HomeMy WebLinkAboutS-1407-A Staff AnalysisFILE NO.: S-14
NAME: Oxford Point Subdivision Preliminary Plat
LOCATION: Located South of 57th Street between Hopson Street and Larch Place
DEVELOPER:
Allied Bank — Lex Golden
1002 West Capitol Avenue
Little Rock, AR 72201
ENGINEER:
McGetrick and McGetrick Engineers
10 Otter creek Court, Suite A
Little Rock, AR 72210
AREA: 4.714 acres
CURRENT ZONING
PLANNING DISTRICT:
CENSUS TRACT
NUMBER OF LOTS: 19
R-2, Single-family
13 — 65th Street East
21.02
VARIAN C ESNVAIVERS REQUESTED
Lots 9 and 10.
BACKGROUND:
FT. NEW STREET: 540 LF
A variance to allow double frontage lots for
On December 4, 2003, the Little Rock Planning Commission approved a preliminary
plat for this site. Per Section 31-94(e) a preliminary plat approved by the Little Rock
Planning Commission shall be effective and binding upon the Commission for two (2)
years from the date of approval or as long as work is actively progressing, at the end of
which time the final plat application for the subdivision must have been submitted to the
planning staff. Any plat not receiving final approval within the period of time set forth
herein or otherwise conforming to the requirements of the ordinance shall be null and
void, and the developer shall be required to submit a new plat of the property for
preliminary approval subject to all zoning restrictions and the subdivision ordinance.
The approved preliminary plat has expired and the owners are now proposing to
reestablish the previously approved plat.
FILE NO.: S-1407-A (Cont.
A. PROPOSAL/REQUEST:
The development consists of 4.714 acres, located on West 57th Street, two
blocks east of Geyer Springs Road. The property is currently zoned R-2, Single-
family and the applicant proposes to subdivide this tract into a 19 lot single-family
subdivision. The proposed development will add 540 linear feet of new street
and end in a cul-de-sac taking no access to West 59th Street. The development
will be constructed in one phase.
The applicant has indicated a platted building line of 25-feet along the street
property line as required by the City of Little Rock Subdivision Ordinance Section
31-256. The applicant has also indicated a 25-foot platted building line alonq�
with a 10-foot restricted access easement for the two lots adjacent to West 57t
Street. The applicant is requesting a variance from the Subdivision Ordinance
[Section 31-232(d)] to allow two (2) of the nineteen lots to develop as double
frontage lots (Lots 9 and 10). The applicant has indicated a ten foot restricted
access easement to ensure no vehicle access will be allowed on West 59th
Street, to limit the number of curb cuts on West 57th Street.
B. EXISTING CONDITIONS:
The northern portion of the site is vacant and the southern portion has two
homes located along West 59th Street. There is a large church located northwest
of the site and single-family homes located along West 57th Street to the
northeast. There is a newly developed single-family subdivision located on the
north side of West 57th Street at Freeland. South of the site is a C-3 zoned
parcel containing a mobile home -park. The areas to the east and west are
developed with single-family homes.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents
concerning the proposed development. The Geyer Springs Neighborhood
Association, the Wakefield Neighborhood Association, Southwest United for
Progress and all abutting property owners were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
2. Prepare a letter of pending development addressing streetlights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpott) for more information regarding streetlight
2
FILE NO.: S-1407-A
requirements.
3. The proposed detention pond must empty into a drainage easement or an
existing or proposed ditch.
4. With site development, provide the design of the streets conforming to the
Master Street Plan. Construct one-half street improvement to 57th Street and
59th Street including a 5-foot sidewalk with the planned development.
5. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
6. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
7. Oxford Run Court appears to be constructed beyond the Master Street Plan
standard for a minor residential street.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements. Contact the Little
Rock Wastewater Utility at 688-1414 for additional information.
Enteray: No comment received.
Center -Point Energy: Approved as submitted.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. A water main extension will be required in order to provide
service to this property. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. iSSUES/TECHNICALIDESIGN:
Planning Division: No comment.
Landscape: No comment.
3
FILE NO.: S-1407-A (Cont-
G. SUBDIVISION COMMITTEE COMMENT: (November 16, 2006)
Mr. Pat McGetrick was present representing the applicant. Staff presented an
overview of the proposed preliminary plat indicating there were additional items
needed to be shown on the proposed preliminary plat.
Staff requested the applicant provide a phasing plan, if applicable. Staff also
requested the applicant provide a 10-toot restrictive access easement along
West 57th Street for Lots 1 and 19 and Lots 9 and 10 along West 59th Street.
Staff also noted Lots 9 and 10 would result in a variance; the creation of double
frontage lots. Mr. McGetrick stated he would verify right-of-way for West 59th
Street. He stated he did not think right-of-way for West 59th Street was in place
for the entire length.
Public Works comments were addressed. Staff stated Oxford Run Court should
have a minimum street width of 24-feet.
Comments from Central Arkansas Water, the Fire Department and Wastewater
were noted. Mr. McGetrick stated their comments would be addressed as well.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the November 16, 2006, Subdivision Committee meeting. The
applicant has indicated a minimum street width of 24-feet. The a�plicant has
also indicated a 10-foot restrictive access easement along West 57t Street and
West 59th Street. The restrictive access easement along West 57th Street will
limit the driveway to Oxford Run Court. The applicant has indicated right-of-way
for West 59th Street is in place along Lots 9 and 10. A variance from the
Subdivision Ordinance to allow the creation of double frontage lots [Section 31-
232(d)] is being requested. The applicant has indicated a restrictive access
easement along the rear of the proposed lots. Staff is supportive of the
requested variance to allow the creation of double frontage lots as proposed.
The applicant is proposing an average lot size of sixty -feet (60) by one hundred
forty-three (143) feet or 8,580 square feet. The proposed lot size is more than
adequate to meet the minimum requirements of the Subdivision Ordinance (a
minimum of sixty (60) feet by one hundred (100) feet and a minimum of
7000 square feet). Staff is supportive of the proposed lot size and configuration.
The applicant has indicated detention on the proposed plat (contained within Lot
9) and has identified the detention basin area. The applicant has not however
indicated the detention basin and outfall line as an easement. Staff recommends
the applicant more clearly show and label the detention basin and appropriate
easements. Staff feels the size of Lot 9 will more than adequately handle the
0
FILE NO.: S-1407-A Cont.
detention basin along with all required easements and allow sufficient room for
future construction.
The applicant has indicated the development will be constructed in one stage or
phase. All street work and infrastructure will be placed prior to final platting.
Staff is supportive of the proposed phasing plan of the development.
To Staffs knowledge there are no outstanding issues associated with the
proposed request.
STAFF RECOMMENDATION:
Staff recommends approval of the request as filed subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
Staff recommends approval of the requested variance from the Subdivision
Ordinance to allow the creation of double frontage lots for Lots 9 and 10.
Staff recommends the applicant clearly label the detention area and appropriate
easements.
PLANNING COMMISSION ACTION: (DECEMBER 7, 2006)
The applicant was present. Staff presented the item with a recommendation of approval
of the request subject to compliance with the comments and conditions as outlined in
paragraphs D, E and F of the above agenda staff report. Staff presented a
recommendation of approval of the requested variance from the Subdivision Ordinance
to allow the creation of double frontage lots for Lots 9 and 10. Staff also presented a
recommendation the applicant clearly label the detention area and appropriate
easements.
There was no further discussion of the item. The Chair entertained a motion for
placement of the item on the Consent Agenda for approval. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
5
December 7, 2006
ITEM NO.: 2 FILE NO.: S-1407-A
NAME: Oxford Point Subdivision Preliminary Plat
LOCATION: Located South of 57t" Street between Hopson Street and Larch Place
DEVELOPER:
Allied Bank — Lex Golden
1002 West Capitol Avenue
Little Rock, AR 72201
ENGINEER:
McGetrick and McGetrick Engineers
10 Otter creek Court; Suite A
Little Rock, AR 72210
AREA: 4.714 acres
CURRENT ZONING:
PLANNING DISTRICT
CENSUS TRACT:
NUMBER OF LOTS: 19
R-2, Single-family
13 - 65t" Street East
21.02
FT. NEW STREET: 540 LF
VARIANCESMIAIVERS REQUESTED: A variance to allow double frontage lots for
Lots 9 and 10.
BACKGROUND:
On December 4, 2003, the Little Rock Planning Commission approved a preliminary
plat for this site. Per Section 31-94(e) a preliminary plat approved by the Little Rock
Planning Commission shall be effective and binding upon the Commission for two (2)
years from the date of approval or as long as work is actively progressing, at the end of
which time the final plat application for the subdivision must have been submitted to the
planning staff. Any plat not receiving final approval within the period of time set forth
herein or otherwise conforming to the requirements of the ordinance shall be null and
void, and the developer shall be required to submit a new plat of the property for
preliminary approval subject to all zoning restrictions and the subdivision ordinance.
The approved preliminary plat has expired and the owners are now proposing to
reestablish the previously approved plat.
December 7, 2006
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-1407-A
A. PROPOSAL/REQUEST:
The development consists of 4.714 acres, located on West 57th Street, two
blocks east of Geyer Springs Road. The property is currently zoned R-2, Single-
family and the applicant proposes to subdivide this tract into a 19 lot single-family
subdivision. The proposed development will add 540 linear feet of new street
and end in a cul-de-sac taking no access to West 59th Street. The development
will be constructed in one phase.
The applicant has indicated a platted building line of 25-feet along the street
property line as required by the City of Little Rock Subdivision Ordinance Section
31-256. The applicant has also. indicated a 25-foot platted building line along
with a 10-foot restricted access easement for the two lots adjacent to West 57t
Street, The applicant is requesting a variance from the Subdivision Ordinance
[Section 31-232(d)] to allow two (2) of the nineteen lots to develop as double
frontage lots (Lots 9 and 10). The applicant has indicated a ten foot restricted
access. easement to ensure. no vehicle access will be allowed on West 59tn
Street, to limit the number of curb cuts on West 57th Street.
B. EXISTING CONDITIONS:
The northern portion of the site is vacant and the southern portion has two
homes located along :West 59th. Street. There is a large church located northwest
of the, site .and single-family homes located along West 57th Street to the
northeast. There is a newly developed single-family subdivision located on the
north side of West .57th Street at Freeland.. South of the site is a C-3 zoned
parcel containing a mobile home -park. The areas to the east and west are
developed with single-family homes.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents
concerning the proposed development. The Geyer Springs Neighborhood
Association, the Wakefield Neighborhood Association, Southwest United for
Progress and all abutting property owners were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1 _ A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
2
December 7, 2006
SUBDIVISION
ITEM NO.: 2 Cont.) FILE NO.: 5-1407-A
2. Prepare a letter of pending development addressing streetlights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpott) for more information regarding streetlight
requirements.
3. The proposed detention pond must empty into a drainage easement or an
existing or proposed ditch.
4. With site development, provide the design of the streets conforming to the
Master Street Plan. Construct one-half street improvement to 57th Street and
59th Street including a 5-foot sidewalk with the planned development.
5. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
6. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
7. Oxford Run Court appears to be constructed beyond the Master Street Plan
standard for a minor residential street.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: ; Sewer main extension required, with easements. Contact the Little
Rock Wastewater Utility at 688-1414 for additional information.
Entercy: No comment received:
Center -Point Enerq Approved as submitted.
AT & T: No comment received.
Central Arkansas Water: Ail Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. A water main extension will be required in order to provide
service to this property. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAUDESiGN:
3
December 7, 2006
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-1407-A
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (November 16, 2006)
Mr. Pat McGetrick was present representing the applicant. Staff presented an
overview of the proposed preliminary plat indicating there were additional items
needed to be shown on the proposed preliminary plat.
Staff requested the applicant provide a phasing plan, if applicable. Staff also
requested the applicant provide a 10-foot restrictive access easement along
West 57th Street for Lots 1 and 19 and Lots 9 and 10 along West 59th Street.
Staff also noted Lots 9 and 10 would result in a variance; the creation of double
frontage lots. Mr. McGetrick stated he would verify right-of-way for West 59th
Street. He stated he did not think right-of-way for West 59th Street was in place
for the entire length. .
Public Works comments were addressed. Staff stated Oxford Run Court should
have a minimum street width of 24-feet.
Comments from Central Arkansas Water, the Fire Department and Wastewater
were noted.. Mr. McGetrick stated their comments would be addressed as well.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H.: ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the November 16, 2006, Subdivision Committee meeting. The
applicant has indicated a minimum street width of 24-feet. The a�plicant has
also indicated a 10-foot restrictive access easement along West 57t Street and
West 59th Street. The restrictive access easement along West 57th Street will
limit the driveway to Oxford Run Court. The applicant has indicated right-of-way
for West 59th Street is in place along Lots 9 and 10. A variance from the
Subdivision Ordinance to allow the creation of double frontage lots [Section 31-
232(d)] is being requested. The applicant has indicated a restrictive access
easement along the rear of the proposed lots. Staff is supportive of the
requested variance to allow the creation of double frontage lots as proposed.
The applicant is proposing an average lot size of sixty -feet (60) by one hundred
forty-three (143) feet or 8,580 square feet. The proposed lot size is more than
adequate to meet the minimum requirements of the Subdivision Ordinance (a
51
December 7, 2006
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: 5-1407-A
adequate to meet the minimum requirements of the Subdivision Ordinance (a
minimum of sixty (60) feet by one hundred (100) feet and a minimum of
7000 square feet). Staff is supportive of the proposed lot size and configuration.
The applicant has indicated detention on the proposed plat (contained within Lot
9) and has identified the detention basin area. The applicant has not however
indicated the detention basin and outfall line as an easement. Staff recommends
the applicant more clearly show and label the detention basin and appropriate
easements. Staff feels the size of Lot 9 will more than adequately handle the
detention basin along with all required easements and allow sufficient room for
future construction.
The applicant has indicated the development will be constructed in one stage or
phase. All street work and infrastructure will be placed prior to final platting.
Staff is supportive of the proposed phasing plan of the development.
To Staffs knowledge there are no outstanding issues associated with the
proposed request.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request as filed subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
Staff recommends approval of the requested variance from the Subdivision
Ordinance to allow the creation of double frontage lots for Lots 9 and 10.
Staff recommends the applicant clearly label the detention area and appropriate
easements.
PLANNING COMMISSION ACTION: (DECEMBER 7, 2006)
The applicant was present. Staff presented the item with a recommendation of approval
of the request subject to compliance with the comments and conditions as outlined in
paragraphs D, E and F of the above agenda staff report. Staff presented a
recommendation of approval of the requested variance from the Subdivision Ordinance
to allow the creation of double frontage lots for Lots 9 and 10. Staff also presented a
recommendation the applicant clearly label the detention area and appropriate
easements.
There was no further discussion of the item. The Chair entertained a motion for
placement of the item on the Consent Agenda for approval. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
5
ITEM NO.: 2.
NAME: Oxford Point Subdivision Preliminary Plat
S-1407-A
LOCATION: located South of 57th Street between Hopson Street and Larch Place
Planning Staff Comments:
Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than November 22, 2006. The Office of Planning and
Development must receive the proof of notice no later than November 30, 2006.
VarianceMaivers: A variance to allow double frontage lots.
Public Works Conditions:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
2. Prepare a letter of pending development addressing streetlights as required by
Section 31-403 of the Little Rock code. Contact Traffic Engineering at (501) 379-
1813 (Steve Philpott) for more information regarding streetlight requirements.
3. Proposed detention pond must empty into a drainage easement or an existing or
proposed ditch.
4. With site development, provide the design of streets conforming to the Master Street
Plan. Construct one-half street improvement to 57th Street and 59th Street including
a 5-foot sidewalk with the planned development.
5. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
6. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1817 (Derrick Bergfield).
7. Oxford Run Court appears to be constructed beyond the Master Street Plan
standard for a minor residential street.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements. Contact the Little
Rock Wastewater Utility at 688-1414 for additional information.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
Item # 2
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. A Capital Investment Charge based on
the size of the meter connection(s) will apply to this project in addition to normal
charges. A water main extension will be required in order to provide service to this
property. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department
for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division: No comment.
Landscape: No comment.
Revised pl_atlplan_ Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, November 22, 2006.
Item # 2