Loading...
HomeMy WebLinkAboutS-1473-A ApplicationCIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME:GRIFFIN ADDITION INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and/sent.] e.� gy vim- Engineering Specialist Date: J012310(0 ADDRESSING SPECIALIST'S REPORT I have review the plat and find that the street names and street configuration are acceptable. y4u� 52" Addressing Specialist Date: (% -2 TRAFFIC ENGINEER REPO I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for billing to developer: Certain improvements remain uncompleted and a punch list has been prepared and sent. D'j 1LzQL k-24Fi 0 Traffic Engineer Date:. CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: _ The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. /I r i--,� Civil Engfzcr 1/II Date: 1y12-?JC O SURVEYOR'S REPORT I have reviewed the plat and find that: !/ D All requirements for final plat approval have been satisfied. Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. I V'-:� `J'�� Date: {O%231Ol0 July 2005 Date: