Loading...
HomeMy WebLinkAboutS-1477-G ApplicationCity of Little.Rock Planning and Development Filing Fees Date: . 1 , 20 Annexation $ Board of Adjustment $ Cond. Use Permit/T.U.P. $ Final Plat $ IP3 Planned Unit Dev. $ Preliminary Plat $ Special Use Permit $� Rezoning $ Site Plans $ Street Name Change $ Street Name Signs Number at ea. $ Public Hearing Signs Numbef at ea. $ Total l g31 File No. LocationR Applicant .1 By CIVIL ENGINEERING DIVISION FINAL PLAT, FILING APPROVALS FINAL PLAT NAME TWO RIVERS HARBOR TRACT 3-R INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Wom remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: — -- / ADDRESSING SPECIALIST'S REPORT I ve re ie d t I fi that the street names and street configuration are acceptable. Addressing Specialist Date: Z Qlo TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for billing to developer: Certain improvements remain uncompleted and a punch list has been prepared and sent. a ? t2 FQ"-;h j CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: Traffic Engineer Date: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. Civil Engineer I/II Date:�2 210(. SURVEYOR'S REPORT I have reviewed the plat and find that: Q All require for final plat approval have been satisfied. l Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. YDate: f''22. h b Design Review Engineer/Civil Engineering Manager July 2005 Date: /O CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME TWO RIVERS HARBOR TRACT 3-R INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvemem remain uncompleted and a punch list has been prepared and sent. I_ r/ Engineering Specialist Date: ADDRESSING SPECIALIST'S REPORT 1 rve re` ie d t l E that the street names and street configuration are acceptable. 41 Addressing Specialist Date: Q� TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for billing to developer: Certain improvements remain uncompleted and a punch list has been prepared and sent. /V O T 12Gt Gku.;3 'j Traffic Engineer CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: Date: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. r Civil Engineer I/II Date: SURVEYOR'S REPORT I have reviewed the plat and find that: Q All require for final plat approval have been satisfied. Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. '�)s Date: Y 122. I (3 c. Design Review Engineer/Civil Engineering Manager July 2005 Date: