HomeMy WebLinkAboutS-1457 Staff AnalysisCommercial Site Plan Review
PLANNING AND DEVELOPMENT
501 WEST MARKHAM
LITTLE ROCK, AR 72201
501-340-8262
DATE:
DEVELOPMENT: Hampton Site Plan Review
LOCATION: Hwy 65/167 and Dixon Road
ENGINEER/SURVEYOR: McGetrick & McGetrick
PLANNING JURISDICTION: Pulaski County, Little Rock Extraterritorial
Sherman Smith,PE,RLS,CFM David E. Harris, AICP Chris' Clements, CST
Public Works Director Planning Director Asst. Planning Director
Review Comments:
1. Engineer needs to sign stamp.
2. Survey must meet minimum standards.
3. Show distances with dimensions perpendicular to property lines form buildings nearest
property lines.
4. Give owner and/or use of all adjoining parcels.
5. Pulaski County commercial building setback is 40' when adjoining non-commercial
property. Please indicate owner and/or use of all adjoining property to assist in determining
setbacks.
6. Detail width and type of all drives.
7. Dimension between mini -storage buildings.
8. Need driveway permit from Pulaski County Road & Bridge.
9. Provide A.D.E.Q. clearing permit and storm water discharge permit as required.
10. Provide Storm Water Pollution Prevention Plan and erosion control plan.
11. Provide flood statement detailing community/panel number and zone designation.
12. Show edges of pavement at Dixon Road.
13. Access drive turnouts to be 25' radius.
14. Show all proposed drainage structures.
15. RV's entering Dixon Road at slow speeds. Please detail site distance and speed limit for
Dixon Road in this area.
16. Must comply with and obtain approval by Arkansas Dept. of Health for RV parks.
17. Provide proof of coordination with all utilities.
18. Verify coordination with Fire Service District.
19. Indicate Basis of Bearings and a basis for elevations (benchmark).
20. Identify all monuments, found and set during the course of the survey.
21. Perform a detailed hydraulic study. Furnish calculations to this department.
22. Is there any additional right-of-way dedication? If so, provide separate description.
23. Provide bar scale.
24. Provide traffic flow projections.
Staff Recommendations:
Staff recommends approval upon addressing these comments.
Commercial Site Plan Review
PLANNING AND DEVELOPMENT
501 WEST MARKHAM
LITTLE ROCK, AR 72201
501-340-8262
DATE: September 14, 2004
DEVELOPMENT: Hampton Site Plan Review
LOCATION: Hwy 65/167 and Dixon Road
ENGINEER/SURVEYOR: McGetrick & McGetrick
PLANNING JURISDICTION: Pulaski County, Little Rock Extraterritorial
Sherman Smith,PE,RLS,CFM David E. Harris, AICP Chris Clements, CST
Public Works Director Planning Director Asst. Planning Director
Review Comments:
1. Engineer needs to sign stamp.
2. Survey must meet minimum standards.
3. Show distances with dimensions perpendicular to property lines form buildings nearest
property lines.
4. Give owner and/or use of all adjoining parcels.
5. Pulaski County commercial building setback is 40' when adjoining non-commercial
property. Please indicate owner and/or use of all adjoining property to assist in determining
setbacks.
6. Detail width and type of all drives.
7. Dimension between mini -storage buildings.
8. Need driveway permit from Pulaski County Road & Bridge.
9. Provide A.D.E.Q. clearing permit and storm water discharge permit as required.
10. Provide Storm Water Pollution Prevention Plan and erosion control plan.
11. Provide flood statement detailing community/panel number and zone designation.
12. Show edges of pavement at Dixon Road.
13. Access drive turnouts to be 25' radius.
14. Show all proposed drainage structures.
15. RV's entering Dixon Road at slow speeds. Please detail site distance and speed limit for
Dixon Road in this area.
16. Must comply with and obtain approval by Arkansas Dept. of Health for RV parks.
17. Provide proof of coordination with all utilities.
18. Verify coordination with Fire Service District.
19. Indicate Basis of Bearings and a basis for elevations (benchmark).
20. Identify all monuments found and set during the course of the survey.
21. Perform a detailed hydraulic study. Furnish calculations to this department.
22. Is there any additional right-of-way dedication? If so, provide separate description.
23. Provide bar scale.
24. Provide traffic flow projections.
Staff Recommendations:
Staff recommends approval upon addressing these comments.
January 20, 2005
ITEM NO.: A FILE NO.: S-1457
NAME: Hampton Site Plan Review
LOCATION: Located on the Southeast corner of Dixon Road and HWY 65/167
DEVELOPER:
Dr. Reginald J. Hampton
1714 South Broadway
Little Rock, AR 72206
ENGINEER:
McGetrick and McGetrick Engineers
319 President Clinton Avenue, Suite 202
Little Rock, AR 72201
AREA: 17.91 acres
CURRENT ZONING:
PLANNING DISTRICT:
CENSUS TRACT:
NUMBER OF LOTS: 1
Not zoned
27 — Fish Creek Planning District
40.01
VARIANCES/WAIVERS REQUESTED: None requested.
FT. NEW STREET: 0
The applicant submitted a request dated September 23, 2004 requesting this
item be deferred to the December 2, 2004 Public Hearing. Staff is supportive of
this request.
PLANNING COMMISSION ACTION:
(OCTOBER 7, 2004)
The applicant was not present. There were no registered objectors present. Staff
stated the applicant had not resolved the issue related to the means of wastewater
disposal. Staff presented a recommendation the item be deferred to the December 2,
2004, Public Hearing to allow additional time to resolve the issue related to the
proposed septic system and placement.
January 20, 2005
SUBDIVISION
ITEM NO.: A
FILE NO.: S-1457
There was no further discussion of the item. The Chair entertained a motion to place
the item on the Consent Agenda for deferral. The motion carried by a vote of 9 ayes,
0 noes and 2 absent.
STAFF UPDATE:
The applicant has not resolved all the outstanding issues associated with the proposed
wastewater collection and treatment system. The applicant is requesting this item be
deferred to the January 20, 2005 Public Hearing.
PLANNING COMMISSION ACTION:
(DECEMBER 2, 2004)
Mr. Pat McGetrick was present representing the request. There were no registered
objectors present. Staff stated the applicant had not resolved all the outstanding issues
associated with the proposed wastewater collection and treatment system and
requested that the item be deferred to the January 20, 2005 Commission meeting.
There was no further discussion of the item. A motion was made to place the item on
the Consent Agenda for Deferral. The motion carried by a vote of 9 ayes, 0 noes and
2 absent.
STAFF UPDATE:
The applicant has not resolved the issues related to the wastewater collection and
treatment system proposed for the site. Staff recommends this item be withdrawn from
consideration without prejudice.
PLANNING COMMISSION ACTION:
(JANUARY 20, 2005)
Mr. Pat McGetrick was present representing the request. There were no registered
objectors present. Staff stated the applicant had not resolved the issues related to the
wastewater collection and treatment system proposed for the site. Staff presented a
recommendation the item be withdrawn from consideration without prejudice.
There was no further discussion of the item.
item on the consent agenda for withdrawal
0 no and 1 absent.
The chair entertained a motion to place the
The motion carried by a vote of 10 ayes,
4
ITEM NO.: 11
NAME: Hampton Site Plan Review
FILE NO.: S-1457
LOCATION: located on the Southeast corner of Dixon Road and HWY 65/167
Planner Staff Comments:
1. Provide notification of property owners located within 200-feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide details of the proposed wastewater collection and treatment system,
including an approval of the indicated treatment from the Arkansas Department of
Health if a septic system or a centralized collection and treatment system is to be
utilized.
3. Provide details of the proposed signage including height and area of each of the
indicated signs. Provide the height of the indicated signage located adjacent to the
interstate as measured from the elevation of the centerline of the traffic lanes to the
top of the sign structure.
4. Will there be any areas designated for outdoor storage? If so indicate the location of
the proposed storage areas along with details of the items to be placed in this area.
5. Provide the location of the proposed RV dump station.
6. Provide a detailed phasing plan on the proposed site plan.
7. Provide details of proposed screening on the site plan.
8. Provide details of any proposed fencing both interior and perimeter fencing including
the location, height and construction material.
9. The traffic flow of the development will need to be changed or the indicated spaces
rearranged to allow for ease of maneuvering.
,,-
Variance/Waivers: None requested.
Public Works:
1. Dixon Road is classified on the Master Street Plan as a minor arterial. A dedication
of right-of-way 45-feet from centerline will be required.
2. With construction, provide Public Works with design of street improvements
conforming to Master Street Plan. Construct one-half street improvement to the
street including 5-foot sidewalks with the planned development. Street widening
should be striped as a right turn lane.
3. This site is outside the corporate limits. No grading permits or storm water detention
is required per City ordinances.
Utilities and Fire Department/County Planning:
Wastewater: Outside the service boundary. No comment. Provide details of the
proposed wastewater collection and treatment system.
Entergy: Approved as submitted.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. Approval of the City of Little Rock is required
prior to service. The facilities on -site will be private. When meters are planned off
private lines, private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed to
practice in the State of Arkansas. Execution of Customer Owned Line Agreement is
required. Additional fire hydrant(s) will be required. Contact the Fire Department having
jurisdiction to obtain information regarding the required placement of the hydrant(s) and
contact Central Arkansas Water regarding procedures for installation of the hydrant(s).
This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire protection.
Contact Central Arkansas Water at 992-2434 for additional information.
Fire Department: Place fire hydrants per code. Outside the service boundary. Provide
a letter from the area volunteer fire department concerning their ability to serve the site.
Contact the Little Rock Fire Department at 918-3700 for additional information.
County Planning: (See attached comments.)
CATA: No comment received.
Planning Division:_ No comment.
Landscape: Areas set aside for landscaping appear to meet with Landscape
ordinance requirements.
An irrigation system to water landscape areas will be required.
Prior to construction, it will be necessary to provide landscape plans stamped with the
seal of a Registered Landscape Architect.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, September 22, 2004.