral based the future airport expansion. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available to the property. Entergy: No comment received. Center -Point Ener : Approved as submitted. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. Please submit plans for modification of the fire protection system to Central Arkansas Water for review. Contact Central Arkansas Water regarding procedures for extension of the fire service to this facility. Fire sprinkler systems, which do not contain additives such as antifreeze, shall be isolated with a double detector check valve assembly. If additives are used, a reduced pressure zone backflow preventer will be required. Contact Central Arkansas Water if larger and/or additional meter(s) are needed. Fire Department: Approved as submitted. Counly Planning: No comment. CATA: The site is located near CATA Bus Route # 12 — the East 6th Street Route. ISSUES/TECHNICAL/DESIGN: Planning Division: No comment. Landscape: 1. Compliance with the City's Landscape and Buffer Ordinances is required. 2. Any new parking areas must comply with the city's minimum landscape and buffer ordinances. 3 May 24, 2007 SUBDIVISION ITEM NO.: 11 (Cont. FILE NO.: S-1501-D 3. It is both encouraged and recommended to plant some trees on the site for the overall upgrade in appearance for the Little Rock Airport G. SUBDIVISION COMMITTEE COMMENT: (May 3, 2007) The applicant was present representing the request. Staff presented an overview of the proposed development stating the Dassault Falcon Jet had two items on the current agenda. Staff stated one item was for a site plan review of a flight line hangar and the second was a site plan review of a paint and prep hangar. Staff stated there were few outstanding issues associated with the requests. Staff stated it was encouraged to plant trees around the perimeter of the site to upgrade the overall appearance for the Little Rock National Airport but no new landscaping was required with the proposed site development. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: There were no remaining technical issues associated with the request remaining from the May 3, 2007, Subdivision Committee meeting. The applicant is seeking a subdivision site plan review of a multiple building development for the proposed new Dassault Falcon Paint and Prep Hangar. The building project is a new building at the DFJ Facility, that at present consists of 713,000 square feet of aircraft service hangars, aircraft painting hangars, interiors design offices, interiors fabrication and installation shops, cafeteria and administrative offices. The proposed project is a 66,000 square foot 3-bay paint and prep hangar located on the south side of DFJ leased property. The project will add additional aircraft production space for aircraft presently in production, along with space for a new line of larger Falcon Aircraft coming into production this year. The proposed project consists of three (3) main elements. The first is a 56,000 square foot 3-bay aircraft paint hangar and 1-bay prep hangar with a water suppression sprinkler system and 28-foot tall hangar doors allowing for 4 aircraft. The second is a 1-hour firewall separation between work hangar areas and a water fire sprinkler system and a 10,000 square foot of office and work areas with water sprinkler system. The project construction consists of pre-engineered metal building construction to match the existing adjacent buildings, roof top mechanical systems, aircraft parking and access ramps on the north side of the building, water detention and drainage structures on the southeast side of the building. 4 May 24, 2007 SUBDIVISION ITEM NO.: 11 (Cont. FILE NO.: S-1501-D The proposed request does not include any additional signage or parking. The existing signage should address signage needs for the development. The addition of the building as proposed will not generate the requirement for additional parking. Presently an employee parking area containing 1,300 parking spaces is located on the north side of the building. The applicant is seeking a five year deferral of the required street improvements to West 10th Street. According to the applicant, they will request abandonment of portions of West 10th Street in the near future. Staff is supportive of the request. With the acquisition of properties to the north of the site by the Little Rock Airport and the Airport's Master Plan including this area of West 10th Street with aviation related activities staff does not feel the construction of the street at this time would serve any public purpose. Staff is supportive of the request. To staffs knowledge there are no outstanding issues associated with the request. Staff does not feel the additional of the building as proposed should have a significant impact on the development or the area. AFF RECOMMENDATIONS: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff recommends approval of a five-year deferral of the required street improvements to East 10th Street. PLANNING COMMISSION ACTION: (MAY 24, 2007) The applicant was present representing the request. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff presented a recommendation of approval of a five (5) year deferral of the required street improvements to East 10th Street. There was no further discussion of the item. The chair entertained a motion for placement of the item on the Consent Agenda for Approval. The motion carried by a vote of 6 ayes, 0 noes, 4 absent and 1 open position. ITEM NO.: 11. S-1501-D NAME: Dassault Falcon — Paint and Prep. Hanger — Subdivision Site Plan Review LOCATION: located at 3801 East 10th Street Planning Staff Comments: 1. Provide notification of property owners located within 200 feet of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than May 9, 2007. The Office of Planning and Development must receive the proof of notice no later than May 16, 2007. Variance/Waivers: Public Works Conditions: 1. With site development, provide the design of street conforming to the Master Street Plan. Construct one-half street improvement to 10th Street including 5-foot sidewalks with the planned development. Staff is supportive of a 5 year deferral based the future airport expansion. 2. Drainage and detention plans are approved according to plans submitted by Garver Engineers. There is no increase in storm water to the pump station. Utilities and Fire Department/County Planning: Wastewater: Sewer available to the property. Entergy: No comment received. Center -Point Energy: Approved as submitted. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. Please submit plans for modification of the fire protection system to Central Arkansas Water for review. Contact Central Arkansas Water regarding procedures for extension of the fire service to this facility. Fire sprinkler systems, which do not contain additives such as antifreeze, shall be isolated with a double detector check valve assembly. If additives are used, a reduced pressure zone backflow preventer will be required. Contact Central Arkansas Water if larger and/or additional meter(s) are needed. Fire Department: Approved as submitted. Item # I I County Planning: No comment. CATA: The site is located near CATA Bus Route # 12 — the East 6th Street Route. Planning Division: No comment. Landscape: 1. Compliance with the City's Landscape and Buffer Ordinances is required. 2. Any new parking areas must comply with the city's minimum landscape and buffer ordinances. 3. It is both encouraged and recommended to plant some trees on the site for the overall upgrade in appearance for the Little Rock Airport Revised plat/Plan: Submit four (4) copies of a revised preliminary plat (to include the additional information as noted above) to staff on Wednesday, May 9, 2007. Item # 11