HomeMy WebLinkAboutS-1471-A Staff AnalysisITEM NO.: 2
NAME: Chenal-Kanis Revised Preliminary Plat
S-1471-A
LOCATION: located on the Northwest corner of Chenal Parkway and Kirk Road
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract
list, notice form with affidavit executed and proof of mailing. The notice must be
mailed no later than December 25, 2013. The Office of Planning and Development
must receive the proof of notice no later than January 3, 2014.
2. Provide the zoning classification within the plat boundary and of abutting areas
shown.
Variance/Waivers-
None requested.
Public Works Conditions:
1. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The driveway spacing on an arterial
street is 300 feet from other driveways and intersections and 150 feet from side
property lines. The driveway is located 250 feet from the driveway to the east and
260 feet from the right-of-way of the proposed private street to the west.
2. The site has two (2) existing access driveways and proposing an additional access
at the Chenal Parkway/Kanis Road intersection for a total of three (3) accesses
which exceeds the usual number of accesses to a property similar in size. This
application proposes a 4th driveway which is excessive.
3. The proposed driveway is within the Chenal Parkway/Kanis Road intersection
resulting in vehicles crossing three (3) lanes of traffic to make a left at the
intersection.
4. The proposed private street constructed as the 4th leg of the Chenal Parkway/Kanis
Road intersection does not meet City ordinance requirements and standard details.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required to serve Lot 1. Contact Little Rock
Wastewater Utility for additional information.
Entergy: No comment received.
Center -Point Enerav: No comment received.
Item # 2.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. A 39-inch raw water line crosses north of this site within a 50-foot wide waterline
easement on north side of property. Care must be taken to protect these water lines
and any appurtenances, such as access and air release vaults or monumentation
which may be in the area. No signs, light poles, dumpster pads or other structures
on foundations will be allowed within the existing 50-foot waterline easement. Paved
parking and driveways are allowed. Due to the critical nature of the 39-inch raw
water line located near this grading please contact Central Arkansas Water at 501-
594-5261, 24-hours prior to any work within the water line right of way.
3. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
5. Contact Central Arkansas Water regarding the size and location of the water meter.
6. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
7. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the expense of the Developer.
8. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZ) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water
requires that upon installation of the RPZA, successful tests of the assembly must
be completed by a certified Assembly Tester licensed by the State of Arkansas and
approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
9. The facilities on -site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of a Customer Owned Line
Agreement is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
Item # 2.
County Planning: No comment.
CATA: Out of service area by over 2-miles.
Parks and Recreation: No comment received.
Plannina Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, December 11, 2013.
Item # 2.
February 20, 2014
M NO.: C FILE NO.: S-1471-A
NAME: Chenal-Kanis Revised Preliminary Plat
LOCATION: Located on the Northwest corner of Chenal Parkway and Kirk Road
DEVELOPE
Rees Commercial
11719 Hinson Road
Little Rock, AR 72227
ENGINEER:
White-Daters and Associates
Mr. Joe White
24 Rahling Circle
Little Rock, AR 72223
AREA: 4.08 acres NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
CURRENT ZONING: C-3, General Commercial District
PLANNING DISTRICT: 19 - Chenal
ENSUS TRACT: 42.16
VARIANCEM/AIVERS: None requested.
BACKGROUND:
On January 20, 2005, the Little Rock Planning Commission approved a preliminary plat
for this development. The developer proposed to plat three commercial lots on
4.1 acres with two (2) driveway locations. The lots had frontage on Chenal Parkway
with common driveways providing access within the development and to Kirk Road.
The common drive to the north would be constructed over an existing 39-inch raw water
line in a 50-foot right-of-way owned by Central Arkansas Water. The applicant indicated
right-of-way dedication per the Master Street Plan along Chenal Parkway and Kirk Road
would be provided.
February 20, 2014
SUBDIVISION
ITEM NO.: C
FILE NO.: S-1471-A
The lots have not been final platted at this time. The applicant is currently constructing
a strip retail center on the eastern lot and has an application before the Little Rock
Planning Commission on this agenda to allow the placement of a carwash on the
proposed second lot.
A. PROPOSAUREQUEST/APPLICANT'S STATEMENT:
The applicant is now requesting to amend the previously approved preliminary
plat by reducing the number of lots from three (3) to two (2) and requesting an
additional driveway along Chenal Parkway. The eastern location (Lot 2) will be
right in/right out only. A second drive is proposed at the intersection of Kanis and
Chenal Parkway which will be constructed as a private commercial street. The
third is an existing driveway located along the north portion of the site and serves
this development along with the undeveloped property to the north and provides
access to both Kirk Road and Chenal Parkway.
B. EXISTING CONDITIONS.
The site is in various states of clearing and grading for the development of a
proposed retail building and a potential carwash. The driveway extending from
Chenal Parkway to Kirk Road is in place. There is an electrical transmission line
located along the northern perimeter of the site. Chenal Parkway is a four lane
median roadway constructed with curb and gutter but no sidewalk is in place
adjacent to this site. There is a traffic signal located at the intersection of Chenal
Parkway and Kanis Road.
There is a convenience store located to the east of the site at the intersection of
Kirk Road and Chenal Parkway. Kirk Road has been improved at the
intersection with Chenal Parkway but is a narrow two-lane road adjacent to the
proposed site. North of the site is vacant property also zoned C-3, General
Commercial District as is the property located West of the site, across Chenal
Parkway.
C. NEIGHBORHOOD COMMENTS. -
As of this writing, staff has not received any comment from area residents. All
abutting property owners along with the Parkway Place POA, St. Charles
Community Association and the Villages of Wellington Neighborhood Association
were notified of the public hearing.
2
February 20, 2014
SUBDIVISION
ITEM NO.: C Cont. FILE NO.: S-1471-A
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The driveway spacing on an
arterial street is 300 feet from other driveways and intersections and 150 feet
from side property lines. The driveway is located 250 feet from the driveway
to the east (convenience store driveway) and 260 feet from the right-of-way of
the proposed private street to the west (shared drive between Lots 1 and 2).
2. The site has two (2) existing access driveways and proposing an additional
access at the Chenal Parkway/Kanis Road intersection for a total of three (3)
accesses which exceeds the usual number of accesses to a property similar
in size. This application proposes a 4th driveway which is excessive.
3. The proposed driveway is within the Chenal Parkway/Kanis Road intersection
resulting in vehicles crossing three (3) lanes of traffic to make a left at the
intersection.
4. The proposed private street constructed as the 4th leg of the Chenal
Parkway/Kanis Road intersection does not meet City ordinance requirements
and standard details.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING
Wastewater: Sewer main extension required to serve Lot 1. Contact Little Rock
Wastewater Utility for additional information.
Entergy: Entergy has worked with the engineering firm/developer concerning this
plan in the past. Both lots encroach on AP&L transmission line easement and
any construction on the lots (roadways and parking included) must comply with
Entergy Transmission requirements.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
3
February 20, 2014
SUBDIVISION
ITEM NO.: C (Cont.) _ _ FILE NO.: S-1471-A
2. A 39-inch raw water line crosses north of this site within a 50-foot wide
waterline easement on north side of property. Care must be taken to protect
these water lines and any appurtenances, such as access and air release
vaults or monumentation which may be in the area. No signs, light poles,
dumpster pads or other structures on foundations will be allowed within the
existing 50-foot waterline easement. Paved parking and driveways are
allowed. Due to the critical nature of the 39-inch raw water line located near
this grading please contact Central Arkansas Water at 501-594-5261,
24-hours prior to any work within the water line right of way.
3. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water
service is required.
5. Contact Central Arkansas Water regarding the size and location of the water
meter.
6. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
7. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the expense of
the Developer.
8. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZ) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
9. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
2
February 20, 2014
SUBDIVISION
ITEM NO.: C
FILE NO.: S-1471-A
engineer, licensed to practice in the State of Arkansas. Execution of a
Customer Owned Line Agreement is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
County Planning: No comment.
CATA: Out of service area by over 2-miles.
Parks and Recreation: No comment received-
F. ISSUES/TECHN ICAUDESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (December 5, 2013)
Mr. Joe White of White-Daters and Associates was present representing the
request. Staff presented the item stating the request was a revision to a
previously approved preliminary plat to allow the placement of an additional
driveway on Chenal Parkway. Staff stated there were concerns with allowing the
additional drive. Staff stated the proposed driveway did not comply with the
minimum driveway spacing criteria of the Subdivision or Boundary Street
Ordinances.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
There were no outstanding technical issues associated with the request in need
of addressing raised at the December 5, 2013, Subdivision Committee meeting.
The request is to amend the previously approved preliminary plat by reducing the
number of lots from three (3) to two (2) and requesting an additional driveway
along Chenal Parkway. The eastern driveway location is proposed as right
in/right out only. A second drive will be shared between the two (2) lots. This
drive will be constructed to commercial street standard and connect the
development to the intersection of Kanis and Chenal Parkway. A third driveway
February 20, 2014
SUBDIVISION
ITEM NO.: C (Cont.
FILE NO.: S-1471-A
is located along the northern boundary of Lot 1. This location provides access
across the rear of the development connecting Kirk Road and Chenal Parkway.
This driveway is in place.
As proposed the driveway locations and widths do not meet the traffic access
and circulation requirements of Sections 30-43 and 31-210. The driveway
spacing on an arterial street is 300 feet from other driveways and intersections
and 150 feet from side property lines. The driveway as proposed is located
250 feet from an existing driveway serving a convenience store to the east and
260 feet from the right-of-way of the proposed private street to the west (shared
driveway between Lots 1 and 2). The proposed plat indicates two (2) access
driveways and an additional access at the Chenal Parkway/Kanis Road
intersection constructed to a commercial private street standard for a total of
three (3) driveway accesses. This exceeds the usual number of driveway
accesses allowed for a property similar in size.
Staff is not supportive of the request. Staff feels the two existing drives as
approved by the previous preliminary plat are adequate to meet the demand of
the development.
STAFF RECOMMENDATION:
Staff recommends denial of the request.
PLANNING COMMISSION ACTION: (JANUARY 9, 2014)
The applicant was present. There were no registered objector present. The Chair
informed the applicant there were eight (8) Commissioners present. The Chair stated it
was the Commission's practice that when fewer than nine (9) Commissioners were
present the applicant was offered the option of deferral to a later meeting to allow more
members to be present to hear the request. The Chair stated for an item to be
approved six (6) positive votes were required.
Mr. Tim Daters requested a deferral of the item to the next available meeting date.
The Chair informed Mr. Daters the item would be deferred to the February 20, 2014,
Subdivision Hearing. A motion was made to approve the deferral request. The motion
carried by a vote of 6 ayes, 0 noes, 4 absent and 1 open position.
0
February 20, 2014
SUBDIVISION
ITEM NO.: C
LE NO.: S-1471
PLANNING COMMISSION ACTION: (FEBRUARY 20, 2014)
Mr. Randy Frazier, Mr. Ernie Peters, Mr. Frank Riggins and Mr. John Reese were
present representing the request. Staff presented an overview of the development
stating the request was to allow a driveway spacing variance along Chenal Parkway.
Staff stated they were not supportive of the driveway spacing variance request as
proposed by the applicant.
Mr.. Frazier stated he would yield the floor to Mr. Peters who could better address the
driveway spacing variance request and why the variance was necessary to facilitate
traffic movement in the area. Mr. Peters stated the driveway was proposed as a
right-in/right-out drive. He stated this configuration was quiet common around the City
and the Commission and staff had supported a variance similar to the request on the
Consent Agenda for a development just to the west of this site on Chenal Parkway. He
stated the second driveway would allow additional capacity at the traffic signal by not
forcing all the exiting traffic to pass through the traffic signal to leave the development.
He stated the property had 700 feet of frontage which would typically allow an additional
drive, other than the private street at the signalized intersection.
Commissioner Nunnley questioned the private street and the spacing between the
intersection. Mr. Peters stated the ordinance stated drives should be 300 feet from
intersections. He stated the drive, if approved, would be 260 feet. Commissioner
Nunnley questioned the downside to granting the variance. Mr. Peters stated he did not
feel there was a downside to granting the variance. He stated it was not out of
character with other drives which had been approved by the City.
There was a general discussion concerning the existing travel lanes on Chenal Parkway
and the capacity of the travel lanes. Mr. Peters stated at the time the street
improvements to Chenal Parkway were installed the developer made improvements
based on a 20 year plan.
Commissioner Berry questioned if the driveway would be placed on a deceleration lane
or if the lane was a lane providing through movement. Mr. Peters stated there were
three through travel lanes in each direction adjacent to the site. He stated the drive
would be located on a through travel lane. Commissioner Berry stated he had concerns
with the placement of the driveway as proposed since the lane was a through travel
lane.
Mr. Frazier requested the driveway spacing variance request be removed from the plat
and the Commission vote on the plat request to allow the creation of two (2) lots. Staff
stated the reason the item was before the Commission was for the driveway spacing
request. Staff stated the developer had an approved preliminary plat for the property.
VA
February 20, 2014
SUBDIVISION
ITEM NO.: C (Cont.
FILE NO.: S-1471-A
Mr. Frazier questioned since the original approval included three (3) lots did the
Commission not need to approve the reduction to two (2) lots. Staff stated at an
administrative level they were allowed to reduce the number of lots to two (2).
There was no further discussion of the item. A motion was made to approve the
withdrawal request of the item. The motion carried by a vote of 10 ayes, 0 noes and
1 absent.
A