HomeMy WebLinkAboutS-1409 Staff AnalysisITEM NO-: 7 FILE NO.: S-1409
NAME: Madison Valley Subdivision Preliminary Plat
LOCATION: west of Montgomery Road, south of Taylor Loop Road
Plannina Staff Comments:
1. Provide notification of abutting property owners of the site, complete with the certified
abstract list, notice form with affidavit executed and proof of mailing.
2. Provide the name/address of the landowner along with the source of title.
3. As proposed Lots 1, 16, 35, 43 and 50 will require a waiver of the minimum required width
for a corner lot.
4. Provide the names of recorded subdivision abutting the plat area.
5. Provide the names of owners of all unplatted tracts abutting the plat area and the names of
owners of platted tracts in excess of 2'/ acres.
6. Provide the zoning classification of the plat area along the with zoning classes of abutting
lands.
Variance/Waivers:
1. None requested. — A variance to allow Lots 1, 16, 35, 43 and 50 to develop with a reduced
lot width for a corner lot.
Public Works:
1. The proposed right-of-way dedication and boundary street improvements meet Master
Street Plan requirements.
2. Align Gavin Court and Hanna Lane.
3. A grading permit is accordance with Section 29-186 (c) and (d) will be required prior to any
land clearing or grading activities at the site. Site grading and drainage plans will need to be r�
submitted and approved prior to the start of construction.
4. Storm water detention ordinance applies to this property as shown on the plans. The storm
drain on Montgomery Road should also be routed to the detention pond.
5. Provide the direction of flow and all storm water flows (Q) entering and leaving the property.
Show also the down -stream receiving stream or ditch.
Utilities and Fire DepartmentlCaunty Planning:
Wastewater. Sewer main extension required, with easements, if servidd is required for t4
project. Contact the Little Rock Wastewater Utility at 688-1414 for additional details.
Entergy: Approved as submitted.
�Lc Center -Point Energy: Approved as submitted.��s
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. A water main extension will be required in order to
provide service to this property. A Capital Investment Charge based on the size of the meter
connection(s) will apply to this project in addition to normal charges. This development will have
minor impact on the existing water distribution system. Proposed water facilities will be sized to
provide adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department at
918-3752 for additional details.
County Planning: No comment received.
CATA: No comment received.
Planning Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, November 12, 2003.
December 4, 2003
ITEM NO.: 7
NAME: Madison Valley Subdivision Preliminary Plat
LOCATION: west of Montgomery Road, south of Taylor Loop Road
DEVELOPER:
Card Investment, LLC
12418 Cantrell Road
Little Rock, AR 72223.
ENGINEER:
McGetrick and McGetrick Engineers
319 President Clinton Avenue, Suite 202
Little Rock, AR 72201
AREA: 19.2 acres NUMBER OF LOTS: 75
CURRENT ZONING: R-2, Single-family
PLANNING DISTRICT: 19 - Chenal
ENSUS TRACT: 42.11
FILE NO.: S-1409
FT. NEW STREET: 2,850 LF
VARIAN C ESMAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant is proposing the subdivision of this 19.2 acres into 75 single-family
lots. The applicant has indicated the average lot size as 65-feet by 110-feet;
7150 square feet. The proposed development will add 2850 linear feet of new
street to the City. The development includes 'h street construction to
December 4, 2003
SUBDIVISION
ITEM NO.: 7 Cont. FILE NO.: S-1409
Montgomery Road adjacent to the site and the construction of three new
residential streets.
The applicant is requesting a portion of Montgomery Road right-of-way be
abandoned. The area to the south is owned by Chenal Properties and the
preliminary design of a proposed development does not indicate access to
Montgomery Road.
B. EXISTING CONDITIONS:
The site contains a scattering of homes along Montgomery Road on acreage.
The Baptist Church property is located east of the site with the church owning
most of the land adjoining the eastern boundary of the plat. The area to the west
contains homes located on five plus acre tracts accessed by Carter Lane. To the
north of the site along Taylor Loop Road is the Montessori School campus.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents
concerning the proposed development. The Westchester/Heatherbrae
Neighborhood Association and the Charleston Heights Neighborhood
Association and all abutting property owners of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. The proposed right-of-way dedication and boundary street improvements
meet Master Street Plan requirements.
2. Align Gavin Court and Hanna Lane.
3. A grading permit is accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading and drainage plans will need to be submitted and approved prior to
the start of construction.
4. Storm water detention ordinance applies to this property as shown on the
plans. The storm drain on Montgomery Road should also be routed to the
detention pond.
5. Provide the direction of flow and all storm water flows (Q) entering and
leaving the property. Show also the down -stream receiving stream or ditch.
2
December 4, 2003
SUBDIVISION
ITEM NO.: 7 Cont. FILE NO.: S-1409
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact the Little Rock Wastewater Utility at 688-1414
for additional details.
Enteray: Approved as submitted.
Center -Point Energy: Approved as submitted.
SBC: A ten foot easement is required adjacent to all proposed roadways.
Contact SBC at 373-5112 for additional details.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A water main extension will be
required in order to provide service to this property. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. Contact Central Arkansas Water at 992-
2438 for additional details.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3752 for additional details.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (November 6, 2003)
Mr. Pat McGetrick was present representing the request. Staff presented an
overview of the proposed request indicating the proposed plat would require a
variance for the development of the corner lots. Staff noted corner lots must be
at least 75-feet in width to accommodate the side yard setback requirements.
Mr. McGetrick stated he was revising the plan and would address this issue.
3
December 4, 2003
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: S-1409
Staff also noted the applicant should provide the names of owners of unplatted
tracts abutting the plat area and the names of recorded subdivision abutting the
plat area. Staff also requested Mr. McGetrick provide on the plat the zoning
classification within the plat area and of abutting lands.
Public Works comments were addressed. Staff noted storm water detention was
a concern. Staff requested directional flows and all storm water flows be
provided for water entering and leaving the site. Staff also requested the down-
stream receiving stream or ditch be identified.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the November 6, 2003 Subdivision Committee meeting. The applicant
has indicated all corner lots to be a minimum of 75-feet in width to meet the
minimum requirement of the Subdivision Ordinance [Section 31-232(e)]. The
applicant has indicated the names of owners of abutting parcels and indicated
there are no recorded subdivisions abutting the parcel. The applicant has
indicated the zoning classification of the plat area as R-2, single-family as are the
adjoining properties.
The applicant has indicated storm water detention on the proposed preliminary
plat. The applicant has indicated Tract A as a detention area Staff feels the
proposed detention is adequate to serve the proposed development.
The applicant has realigned Hanna Lane and Gavin Court on the proposed
preliminary plat. The applicant has also indicated a portion of Montgomery Road
will be abandoned. Staff supports the abandonment of this section of roadway.
Staff would recommend however the roadway not be abandoned until the
applicant is ready to final plat the affected lot (Lot 66).
The applicant has indicated the average lot size to be 7,150 square feet and the
lots are proposed as 65-feet by 110-feet. The proposed lots are adequate to
meet the minimum requirements of the Subdivision Ordinance. Staff is
supportive of the proposed lots as presented.
Staff is supportive of the proposed request. The applicant has met the minimum
requirements of the Subdivision Ordinance with regard to minimum lot size,
minimum lot widths and depths. To Staffs knowledge there are no outstanding
issues associated with the proposed request.
4
December 4, 2003
SUBDIVISION
ITEM NO.: 7 (Cont.) _ FILE NO.: S-1409
STAFF RECOMMENDATION:
Staff recommends approval of the request as filed subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
Staff recommends approval of the request to abandon a portion of Montgomery
Road near the southern perimeter of the plat. Staff would recommend the right-
of-way not be abandoned until development is imminent.
PLANNING COMMISSION ACTION: (DECEMBER 4, 2003)
Mr. Pat McGetrick was present representing the request. There were no registered
objectors present. Staff presented a recommendation of approval of the request as filed
subject to compliance with the conditions outlined in paragraphs D, E and F of the
above report.
Staff recommended the area north of Gavin Court be labeled as a tract and provision for
maintenance of this tract be specified in the Bill of Assurance for the proposed
subdivision through a Property Owners Association. Staff recommended the applicant
provide access to the land located parcel located to the north of Gavin Court as well.
Staff recommended approval of the request to abandon a portion of Montgomery Road
near the southern perimeter of the plat. Staff stated they would recommend the right-of-
way not be abandoned until development was imminent.
There was no further discussion of the item. The item was placed on the consent
agenda for approval. The motion carried by a vote of 11 ayes, 0 noes and 0 absent.
5