Loading...
HomeMy WebLinkAboutS-1477-H ApplicationCity of Little Rock Planning and Development Filing Fees Date: � i l l,- , 20_( Annexation Board of Adjustment Cond. Use Permit/T.U.P. Final Plat Planned Unit Dev. Preliminary Plat Special Use Permit Rezoning Site Plans Street Name Change Street Name Signs Number at ea. Public Hearing $igns Number at ea. Total File Nn_ CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME TWO RIVERS HARBOR REPLAT OF TRACT I INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance and a punch list has been prepared and sent. Engineering Specialist Date: 6 eet configuration are acceptable. Addressing Specialist Date: 2I Doi TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for billing to developer: Certain improvements remain uncompleted and a punch list has been prepared and sent. PO 'i K.,Q" q V.2'" 0 Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. `r 2zl a� Civil Engineer I/II Dater SURVEYOR'S REPORT I have reviewed the plat and find that: All requi ents for final plat approval have been satisfied. Surveyor Date: MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. �c�.`. j•._ _ Date: 2?i Design Review Engineer/Civil Engineering Manager July 2005 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME TWO RIVERS HARBOR REPLAT OF TRACT 1 INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. and a punch list has been prepared and sent. Engineering Specialist Date: � — '� ( - L?6 eet configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for billing to developer: Certain improvements remain uncompleted and a punch list has been prepared and sent. PO 'f "Q t.A 0 Traffic Engineer CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: Date: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. Y•K,�, T�--- Civil Engineer I/II Dater k Z11 d� SURVEYOR'S REPORT I have reviewed the plat and find that: _ All requ' eats for final plat approval have been satisfied. _ Surveyor Date: MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. Date: k Z) ems. Design Review Engineer/Civil Engineering Manager July 2005