HomeMy WebLinkAboutS-1426-D ApplicationCIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
NAME —COLONEL GLENN PLAZA LOOP EXTENSION
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date:
ADDRESSING SPECIALIST'S REPORT
I have r iewed the plat and find that the street names and street configuration are acceptable.
Addressing Specialist Date: �r 7— l0
TRAFFIC ENGINEER aPORT
I have reviewed the plat and find that: 5 ��
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage and street lights.
Indicate the number of street signs ordered for this plat for billing to developer
Certain improvements remain uncompleted and a punch list has been prepared and sent.
cry. Traffic Engineer Date:_
Et Gtti G
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied.
\4. 1 Civil Engineer I/II Date: 30,9 //`'tf
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All requirements for final plat approval have been satisfied.
,ter Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied. q
� A `ram Date: 7 ht-1
Design Review Engineer/Civil Engineering Manager
April 26, 2010
�—
1.gs Ore -- ... Dr Lan --I uee lH — We
r
Ap A
4 g�g
9
9 4
8�
go
ZIP
F
a IL
12 0 F,g
.
:sgg
_
ce
Sa3
6
gBa
0
6®
s /
FF ®M � I
3- A�
R h��7J11
dk° MDR FlnalMmt1_o_f The Holloway Firm. Inc.
ft�jchecked: ROH �A(p15C( Gfann PfA79 I..f.T.� �%CE!}6lOn
p ENVIRONMENTAL AND CIVIL DESIGN
E.
as/1d�zdld Cco of G:t[�13 R4e14 Pule6Sd COIFITij, 11C.
€or, Glum Rfdgo Crone, l 4 C 200 C..er Drire (50 it B51—BBO
ecele: Meude]le, Arkeneee 72113
096—T5B (I09) ElTEL snw— •at c.enn ann..�__.uL� •i•••
2ni JO AaaaO 002 ;140
NOI53O 'IIAIO ONV 1VIN3NNU8IAN3 u01"OV3 d0a, VZVU &RANI] I7WOM HOU MOM -.
Wl IWAIA AOMO11OH gql 1 40 wu IFUIA !, P_ i. .. iLdeoN :Aa e.o
I
� 5
y
45
r -nii
YE...
0 0.
i^3
� a•3E
e.
r
r`3
lip
g $
ES
R e
.EE
jY4
�
e
N
E
3r$
�S6
�Q¢
5Ey
3E�
L
��E
�f'-
bMs-
M.
;r
:e
�8
James, Donna
From: Mark Redder <mark@hoIloway-eng.com>
Sent: Wednesday, July 23, 2014 6:45 AM
To: jim.boyd@lrwu.com; daniel.tull@carkw.com; joni.bates@centerpointenergy.com;
'THOMPSON, THEODIS'; 'GURLEY, JOHN CURTIS'
Cc: 'Brian Carney'; James, Donna; Floriani, Vince; Charles, Nathan
Subject: Colonel Glenn Plaza Loop Road Dedication Plat
Attachments: Final Plat ROW Dedication 07-23-14.pdf
All,
Please find attached Final Plat for this roadway, as you may know construction has been complete for some time and it
is now the desire of the developer to dedicate the street which requires it to be platted.
Please indicate your approval of this plat by replying to all on this email.
Thanks, Mark
Mark Redder
VP Civil Design
Holloway Engineering
200 Casey Drive
Maumelle, Arkansas 72113
1-501-851-3366 Office
1-501-851-3368 Fax
1-501-765-0099 Cell
James, Donna
From: GURLEY, JOHN CURTIS <JG0866@att.com>
Sent: Wednesday, July 23, 2014 12:47 PM
To: Mark Redder; jim.boyd@lrwu.com; daniel.tull@carkw.com;
joni.bates@centerpointenergy.com; 'THOMPSON, THEODIS'
Cc: 'Brian Carney'; James, Donna; Floriani, Vince; Charles, Nathan
Subject: RE: Colonel Glenn Plaza Loop Road Dedication Plat
Attachments: Final Plat ROW Dedication 07-23-14.pdf
Hi Mark,
ATT approves of the final plat in the attached file for Colonel Glenn Plaza Loop.
From: Mark Redder [ma iIto: mark@holloway-eng,corn]
Sent: Wednesday, July 23, 2014 6:45 AM
To: ilm.boyd(&lrwu.com; daniel.tyll@carkw.com; joni.bates@centerpointenergy_.cam; 'THOMPSON, THEODIS'; GURLEY,
JOHN CURTIS
Cc: 'Brian Carney'; 'James, Donna'; 'Floriani, Vince'; ncharlescalittlerock.org
Subject: Colonel Glenn Plaza Loop Road Dedication Plat
All,
Please find attached Final Plat for this roadway, as you may know construction has been complete for some time and it
is now the desire of the developer to dedicate the street which requires it to be platted.
Please indicate your approval of this plat by replying to all on this email.
Thanks, Mark
Mark Redder
VP Civil Design
Holloway Engineering
200 Casey Drive
Maumelle, Arkansas 72113
1-501-851-3366 Office
1-501-851-3368 Fax
1-501-765-0099 Cell
The 9followay (Firm, Inc.
Civil and Environmental Design
Robert D. Holloway
Prof. Engineer Registration
Arkansas Mississippi
Louisiana Alabama
Prof Land Surveyor Registration
Arkansas
February 4, 2010
Donna James
Subdivision Administrator
City of Little Rock Planning and Development
723 West Markham Street
Little Rock, Arkansas 72201-1334
200 Casey Drive
Maumelle, AR 72113
♦
Telephone
(501) 851-8806
(501) 851-3366
Facsimile
(501) 851-3368
E-Mail
hollowayfirm@sbcglobal.net
RE: Final Plat of Colonel Glenn Plaza Loop Extension, Little Rock, Pulaski County,
Arkansas
Dear Ms. James,
Please find attached a copy of the Final Plat for the above -referenced project. I am in the
process of sending this via email to all of the utility entities. Once everyone has signed
off on this project, I will be sending the original along with the Bill of Assurance for your
signature.
Respectfully,
ortf-t), I
ENGINEERING 4 DESIGN ♦ SURVEY/MAPPING
}@@@¢@L
9�
_.III —_—
a e `_ J
. ch, d
h N
s /
I
I
C
i
I 0
Yd i 91 lit Yss1 - g : 5 :� Pv
�r
=SAF i R§
d.d by: MDR dac revalena 1nt.
Final Flat of The Holloway Firm, Inc.
Checked: ROM Cokm Glenn p(pa Lo6p ExwWon
data: oa/lomo pf Me Rork N19811 County, /r, ENVIRONMENTAL AND CIVIL DESIGN
scale: for. Glann Rklgo GraeelNg, LLG Maq .iuY �k:l;aaa 72113 (501) 851-880
IF &
den H�Vl1. O.e�[.i�w�0. gn�ea[ion prq
axs or: MDR n.e. �eri�>on� inx-
checkee: RGH Ca(orwi c("n"� L- Ex[a�afan me Holloway Firm. Inc.
p ENVIRONMENTAL AND CIVIL GESIGN
0ee9:05/10/MtO my of I U40 Rack, Pull CAtltFty, Ar.
eee�e: for. GUrm gWgeCraae(ng, LLC. �eC„:° 0rkeneee n[ia (501) B51-BBO
En tergy
November 11, 2014
SAAD Development Corporation
James G. Saad
3601 Spring Hill Business Park Suite 200
Mobile, AL 36608
Entergy Arkansas, Inc
Right of way — Arkansas Transmission Grid
5115 Thihault Road
Little Rock, Ar 72206
Phone (501) 490-5655 FAX (501) 490-4754
RE: Plans submitted for approval to construct Industrial Parkway & Access Road to
FedEx Package Warehouse,", ithin Entergy Right of Way located in close proximity to
Structure # 394 thru 398 Line # 936.4, 115KV Mabelvale EHV — L.R. South #2, Pulaski
County, Little Rock, Arkansas.
Mr. Saad:
Entergy Arkansas, Tnc. ("EAI") Transmission Department has received plans submitted
by White-Daters and Associates, Inc. for SAAD Development Corporation ("'Grantee") to
include the construction of a Cut-off Road extension. Upon review of the plans, attached hereto
and made apart hereof as Exhibit "A" & Exhibit "A-1", it was determined that a main access
drive and some areas of Industrial Parkway will be constructed within EAI Right of Way. EAI
has no objection to your use of the right of way contingent on the approval and acceptance of the
following terms and conditions:
1. It is understood and agreed that the wires supported by structures on the Entergy
right of way are conductors of, and at all times have in them, high voltage electricity. No person,
or object in contact with a person, may touch or be near to said wires or other fixtures on said
structures, because to do so or to permit such would be dangerous to the life of the party so
doing, as well as anyone else in the area where such occurred. You agree to inform each and
every individual of such facts before such party enters upon any part of the easement area above
described during the time such work is being prepared, done or completed, or any equipment
moved to, upon or from said property and Entergy shall be indemnified by you from any injury
or death resulting therefrom in accordance with the terms of the indemnity agreement set forth in
this letter.
2. The height of any and all equipment used within EAi's right of way, or any
extension of same by Grantee, shall at all times comply with all applicable regulations,
including, without limitation, the OSHA regulations. Grantee acknowledges that the height
of EAI's lines varies depending upon weather and/or load conditions so that Grantee will be
required to monitor (watch and observe) the height of said lines throughout Grantee's
operations. Additionally, if the height of Grantee's equipment or any extension thereof, or
part thereof, can possibly be raised to a height above the maximum allowed by applicable
regulations, such equipment shall be provided with guard chains or other devices limiting
movable parts of the equipment to the maximum height provided by all applicable
regulations and no equipment will be operated or permitted upon said right of way that does
not comply herewith. Grantee recognizes specifically that EAI has no obligation to see that
2
November 11, 2014
James G. Saad
Grantee, its employees, contractors, subcontractors and their employees or agents, are
complying herewith.
3. Entergy, its successors and assigns, retains the right and full use of said
premises for any and all purposes, including the right to overhang said area with conductors,
poles, guy wires and other facilities.
4. Grantee agrees to at all times indemnify and hold harmless EAI, its agents,
servants or employees, from and against any and all claims, demands, causes of action,
judgments, liabilities and expenses of every nature, including attorney's fees, resulting by reason
of personal injury, death (including but not limited to injuries and death to employees of EAI and
Grantee's employees) or damage to any property which arises out of, results from, or is in any
manner related to, directly or indirectly, any operations or acts hereunder, or to the exercise of
Grantee's rights hereunder, or to Grantee's presence upon or use of the property above referred
to, or to the use or existence of Grantee's facilities on such premises. The indemnity provisions
of this paragraph shall not apply if any such injury, death, damage, liability claim or cause of
action is caused by the sole negligence of EAI, its employees, agents or representatives,
5. EAI makes no warranty, express or implied, as to its title to said easement and
the permission herein given is subject to all prior grants reservations, encumbrances, occupancy
and crossing agreements, if any, whether made by EAI or others and whether or not of record.
Grantee hereby expressively releases, and agrees to indemnify, EAI respecting any claims, suits,
or disputes arising out of the title and related matters concerning the subject easement.
6. Grantee agrees, by the execution hereof, to notify EAI's representative, Mr.
Monty Harrell, (501) 490-4712, forty-eight (48) hours before beginning Grantee's construction
and forty-eight (48) hours after completion; and Grantee further agrees that Grantee's failure to
timely give such notice or notices shall at EAI's option, cause a charge to be due and payable to
EAI by Grantee, covering costs incurred by EAl for salaries, travel expenses and contingencies
of EAI's employees who are dispatched to Grantee's job site on EAI's easement for unscheduled
inspection, recording and reporting of Grantee's work activities, and Grantee agrees to pay all
such charges upon being billed therefor.
7. Grantee agrees to provide and maintain proper and effective protection for EAI's
existing and future facilities so as to prevent any damage which may be caused by Grantee's use
of said premises and to promptly reimburse EAI for any damage it or its facilities may sustain.
8. Entergy's property is to be used for only purposes disclosed to Entergy and no
buildings or components of buildings, tents, or light poles of any kind, permanent or temporary,
are to be located or protruding into the right of way. No waste dumpsters, dirt piles, equipment,
construction material, or trash piles are to be loaded, unloaded, placed or stored under the line
conductors or within the Right of Way at any time. No fence, trees, or other landscaping will be
placed within the right of way. No changes to Grade shall take place which may reduce the
ground to conductor clearances of the electrical facilities. Upon termination of the use of the
Entergy Right -of -Way, Grantee or its contractors shall return the property to as near as practical
to its pre -use condition.
Page 2 of 4
3
November 11, 2014
James G. Saad
9, Entergy will have frill use of all of its property at any time for repairs and/or work
on power lines and structures as needed. In the event of an emergency, grantee shall immediately
take whatever means necessary to provide Entergy with safe access to its facilities. Entergy will
not be held responsible for any damages resulting from the ingress to and egress of Entergy
equipment, trucks, cranes, etc.
10. Grantee agrees to reimburse Entergy for costs of repairs, adjustments and/or loss
of revenue for all damages resulting from the loss of electrical or communications services to
Entergy's customers arising from the construction, maintenance, use and/or removal of the road
extension and its proposed adjoining facilities.
11. Grantee will bear all costs to alter or adjust any Entergy electrical transmission
and/or communication facilities that might be required in the construction, operation, and
maintenance of the road within the Entergy right of way. Entergy must review and approve any
request that would involve electrical and/or communications line alterations.
12. Within sixty (60) days after construction and completion of the Facilities, you
shall furnish to Entergy three copies of an "as built" survey, showing the exact location of the
Road and final grade with respect to Entergy's Right -of -Way and the electric transmission line
support structures.
13. Any facilities below ground, within the right of way, shall be installed to a depth
that ensures at least forty-eight inches of minimum cover over the top of the line. All water,
sewer, drainage, and gas Lines shall be marked by highly visible markers.
14. By accepting this agreement or by exercising any rights hereunder, Grantee
warrants to EAI that the officer, agent or representative of Grantee executing this agreement on
behalf of Grantee had and has the authority to bind Grantee to the terms of this agreement and
that this agreement is a valid, binding agreement of Grantee enforceable against Grantee in
accordance with its terms,
Please indicate acceptance of the above listed items by executing this agreement and
returning an original documents to rne. Failure to return the executed document will render this
letter null and void, Please address original to me at 5115 Thibault Rd., Little Rock, Ar 72206,
I may be reached at (501) 490-4749, should there be any additional questions.
Siftlrel Y..
r
V
Jett'. Henry
Co6tract Transmissian Right of Way Agent
Entergy Arkansas, Inc
Page 3 of 4
a
November 11, 2014
James G. Saad
Accepted this
By:
1
---day of ,rV '7V. , 2014
James G. Saad, it m�w-4#4- (.-t7-v - (..,j�: L
SAAD Development Corporation
Page 4 of 4
2014066088 Received: 1-1i7/2014 10:5:3:10 AN'
Recorded: 11t07/2014 10:58:33 AAA Fi,ed &
Recorded in Official Records of Larry Crane,
PULASKI COU!V7Y CIRCUIi!COUMTY CLERK
Fees $25.00
Bill of Assurance
For The Final Plat of Colonel Glenn Plaza Loop Extension,
Little Rock, Pulaski County, Arkansas
WHEREAS, Glenn Ridge Crossings, 1I is the Owner of the following described
property Final Plat of Colonel Glenn Plaza Loop Extension to the City of Little Rock,
Arkansas, and desire to plat said Roadway Right -of -Way:
LEGAL DESCRIPTION
Lands lying in the SW 1/4 and in the NW 1/4 all in Section 21, T-1-N, R-13-W, Little
Rock, Pulaski County, Arkansas more particularly described as follows:
Commencing at the SE Corner of the SW 1/4, Section 21; thence North 00 degrees 00
minutes 00 seconds East 459.41 feet; thence North 90 degrees 00 minutes 00 seconds
West 395.00 feet to the point of beginning which is also on the south right-of-way of
Colonel Glenn Plaza Loop; thence North 87 degrees 41 minutes 59 seconds West 209.21
feet; thence along a 24.9115 degree curve to the right 367.66 feet to a point having a
chord bearing and distance of North 42 degrees 25 minutes 29 seconds West 329.75 feet;
thence North 03 degrees 22 minutes 12 seconds East 73.88 feet; thence along a 24.9115
degree curve to the right 95.42 feet to a point having a chord bearing and distance of
North 15 degrees 15 minutes 19 seconds East 94.74 feet; thence North 27 degrees 08
minutes 25 seconds East 625.40 feet; thence along a 114.5930 degree curve to the left
81.16 feet to a point having a chord bearing and distance of North 19 degrees 21 minutes
33 seconds West 72.54 feet; thence South 65 degrees 51 minutes 32 seconds East 160.22
feet; thence along a 114.5930 degree curve to the left 75.93 feet to a point having a chord
bearing and distance of South 70 degrees 38 minutes 27 seconds West 68.84 feet; thence
South 27 degrees 08 minutes 25 seconds West 633.78 feet; thence along a 33.7038 degree
curve to the left 70.52 feet to a point having a chord bearing and distance of South 15
degrees 15 minutes 19 seconds West 70.02 feet; thence South 03 degrees 22 minutes 12
seconds West 73.88 feet; thence along a 33.7038 degree curve to the left 270.55 feet to a
point having a chord bearing and distance of South 42 degrees 13 minutes 24 seconds
East 242.89 feet; thence South 87 degrees 42 minutes 06 seconds East 210.99 feet; thence
South 02 degrees 20 minutes 26 seconds West 60.00 feet to the point of beginning
containing 1.906 acres more or less.
NOW THEREFORE, WITNESSETH:
That we, the said Glenn Ridge Crossings, II hereinafter termed Grantor, have
cause said tract of land to be surveyed by Robert D. Holloway, Professional Engineer,
and a plat thereof made which is identified by the title Final Plat of Colonel Glenn Plaza
Loop Extension, Little Rock, Pulaski County, Arkansas and the date i i�. and by the
signature of the said engineer and the grantors, and bears a Certificate of Approval
executed by the Little Rock Planning Commission, and is on record in the Office of the
Circuit Clerk and ex-officio Recorder of Pulaski County, Arkansas in Plat Book
Page and the grantors do hereby make this Bill of Assurance.
The grantors do hereby certify that they have replatted said real estate in
accordance with said plat. The lands embraced in said plat shall be forever known as
designated on said plat; and every deed of conveyance for said property shall use this
designation.
The filing of this Bill of Assurance and Plat for record in the Office of the Circuit
Clerk and ex-officio Recorder of Pulaski County shall be a valid and complete delivery
and dedication of the streets and easements shown on the said Plat.
All buildings constructed on said lots shall be constructed no nearer to the street
than the building line shown on the Plat, and all buildings shall be constructed in
conformance with the Building Code and Zoning Ordinance of the City of Little Rock,
Arkansas.
WITNESS, our hands this i day of
Hc'iJly'Vd3dL�i'y'P:_'�1s'ii..-:'..
f'n�UlrBS} �yt�$ {✓I�?J �l l,i'7 Yi:•'�:i..•.:i'�.';.. , i...� .".",.'.,:-
� rr
A- v 2014.
By: 1 �- 0. C� , Y0,01tctz �
Glenn Ridge Crossings, II
I Hickory Creek Circle
4,U- Little Rock, AR 72212
ACKNOWLEDGMENT
STATE OF ARKANSAS)
COUNTY OF PULASKI)
BE IT REMEMBERED that on this day came before me a Notary Public within and for
the County and State aforesaid, the
undersigned - tj I.,ar
executed the foregoing Bill of ssurance.
My Commission Expires:issrOhl
o Ue �,oanei2orsA�; m =_
aQw
ov g�a
�/,qZ Te ��V
and stated that they had
otary Public
City of Little Rock
Planning and Development
Filing Fees
Date 4N 20
Annexation
Board of Adjustment
Cond Use Permit/T U P
Final Plat
Planned Unit Dev
Preliminaiy Plat
Special Use Permit
Rezoning
Site Plans
Sti eet Name Change
Street Name Signs
Number at ea
Public Hearing Signs
Number at ea
Total
File No
Location:E&aiKZE64i&*.
Applicant
By