HomeMy WebLinkAboutS-1428-B Staff AnalysisITEM NO.: 3. FILE NO.: S-1
NAME: Waters Edge Revised Preliminary Plat
LOCATION: located North of David O Dodd Road, East of 1-430.
Planning Staff Comments:
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing.
2. Provide the source of title of the landowner in the general notes section of the
proposed preliminary plat.
3. Provide the names of owners of all unplatted tracts abutting the plat area and the
names of owners of platted tracts in excess of 2 '/Z acres.
4. Provide the names of owners of any land locked parcels within or abutting the plat
area.
5. Does the applicant own the property adjacent to David O Dodd Road? If not provide
details of the plans for the street connection or temporary turn -around for the
roadway. `
Variance/Waivers:
1. A variance to allow a reduced lot depth for Lots 127, 130, 162, 165 and 214.
2. A variance to allow a reduced lot width for Lots 28, 42, 95 and 100.
3. A variance to allow an increased lot depth to width ratio for Lots 5, 199 and 200.
Public Works Conditions:
1. David O' Dodd Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required. Show existing
right-of-way for this arterial. Proposed connecting subdivision street should connect
to David O' Dodd; if not possible due to different ownership, a permanent cul-de-sac
is required on said subdivision street.
2. Indicate whether or not proposed drainage improvements parallel to David O' Dodd
are within the existing legal right-of-way.
3. Sidewalks with appropriate handicap ramps are required in accordance with Section
31-175 of the Little Rock Code and the Master Street Plan.
4. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
5. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
6. Easements are required for all storm water drainage areas.
7. With site development, provide design of street conforming to the Master Street
Plan. Construct one-half street improvement to David O' Dodd, along all locations
that abut the development, including a 5-foot sidewalk.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, if service is required for
the project. Contact Little Rock Wastewater Utility at 688-1414 for additional
information.
Enter : Approved as submitted.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capital Investment Charge based on the
size of connection(s) will apply to this project in addition to normal charges. There is an
existing 12-inch and 16-inch water main that crosses this property in an existing 20-foot-
wide waterline easement being the south 20 feet of NE 1/4 NE 1/4, Section 28, T-1-N,
R-13-W. It appears that this water main will impact several proposed lots. A water main
extension will be required in order to provide service to this property. If there are
facilities that need to be adjusted and/or relocated, contact Central Arkansas Water.
That work would be done at the expense of the developer. This development will have
minor impact on the existing water distribution system. Proposed water facilities will be
sized to provide adequate pressure and fire protection.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: No comment received.
Planning Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, September 14, 2005.
FILE NO.: S-1428-B
NAME: Waters Edge Revised Preliminary Plat
LOCATION: Located North of David O Dodd Road, East of 1-430
DEVELOPER:
H & L Properties, Inc.
505 West Dixon Road
Little Rock, AR 72209
ENGINEER:
McGetrick and McGetrick Engineers
10 Otter Creek Parkway, Suite A
Little Rock, AR 72210
AREA:71.668 acres
CURRENT ZONING:
PLANNING DISTRICT
CENSUS TRACT: 24.05
Variance/Waivers:
NUMBER OF LOTS: 227
R-2, Single-family
12 — 65th Street West
FT. NEW STREET: 9,075 LF
1. A variance to allow a reduced lot depth for Lots 127, 130, 162, 165 and 214.
2. A variance to allow a reduced lot width for Lots 28, 42, 95 and 100.
3. A variance to allow an increased lot depth to width ratio for Lots 5, 199 and 200.
BACKGROUND:
A preliminary plat was reviewed and approved for this site in October of 2003. The
applicant proposed to subdivide this 51-acre site into 165 single-family lots. The lots
average sixty-five by one hundred twenty feet or 7,800 square feet in area. The
proposed subdivision was to be developed in three phases with 60 lots in Phase I, 64
lots in Phase it and 41 lots in the final phase.
The applicant proposed the placement of 5,800 linear feet of new public street to serve
the proposed subdivision.
The proposed development required variances from the Subdivision Ordinance related
to lot depth to width ratio, minimum lot depth, minimum lot area and minimum lot width.
FILE NO.: S-1428-B (C
The applicant also proposed the placement of a common recreational facility within the
development. The lake area along with two tot lots and a neighborhood center were
proposed as a Conditional Use Permit and were approved as a separate item
(File No. Z-7473) at the Commission's October 2003, Public Hearing.
On April 22, 2004, the Planning Commission approved a different request for the
subdivision of this 51-acre site into 149 single-family lots. The lots would be developed
in two phases; with 89 lots in the first phase and 60 lots in the second phase. The
proposed preliminary plat indicated an average lot size of 75-feet by 120-feet or 9,000
square feet. The applicant indicated 5,800 linear feet of new street would be added as
a result of the development. The new street would end in a cul-de-sac and not connect
to the existing Shady Brook subdivision. The applicant indicated an emergency gate at
Shady Brook to allow access to the site if an emergency situation were to arise. The
proposed subdivision included a series of trails around the proposed lake area to allow
access of the subdivision residents to the lake area. The proposed subdivision also
included the development of tot lots and green space within the proposed development.
On July 7, 2005, the Planning Commission approved a revision request for the
proposed preliminary plat. The revision included the addition of land area to the
proposed plat. The applicant purchased additional acreage along David O' Dodd Road
to the west of the subdivision entrance. The applicant indicated the additional land area
allowed them to rework the entrance to the subdivision. The applicant indicated the
development of 156 single-family lots in three phases. The applicant indicated there
was no change to the rear of the proposed subdivision and the previous phasing plan
remained. The previously indicated playground areas, walking trails and water
amenities around the existing lake would remain as were previously proposed and
approved.
A. PROPOSAUREQUEST:
The applicant now proposes to revise the previously approved preliminary plat to
add additional land area to the proposed plat. The applicant has purchased an
additional twenty (20) acre of property located along David O' Dodd Road to the
north and to the east of 1-430. The applicant has indicated the additional land
area allows them to gain a second entrance to the subdivision. The applicant
has indicated the development of 227 single-family lots in four phases.
The applicant has indicated an average lot size of 75-feet by 120-feet or 9,000
square feet. The applicant has indicated lots will be developed with a 25-foot
front building line per the Subdivision Ordinance. The applicant is requesting a
variance to allow a reduced lot depth for Lots 127, 130, 162, 165 and 214; a
variance to allow a reduced lot width for Lots 28, 42, 95 and 100; and a variance
to allow an increased lot depth to width ratio for Lots 5, 199 and 200. The
applicant has indicated 9075 linear feet of new public street will be added as a
result of the new subdivision.
2
FILE NO.: S-1428-B (Cont.
B. EXISTING CONDITIONS:
The site is a vacant tree covered site with a large pond located near the southern
boundary of the property. The applicant has been issued a permit for
reconstruction of the levee of the pond. The applicant has indicated the existing
pond will be utilized in the proposed development as a recreational area and for
detention.
There is a single-family subdivision located to the south of the site with new
homes being constructed on Sandy Lane. There are also single-family homes
located on David O Dodd Road south of the site. A new single-family subdivision
is under development to the south of the site. The area to the north of the site is
vacant tree covered, as is the area to the east of the site. The area to the west of
the site if also vacant and tree covered with Interstate 1-430 located near the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
abutting property owners, Southwest Little Rock United for Progress and
Stagecoach Dodd Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. David O' Dodd Road is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 45 feet from centerline will be required.
Show existing right-of-way for this arterial.
2. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
4. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
5. Easements are required for all storm water drainage areas.
6. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to David O' Dodd, along
all locations that abut the development, including a 5-foot sidewalk.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING -
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
additional information.
Entergy: Approved as submitted.
3
FILE NO.: S-1428-B Cont.)
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of connection(s) will apply to this project in addition to normal
charges. There is an existing 12-inch and 16-inch water main that crosses this
property in an existing 20-foot-wide waterline easement being the south 20 feet
of NE 1/4 NE 1/4, Section 28, T-1-N, R-13-W. It appears that this water main will
impact several proposed lots. A water main extension will be required in order to
provide service to this property. If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That work would be done at
the expense of the developer. This development will have minor impact on the
existing water distribution system. Proposed water facilities will be sized to
provide adequate pressure and fire protection.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (September 8, 2005)
Mr. Pat McGetrick was present representing the request. Staff presented an
overview of the development indicating the developers had added additional area
to a site previously approved by the Commission for preliminary platting. Staff
stated there were few outstanding issues associated with the proposed request.
Staff noted a few of the variances indicated were those previously proposed in
addition to variances added with the new land area.
Staff requested Mr. McGetrick provide the source of title of the landowner in the
general notes section of the site plan in addition to the names of owners of all
platted and unplatted tracts abutting the plat area. Staff also questioned if the
development would provide a second connection to David O' Dodd Road.
Mr. McGetrick stated the development would have two access point with David
O' Dodd Road. He stated the second access connection would be made with
Phase IV of the development.
4
FILE NO.: S-1428-B (Co
Public Works comments were addressed. Staff stated street improvements and
right-of-way would be required along David O' Dodd where the development
abutted the roadway. Staff stated sidewalks would be required to meet the
current Master Street Plan requirement. Staff stated a grading permit would be
required prior to development and the storm water detention ordinance would
apply to future development. Staff stated all storm water detention facilities
should be included on the plan.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the September 8, 2005, Subdivision Committee meeting. The applicant
has indicated the second connection to David O' Dodd Road. The applicant has
also indicated additional right-of-way along David O' Dodd Road to allow
construction to a minor arterial per the Master Street Plan. The applicant has
indicated 9075 linear feet of new public street will be added as a result of the new
subdivision.
The applicant has indicated an average lot size of 75-feet by 120-feet or 9,000
square feet. The applicant has indicated lots will be developed with a 25-foot
front building line per the Subdivision Ordinance. The applicant has indicated the
development of 71.6 acres with 227 single-family lots resulting in a density of
3.1 units per acre.
The applicant is requesting a variance to allow a reduced lot depth for Lots 127,
130, 162, 165 and 214, a variance to allow a reduced lot width for Lots 28, 42, 95
and 100 and a variance to allow an increased lot depth to width ratio for Lots 5,
199 and 200. Staff is supportive of the applicant's requested variances. The
Subdivision Ordinance typically requires a minimum lot depth of 100-feet. The
applicant has indicated lot depths on the indicated lots ranging from 95-feet to
99-feet. The remainder of the lots meet or exceed the minimum 100-foot depth
requirement. The applicant has indicated a few of the lots with a minimum lot
width of 57-feet. The Subdivision Ordinance typically requires a minimum lot
width of 60-feet. Staff does not feel the reduced lot width will negatively impact
the developability of the proposed lots. The indicated lots have an increased lot
depth, which allows sufficient area for development. The applicant has also
indicated a variance request to allow an increased lot depth to width ratio for
three of the proposed lots. These lots are located adjacent to the entrance to the
subdivision and were previously approved as a variance. Staff continues to
support this variance request.
Staff is supportive of the applicant's request. The applicant has indicated the
development of 71.6 acres with 227 new single-family homes. The applicant is
FILE NO.: S-1428-B Cont.
proposing an overall density of 3.1 units per acre consistent with single-family
development per the City's Future Land Use designation. The applicant has
indicated a pond within the development to serve as detention and an amenity for
the residents. The proposed subdivision will include tot lots, a fishing pier and
trail around the pond to serve as green space for the development.
To staffs knowledge, there are no outstanding issues associated with the
proposed request and staff feels if the development is constructed as proposed
there should be minimal impact on the adjoining properties.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above agenda staff report.
Staff recommends approval of the requested variance to allow a reduced lot
depth for Lots 127, 130, 162, 165 and 214.
Staff recommends approval of the requested variance to allow a reduced lot
width for Lots 28, 42, 95 and 100.
Staff recommends approval of the requested variance to allow an indreased lot
depth to width ratio for Lots 5, 199 and 200.
PLANNING COMMISSION ACTION: (SEPTEMBER 29, 2005)
The applicant was present representing the requests. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs D, E and F of
the agenda staff report. Staff also presented recommendations of approval for the
requested variance to allow a reduced lot depth for Lots 127, 130, 162, 165 and 214,
the requested variance to allow a reduced lot width for Lots 28, 42, 95 and 100 and the
requested variance to allow an increased lot depth to width ratio for Lots 5, 199 and
200.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for approval. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
n.
September 29, 2005
ITEM NO.: 3 FILE NO.: S-1428-B
NAME: Waters Edge Revised Preliminary Plat
LOCATION: Located North of David O Dodd Road, East of 1-430
DEVELOPER:
H & L Properties, Inc.
505 West Dixon Road
Little Rock, AR 72209
ENGINEER:
McGetrick and McGetrick Engineers
10 Otter Creek Parkway, Suite A
Little Rock, AR 72210
AREA:71.668 acres
CURRENT ZONING:
PLANNING DISTRICT:
CENSUS TRACT: 24.05
NUMBER OF LOTS: 227
R-2, Single-family
12 — 65th Street West
FT. NEW STREET: 9,075 LF
Variance/Waivers:
1. A variance to allow a reduced lot depth for Lots 127, 130, 162, 165 and 214.
2. A variance to allow a reduced lot width for Lots 28, 42, 95 and 100.
3. A variance to allow an increased lot depth to width ratio for Lots 5, 199 and 200.
BACKGROUND:
A preliminary plat was reviewed and approved for this site in October of 2003. The
applicant proposed to subdivide this 51-acre site into 165 single-family lots. The lots
average sixty-five by one hundred twenty feet or 7,800 square feet in area. The
proposed subdivision was to be developed in three phases with 60 lots in Phase I, 64
lots in Phase II and 41 lots in the final phase.
The applicant proposed the placement of 5,800 linear feet of new public street to serve
the proposed subdivision.
The proposed development required variances from the Subdivision Ordinance related
to lot depth to width ratio, minimum lot depth, minimum lot area and minimum lot width.
September 29, 2005
SUBDIVISION
ITEM NO.: 3 Cont. FILE NO.: S-1428-B
The applicant also proposed the placement of a common recreational facility within the
development. The lake area along with two tot lots and a neighborhood center were
proposed as a Conditional Use Permit and were approved as a separate item
(File No. Z-7473) at the Commission's October 2003, Public Hearing.
On April 22, 2004, the Planning Commission approved a different request for the
subdivision of this 51-acre site into 149 single-family lots. The lots would be developed
in two phases; with 89 lots in the first phase and 60 lots in the second phase. The
proposed preliminary plat indicated an average lot size of 75-feet by 120-feet or 9,000
square feet. The applicant indicated 5,800 linear feet of new street would be added as
a result of the development. The new street would end in a cul-de-sac and not connect
to the existing Shady Brook subdivision. The applicant indicated an emergency gate at
Shady Brook to allow access to the site if an emergency situation were to arise. The
proposed subdivision included a series of trails around the proposed lake area to allow
access of the subdivision residents to the lake area. The proposed subdivision also
included the development of tot lots and green space within the proposed development.
On July 7, 2005, the Planning Commission approved a revision request for the
proposed preliminary plat. The revision included the addition of land area to the
proposed plat. The applicant purchased additional acreage along David O' Dodd Road
to the west of the subdivision entrance. The applicant indicated the additional land area
allowed them to rework the entrance to the subdivision. The applicant indicated the
development of 156 single-family lots in three phases. The applicant indicated there
was no change to the rear of the proposed subdivision and the previous phasing plan
remained. The previously indicated playground areas, walking trails and water
amenities around the existing lake would remain as were previously proposed and
approved.
A. PROPOSALIREQUEST:
The applicant now proposes to revise the previously approved preliminary plat to
add additional land area to the proposed plat. The applicant has purchased an
additional twenty (20) acre of property located along David O' Dodd Road to the
north and to the east of 1-430. The applicant has indicated the additional land
area allows them to gain a second entrance to the subdivision. The applicant
has indicated the development of 227 single-family lots in four phases.
The applicant has indicated an average lot size of 75-feet by 120-feet or 9,000
square feet. The applicant has indicated lots will be developed with a 25-foot
front building line per the Subdivision Ordinance. The applicant is requesting a
variance to allow a reduced lot depth for Lots 127, 130, 162, 165 and 214; a
variance to allow a reduced lot width for Lots 28, 42, 95 and 100; and a variance
to allow an increased lot depth to width ratio for Lots 5, 199 and 200. The
applicant has indicated 9075 linear feet of new public street will be added as a
result of the new subdivision.
2
September 29, 2005
SUBDIVISION
ITEM NO.: 3(Cont.)FILE NO.: S-1428-B
B. EXISTING CONDITIONS:
The site is a vacant tree covered site with a large pond located near the southern
boundary of the property. The applicant has been issued a permit for
reconstruction of the levee of the pond. The applicant has indicated the existing
pond will be utilized in the proposed development as a recreational area and for
detention.
There is a single-family subdivision located to the south of the site with new
homes being constructed on Sandy Lane. There are also single-family homes
located on David O Dodd Road south of the site. A new single-family subdivision
is under development to the south of the site. The area to the north of the site is
vacant tree covered, as is the area to the east of the site. The area to the west of
the site if also vacant and tree covered with Interstate 1-430 located near the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
abutting property owners, Southwest Little Rock :United for Progress and
Stagecoach Dodd Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS -
Public Works Conditions:
1. David O' Dodd Road is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 45 feet from centerline will be required.
Show existing right-of-way for this arterial.
2. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
4. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
5. Easements are required for all storm water drainage areas.
6. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to David O' Dodd, along
all locations that abut the development, including a 5-foot sidewalk.
E. UTILITIES AND FIRE DEPARTMENTICOUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
3
September 29, 2005
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: S-1428-B
additional information.
Enter : Approved as submitted.
Center -Point Ener : Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of connection(s) will apply to this project in addition to normal
charges. There is an existing 12-inch and 16-inch water main that crosses this
property in an existing 20-foot-wide waterline easement being the south 20 feet
of NE 1/4 NE 1/4, Section 28, T-1-N, R-13-W. It appears that this water main will
impact several proposed lots. A water main extension will be required in order to
provide service to this property. If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That work would be done at
the expense of the developer. This development will have minor impact on the
existing water distribution system. Proposed water facilities will be sized to
provide adequate pressure and fire protection.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSU ES/TECH N ICAUDESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT:
(September 8, 2005)
Mr. Pat McGetrick was present representing the request. Staff presented an
overview of the development indicating the developers had added additional area
to a site previously approved by the Commission for preliminary platting. Staff
stated there were few outstanding issues associated with the proposed request.
Staff noted a few of the variances indicated were those previously proposed in
addition to variances added with the new land area.
Staff requested Mr. McGetrick provide the source of title of the landowner in the
general notes section of the site plan in addition to the names of owners of all
CI
September 29, 2005
SUBDIVISION
ITEM NO.: 3 Cont.) FILE NO.: S-1428-B
platted and unplatted tracts abutting the plat area. Staff also questioned if the
development would provide a second connection to David O' Dodd Road.
Mr. McGetrick stated the development would have two access point with David
O' Dodd Road. He stated the second access connection would be made with
Phase IV of the development.
Public Works comments were addressed. Staff stated street improvements and
right-of-way would be required along David O' Dodd where the development
abutted the roadway. Staff stated sidewalks would be required to meet the
current Master Street Plan requirement. Staff stated a grading permit would be
required prior to development and the storm water detention ordinance would
apply to future development. Staff stated all storm water detention facilities
should be included on the plan.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the September 8, 2005, Subdivision Committee meeting. The applicant
has indicated the second connection to David O' Dodd Road. The applicant has
also indicated additional right-of-way along David O' Dodd Road to allow
construction to a minor arterial per the Master Street Plan. The applicant has
indicated 9075 linear feet of new public street will be added as a result of the new
subdivision.
The applicant has indicated an average lot size of 75-feet by 120-feet or 9,000
square feet. The applicant has indicated lots will be developed with a 25-foot
front building line per the Subdivision Ordinance. The applicant has indicated the
development of 71.6 acres with 227 single-family lots resulting in a density of
3.1 units per acre.
The applicant is requesting a variance to allow a reduced lot depth for Lots 127,
130, 162, 165 and 214, a variance to allow a reduced lot width for Lots 28, 42, 95
and 100 and a variance to allow an increased lot depth to width ratio for Lots 5,
199 and 200. Staff is supportive of the applicant's requested variances. The
Subdivision Ordinance typically requires a minimum lot depth of 100-feet. The
applicant has indicated lot depths on the indicated lots ranging from 95-feet to
99-feet. The remainder of the lots meet or exceed the minimum 100-foot depth
requirement. The applicant has indicated a few of the lots with a minimum lot
width of 57-feet. The Subdivision Ordinance typically requires a minimum lot
width of 60-feet. Staff does not feel the reduced lot width will negatively impact
5
September 29, 2005
SUBDIVISION
ITEM NO.: 3 (Cont.
FILE NO.: S-1428-B
the developability of the proposed lots. The indicated lots have an increased lot
depth, which allows sufficient area for development. The applicant has also
indicated a variance request to allow an increased lot depth to width ratio for
three of the proposed lots. These lots are located adjacent to the entrance to the
subdivision and were previously approved as a variance. Staff continues to
support this variance request.
Staff is supportive of the applicant's request. The applicant has indicated the
development of 71.6 acres with 227 new single-family homes. The applicant is
proposing an overall density of 3.1 units per acre consistent with single-family
development per the City's Future Land Use designation. The applicant has
indicated a pond within the development to serve as detention and an amenity for
the residents. The proposed subdivision will include tot lots, a fishing pier and
trail around the pond to serve as green space for the development.
To staff's knowledge, there are no outstanding issues associated with the
proposed request and staff feels if the development is constructed as proposed
there should be minimal impact on the adjoining properties.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above agenda staff report.
Staff recommends approval of the requested variance to allow a reduced lot
depth for Lots 127, 130, 162, 165 and 214.
Staff recommends approval of the requested variance to allow a reduced lot
width for Lots 28, 42, 95 and 100.
Staff recommends approval of the requested variance to allow an increased lot
depth to width ratio for Lots 5, 199 and 200.
PLANNING COMMISSION ACTION:
(SEPTEMBER 29, 2005)
The applicant was present representing the requests. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs D, E and F of
the agenda staff report. Staff also presented recommendations of approval for the
requested variance to allow a reduced lot depth for Lots 127, 130, 162, 165 and 214,
the requested variance to allow a reduced lot width for Lots 28, 42, 95 and 100 and the
requested variance to allow an increased lot depth to width ratio for Lots 5, 199 and
200.
0
September 29, 2005
SUBDIVISION
ITEM NO.: 3 (Cont.
FILE NO.: S-1428-B
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for approval. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
7