HomeMy WebLinkAboutS-1456 Staff AnalysisITEM NO.: 10
NAME: Big Boy's Toys Site Plan Review
FILE NO.: S-1456 cry
LOCATION: located South of Baseline Road, just East of Gator Park
A
Planning Staff Comments:
1. Provide notification of property owners located within 200-feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide the total building coverage in a general note on the proposed site plan.
3. Provide any proposed parking on the proposed site plan.
4. Provide details of any proposed signage including height/area and location on the
proposed site plan.
5. Provide details of the proposed screening on the proposed site plan. The indicated
use would require an opaque screening fence be placed around the perimeter of the
site.
6. Provide a detailed description of the area to be cleared and the area to remain
undisturbed during Phase I.
7. Each phase of the proposed development will need to be coordinated with staff prior
to construction including the review of the specifics of the proposed improvements to
individual phases.
Variance/Waivers: A variance from the Land Alteration Ordinance to allow advanced
grading on the site.
J!
Public
JW
Works:
-' 1.
Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way 55-feet from centerline will be required. The proposed
right-of-way dedication is acceptable.
2.
Provide design of street conforming to the Master Street Plan. Construct one-half
'u
street improvement to the street including 5-foot sidewalks with the planned
development.
A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading and drainage plans
CY
will need to be submitted and approved prior to the start of construction.
4.
Storm water detention ordinance applies to the property. Show the proposed
location for storm water detention facilities on the plan.
5.
Provide the direction of flow and all storm water flows (Q) entering and leaving the
�z
property. Show contours at minimum 5-foot intervals.
Driveway locations and widths do not meet the traffic access and circulation
`
requirements of Section 30-43 and 31-210. Provide driveway spacing of 150-feet
from the property boundary. The width of driveway must not exceed 36-feet.
'�. Nat Banihatti
Entrance gate design must be approved by Traffic Engineering, (501)
379-1818). Design must provide a turn -out for vehicles that d❑ not gain entrance to
ts-
the facility and provide adequate distance from the future edge of pavement for
stacking three vehicles.
Utilities and Fire Department/County Planning:
Wastewater_ Sewer main extension required, with easements, if service is
required for the project. Contact the Little Rock Wastewater Utility at 688-1414 for
additional information.
Entergy: No comment received.
Center -Point Energy_: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. Additional fire hydrant(s) will be required.
Contact the Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding procedures
for installation of the hydrant(s). This development will have minor impact on the
existing water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. Contact Central Arkansas Water at 992-2434 for
additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department
at 918-3700 for additional information.
County Planning: No comment.
CATA: No comment received.
Plannina Division: No comment.
Landscape: Areas set aside for buffers and landscaping meet with ordinance
requirements.
At least 70% of the proposed land use buffer along the southern perimeter must remain
undisturbed. All areas required to be preserved must be protected with temporary
fencing.
Unless otherwise provided for, a 6-foot high opaque fence, either a wooden fence with
its face side directed outward, a wall or dense evergreen plantings, is required along the
southern perimeter of the site.
Since this development is proposed to be built in phases, tree removal should be limited
to those areas being developed.
An irrigation system to water on -site landscaped areas along Baseline Road will be
required.
Landscape plans stamped with the seal of a Registered Landscape Architect will be
required prior to obtaining a building permit.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, September 22, 2004.
October 7, 2004
ITEM NO.- 14 FILE NO.: S-1
NAME: Big Boy's Toys Site Plan Review
LOCATION: Located South of Baseline Road, just East of Gator Park
DEVELOPE
BBTS, LLC
19712 Mallard Cove
Little Rock, AR 72210
ENGINEER:
Central Arkansas Surveying
1012 Autumn Road
Little Rock, AR 72211
AREA: 6.75 acres
CURRENT ZONING
PLANNING DISTRICT
CENSUS TRACT
NUMBER OF LOTS: 1
1-2, Light Industrial District
16 — Otter Creek
41.03
FT. NEW STREET: 0
VARIANCES/WAIVERS REQUESTED: A variance from the Land Alteration Ordinance
to allow advanced grading on the site.
A. PROPOSAL/REQUEST:
The applicant is requesting the development of this 6.75 acre site currently zoned
1-2, Light Industrial District as an "upscale" boat and RV storage facility. The
development is proposed in three phases. The first phase will include the
clearing, grading and fencing of approximately 2.0 acres in the southwest corner
of the property. This area will be used as a storage and lay down area for
construction equipment and materials. The owner/developer will construct a
temporary privacy fence along the southern property line to screen the adjacent
,R-2, Single-family district zoned properties. The developer also has indicated a
temporary access to the storage lay down area will be maintained.
1
October 7, 2004
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: S-1456
Phase 2 of the development will consist of the grading and clearing of the
remaining 4.75 acres and to construct (73) enclosed boat and RV storage units.
All paving and drainage will be constructed during the second phase. In the third
phase, the developer is proposing to remove all improvements previously
constructed in Phase I and to construct (97) enclosed boat and RV storage units,
completing the project.
The proposed storage buildings will be metal buildings, with all doorways facing
to the interior of the project. The applicant has indicated all fencing will be chain
link or ornamental iron. All driveways and entrances will be concrete or asphalt
per existing City ordinances.
B. EXISTING CONDITIONS:
The site is a vacant site with more dense vegetation located near the southern
property line. The area to the east is zoned PD-I and the area to the west is
Gator Park, zoned 1-2, Light Industrial District. The area to the south is also
vacant and currently zoned R-2, Single-family. To the north of the site is the
Arkansas Highway and Transportation Department. Other uses in the area
include residential and non-residential uses. There are single-family homes and
an open air boat and RV storage facility located to the northeast of the site,
across Baseline Road.
C. NEIGHBORHOOD COMMENTS:
Southwest Little Rock United for Progress, Town and Country Neighborhood
Association and all property owners located within 200-feet of the site were
notified of the public hearing. As of this writing staff has not received one
informational phone call from an area resident.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way 55-feet from centerline will be required. The
proposed right-of-way dedication is acceptable.
2. Provide design of street conforming to the Master Street Plan. Construct one-
half street improvement to the street including 5-foot sidewalks with the
planned development.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading and drainage plans will need to be submitted and approved prior to
the start of construction.
2
1
October 7, 2004
SUBDIVISION
ITEM NO.: 10 Cont. FILE NO.: S-1456
4. Storm water detention ordinance applies to the property. Show the proposed
location for storm water detention facilities on the plan.
5. Provide the direction of flow and all storm water flows (Q) entering and
leaving the property. Show contours at minimum 5-foot intervals.
6. Driveway locations and widths do not meet the traffic access and circulation
requirements of Section 30-43 and 31-210. Provide driveway spacing of 150-
feet from the property boundary. The width of driveway must not exceed 36-
feet.
7. Entrance gate design must be approved by Traffic Engineering, Nat Banihatti
(501) 379-1818. Design must provide a turn -out for vehicles that do not gain
entrance to the facility and provide adequate distance from the future edge of
pavement for stacking three vehicles.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact the Little Rock Wastewater Utility at 688-1414
for additional information.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. Additional fire hydrant(s) will
be required. Contact the Little :Rock Fire Department to obtain information
regarding the required placement of the hydrant(s) and contact Central Arkansas
Water regarding procedures for installation of the hydrant(s). This development
will have minor impact on the existing water distribution system. Proposed water
facilities will be sized to provide adequate pressure and fire protection. Contact
Central Arkansas Water at 992-2438 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
Countv Plannin : No comment.
CATA: No comment received.
F. 1 SSU ESITECHN ICAL/DESIGN:
Plannina Division: No comment.
3
I
October 7, 2004
SUBDIVISION
ITEM NO.: 10 Cont_ FILE NO.: S-1456
G.
Landscape: Areas set aside for buffers and landscaping meet with ordinance
requirements.
At least 70% of the proposed land use buffer along the southern perimeter must
remain undisturbed. All areas required to be preserved must be protected with
temporary fencing.
Unless otherwise provided for, a 6-foot high opaque fence, either a wooden
fence with its face side directed outward, a wall or dense evergreen plantings, is
required along the southern perimeter of the site.
Since this development is proposed to be built in phases, tree removal should be
limited to those areas being developed.
An irrigation system to water on -site landscaped areas along Baseline Road will
be required.
Landscape plans stamped with the seal of a Registered Landscape Architect will
be required prior to obtaining a building permit.
SUBDIVISION COMMITTEE COMMENT:
(September 16, 2004)
Mr. Randy Alberius was present representing the applicant. Staff presented an
overview of the request indicating the development was to be developed in three
phases. Staff stated the first phase included the advance clearing of a portion of
the site to allow for a materials "lay -down" yard for the steel to construct the first
phase of the building construction. Staff stated the developer then proposed to
construct all the hard surface areas and the buildings in the second phase of the
building construction. Staff stated screening would be required during all phases
of development.
Staff requested the applicant provide additional information concerning the
proposed signage plan. Staff stated the development would also be required an
opaque screening fence or the rear of the buildings could act as screening if
designed with no openings. Staff also stated each of the phases would need to
be coordinated with staff prior to any grading activities on the site to ensure
compliance.
Public Works comments were addressed. Staff stated the proposed
development was to be gated but the site plan did not allow for a turn -around for
vehicles entering the site and not accessing the gate. Staff also stated the
indicated drive did not allow for stacking of vehicles waiting to enter the site.
El
I
October 7, 2004
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: S-1456
Staff noted the driveway was to be a maximum of 36-feet in width and located
near the center of the property. Mr. Alberius questioned the required location of
the driveway. Staff stated if the developer moved the drive to the west and more
centered on the property frontage, staff would be supportive of the placement.
Landscaping comments were addressed. Staff stated the proposed buffers
appeared to meet the minimum ordinance requirements. Staff stated at least 70
percent of the southern perimeter buffer must remain as undisturbed and
protected with temporary fencing.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
K ANALYSIS:
The applicant submitted a revised plan to staff addressing the issues raised at
the September 16, 2004, Subdivision Committee meeting. The applicant has
indicated the driveway and turn -around as requested by staff. The applicant has
indicated a single sign will be utilized not to exceed six feet in height and sixty
square feet in sign area. The ordinance for industrially zoned properties typically
allows for a sign area not to exceed seventy-two square feet in sign area and a
maximum of thirty feet in height. The indicated signage is acceptable per the
zoning ordinance.
The applicant has indicated building screening will be utilized upon final
completion of the development. The applicant has indicated screening will be
placed along the southern property line and adjacent to properties zoned or used
as residential. The applicant has also indicated the southern buffer will remain
as undisturbed per the zoning ordinance or at least 70 percent of the area will
remain undisturbed.
The proposed development includes the placement of 40 units containing 14-feet
by 50-feet, 64 units containing 14-feet by 40-feet and 70 units containing 12-feet
by 30-feet. The proposed development includes 176 total units upon build out.
The applicant has indicated approximately 30 percent building coverage and 20
percent of the site in landscaping and open space.
The development is proposed in three phases. The first phase will include the
clearing, grading and fencing of approximately 2.0 acres in the southwest corner
of the property. This area will be used as a storage and lay down area for
construction equipment and materials. The owner/developer will construct a
temporary privacy fence along the southern property line to screen the adjacent
5
October 7, 2004
SUBDIVISION
ITEM NO.: 10(Cont.)FILE NO.: S-1455
R-2, Single-family district zoned properties. The developer also has indicated a
temporary access to the storage lay down area will be maintained. Staff is
supportive of the applicant's request but would recommend the applicant
coordinate each of the phases with staff prior to construction to ensure
compliance with existing ordinances and approvals.
Phase 2 of the development will consist of the grading and clearing of the
remaining 4.75 acres and to construct (73) enclosed boat and RV storage units.
All paving and drainage will be constructed during the second phase. The
applicant is requesting open air storage for boats and RV's in this area until the
beginning of Phase 3. In the third phase, the developer is proposing to remove
all improvements previously constructed in Phase I and to construct (97)
enclosed boat and RV storage units, completing the project. Staff is supportive
of the applicant's phasing plan.
The proposed storage units will be metal buildings, with all doorways facing to
the interior of the project. The applicant has indicated the roof material will be
constructed of a painted material to be non -reflective.
The applicant has indicated all fencing will be chain link or ornamental iron
except in areas requiring year around screening. The applicant has indicated
fence heights will not exceed fence heights allowed in industrial zones or a
maximum of eight feet in height. All driveways and entrances will be concrete or
asphalt per existing City ordinances.
Staff is supportive of the proposed site plan. To Staffs knowledge there are no
outstanding issues associated with the proposed request. The applicant has
indicated the development of the site consistent with existing ordinance
requirements with regard to building height, setback, signage and buffering. Staff
feels the proposed development should have minimal impact on adjoining
properties if developed as indicted.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the staff report.
Staff recommends each phase of development be coordinated between the
applicant and staff prior to development.
PLANNING COMMISSION ACTION: (OCTOBER 7, 2004)
The applicant was present representing the request. There were no registered
objectors present. Staff stated to their knowledge there were no outstanding issues
0
October 7, 2004
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO_: S-1456
associated with the proposed request. Staff stated they had received one informational
phone call from an area resident concerning the proposed development. Staff stated
the applicant had met the minimum ordinance requirements for a site plan review under
the current ordinance. Staff presented a recommendation of approval of the request
subject to compliance with the conditions outlined in paragraphs D, E and F of the
above report.
There was no further discussion of the item. The Chair entertained a motion to place
the item on the Consent Agenda for approval. The motion carried by a vote of 9 ayes,
0 noes and 2 absent.
7