HomeMy WebLinkAboutS-1405 Staff AnalysisITEM NO
3
FILE NO.: S-1405
NAME: Chenal Parkway— Highway 10 Commercial Preliminary Plat
LOCATION: Southwest Corner of Cantrell Road and Chenal Parkway
Plannina Staff Comments:
1. Provide notification of abutting property owners of the site, complete with the certified
abstract list, notice form with affidavit executed and proof of mailing.
2. Provide the preliminary storm drainage analysis (data to be provided for all water courses
entering and leaving the plat boundary).
3. Provide the preliminary storm drainage plan (typical ditch section required to be shown).
4. Provide the names of owners of all abutting lands.
5. Redesign the drive extending from Cantrell Road to Northfiled Drive to not allow a "straight -
shot". Staff has concerns with cut -through traffic utilizing this drive to avoid the intersection
of Cantrell Road and Chenal Parkway.
6. Provide the zoning classifications of the plat boundary as well as abutting zones.
7. Provide a phasing plan, if applicable.
8. Provide a no right -of -vehicle access on proposed Lots 8 and 9 to Northfiled Drive.
Variance/Waivers: �� �� ��� t -����� �}�,.,.•r��
1. None requested.,,.
Public Works:
�L) Cantrell Road and Chenal Parkway are classified on the Master Street Plan as principal
arterials. A minimum dedication of right-of-way 55 feet from centerline will be required. At
OLt,�,�a intersections, additional right-of-way may be needed to accommodate turn lanes.
2. Provide design of street conforming to the Master Street Plan. Construct one-half street
improvement to the streets including 5-foot sidewalks with the planned development. Traffic
Engineering comments are as follows:
Construct a right -turn lane on Cantrell Road (400-feet long with 200-foot taper),
Construct corner island for south-west corner of Cantrell Road and Chenal Parkway
Construct southbound right -turn lane on Chenal Parkway at Northfield Drive,
Construct corner island at Chenal Parkway and Northfield Drive
3. Plans of all work in the right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering
at (501) 379-1817 (Derrick Bergfield).
4. Obtain permits for improvements within the State Highway right-of-way from AHTH, District
VI.
5. A grading permit in accordance with Section 29-186(c) and (d) will be required prior to any
land clearing or grading activities at the site. Site grading and drainage plans will need to be
submitted and approved prior to the start of construction.
6. Storm water detention ordinance applies to this property. Indicate whether regional or
individual detention is to be provided.
7. Striping and signage plans for both public and private streets should be forwarded to Public
Works, Traffic Engineering for approval with the site development package.
8. Driveway locations and widths do not meet the'spacing criteria of Section 30-43 and 31-210.
It is recommended that only one driveway be constructed on Cantrell Road and all lots take
access from the access easement, or spacing from the intersection be changed to a 300-
foot minimum.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, if service is required for the
project. Contact Little Rock Wastewater Utility at 688-1414 for additional details.
Entergy: Approved as submitted.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. A water main extension will be required in order to
provide service to this property. This development will have minor impact on the existing water
distribution system. Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department: Place fire hydrants per code
918-3752 for additional details.
County_Planning: No comment received.
CATA: No comment received.
Planning Division: No comment.
Landscape: No comment.
Contact the Little Rock Fire Department at
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, November 12, 2003.
December 4, 2003
t Oct)
ITEM NO.: 3 FILE NO.: xT405
NAME: Chenal Parkway— Highway 10 Commercial Preliminary Plat
LOCATION: on the southwest corner of Cantrell Road and Chenal Parkway
DEVELOPER:
Highway 10 — Chenal Parkway LLC
425 West Capitol Avenue, Suite 300
Little Rock, AR 72201
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 21.9 acres NUMBER OF LOTS: 8 FT. NEW STREET: 0
CURRENT ZONING: C-3, with conditions - Site Plan Review
PLANNING DISTRICT: 19 - Chenal
CENSUS TRACT: 42.11
VARIANCESMAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The Little Rock Board of Directors adopted Ordinance No. 15,603 on December
20, 1988, rezoning the parcel and requiring a zoning site plan review of any
future development. The site is currently zoned C-3, with conditions. The
applicant proposes to subdivide this 21.9-acre tract into 9 non-residential lots.
December 4, 2003
SUBDIVISION
ITEM NO.: 3 FILE NO.: Z-1405
The proposed lots average 2.74 acres. Seven of the proposed nine lots range in
size from 0.97 acres to 2.30 acres. Lot 9 is proposed to contain 10.49 acres.
The applicant is proposing the placement of a sixty -foot access and utility
easement service drive within the development to limit the number of curb -cuts
onto the City streets. There are two accesses onto Cantrell Road, each being full
intersections. The applicant has indicated access along the proposed lot lines.
The developer will construct all improvements to Chenal Parkway when the first
lot or drive to Chenal is constructed and similarly will construct all required
improvements to Cantrell Road when the first lot or drive is constructed. The
applicant has indicated final platting will be take place as individual lots are sold
and/or developed. The applicant is also requesting consideration for lots to be
combined if necessary with the stipulation that there will be no more than nine
lots and the minimum lot size will not drop below the minimum lot size for C-3
zoned property.
B. EXISTING CONDITIONS:
The site is a vacant tree covered site sloping from north to south. The site
across Chenal Parkway is currently wooded and was recently approved for
development as a large-scale retail development. As a separate item on this
agenda an out parcel of the retail site is being considered for rezoning to remove
the condition of a site plan review prior to development (Item #15 — File No. Z-
5097-E).
South of the site is Northfield Drive with vacant 0-2 zoned property on the south
side of the roadway. Southeast of the site is a vacant tract also zoned 0-2.
West of the site and adjacent to Cantrell Road is a tract of C-3 zoned property
currently being used as a single-family home site. Adjacent to Northfield Drive to
the west is undeveloped R-2 zoned property.
North of the site are developed and undeveloped zoned parcels of commercial
and office zoned property. A Texco is located on the northwest corner and a
mini -warehouse development is located on the northeast corner of Cantrell Road
and Chenal Parkway.
C. NEIGHBORHOOD COMMENTS:
As' of this writing, staff has received several informational phone calls concerning
the proposed development. The DuQuesnne Property Owners Association, the
Margeaux Property Owners Association, the Aberdeen Court Property Owners
Association and the Bayonne Property Owners Association and all property
owners abutting the proposed development were notified of the public hearing.
2
December 4, 2003
SUBDIVISION
ITEM NO.: 3 FILE NO.: Z-1405
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Cantrell Road and Chenal Parkway are classified on the Master Street Plan
as principal arterials. A minimum dedication of right-of-way 55 feet from
centerline will be required. At intersections, additional right-of-way may be
needed to accommodate turn lanes.
2. Provide design of street conforming to the Master Street Plan. Construct one-
half street improvement to the streets including 5-foot sidewalks with the
planned development. Traffic Engineering comments are as follows:
- Construct a right -turn lane on Cantrell Road (400-feet long with 200-
foot taper)
- Construct corner island for south-west corner of Cantrell Road and
Chenal Parkway
- Construct southbound right -turn lane on Chenal Parkway at Northfield
Drive
- Construct corner island at Chenal Parkway and Northfield Drive
3. Plans of all work in the right-of-way shall be submitted for approval prior to
start of work. Obtain barricade permit prior to doing any work in the right-of-
way from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
4. Obtain permits for improvements within the State Highway right-of-way from
AHTH, District VI.
5. A grading permit in accordance with Section 29-186(c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading and drainage plans will need to be submitted and approved prior to
the start of construction.
6. Storm water detention ordinance applies to this property. Indicate whether
regional or individual detention is to be provided.
7. Striping and signage plans for both public and private streets should be
forwarded to Public Works, Traffic Engineering for approval with the site
development package.
8. Driveway locations and widths do not meet the spacing criteria of Section 30-
43 and 31-210. It is recommended that only one driveway be constructed on
Cantrell Road and all lots take access from the access easement, or spacing
from the intersection be changed to a 300-foot minimum.
3
December 4, 2003
SUBDIVISION
ITEM NO.: 3 FILE NO.:
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
additional details.
Entergy: Approved as submitted.
Center -Point Energy: Approved as submitted.
SBC: Approved as submitted. Locate all utilities before excavating or digging.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. A water main extension will be
required in order to provide service to this property. This development will have
minor impact on the existing water distribution system. Proposed water facilities will
be sized to provide adequate pressure and fire protection. Contact Central
Arkansas Water at 992-2438 for additional details.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3752 for additional details.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (November 6, 2003)
Mr. Joe White and Mr. Tim Daters were present representing the request. Staff
presented an overview of the proposed development indicating there were some
concerns with the access drive extending from Chenal Parkway to Northfield
Drive. Mr. Daters stated the development was proposing the placement of two
drives onto Chenal Parkway both of which were right -in and right -out only drives
and only one full access driveway onto Cantrell Road. Staff stated even so there
were still concerns with traffic cutting through the development to access the
future traffic light at Chenal Parkway and Northfield Drive. Staff also noted the
4
December 4, 2003
SUBDIVISION
ITEM NO.: 3 FILE NO.: Z-
driveway spacing did not meet the criteria established by the Master Street Plan
or the Subdivision Ordinance. Mr. Daters stated he would work with Public
Works staff to resolve this issue.
Staff also requested additional information concerning the street improvements.
Mr. Daters stated the street improvements would be constructed to the roadways
when a lot abutting the road was developed. Mr. Daters also stated the lots
would be final platted as each individual lot was sold.
Public Works comments were addressed. Staff noted a grading permit would be
required prior to any land clearing or grading activities at the site. Staff also
noted storm water detention ordinance would apply to the property.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the November 6, 2003 Subdivision Committee meeting. The applicant
has also indicated shared driveway locations for Lots 1, 2 and 3 abutting Cantrell
Road and shared drives between Lots 4 and 5 and 6 and 7 to limit the number of
curb cuts on Chenal Parkway. Proposed Lot 8 is to be served by a 60-foot
Access and Utility Easement extending from Cantrell Road to Northfield Drive.
The applicant has indicated the eastern most drive along Cantrell Road the
minimum required distance from the intersection of Chenal Parkway. Section 31-
210 (e)(1) states "a lot will require seven hundred fifty feet of frontage for two
drives, if the lot is adjacent to an intersecting collector street or street of a higher
classification. The site has approximately 670 feet of frontage but staff feels the
placement of two drives should have minimal to no impact on adjoining
properties and traffic flow in the area.
The applicant has revised the proposed preliminary plat to address staffs
concerns with regard to the cut -through traffic. As per Section 31-210(g)(6)
"service drives shall not connect in direct line to public streets, so as to provide
short cuts or alternate street flows". The current placement of the drive does not
provide a cut -through from Cantrell Road to Northfield Drive.
The site is currently zoned C-3 with conditions (zoning site plan review). The site
is also located in the Highway 10 Design Overlay District. The proposed lots
meet the minimum lot area requirement for C-3 zoned property (14,000 square
feet) as required per the Subdivision Ordinance and they meet the minimum lot
size requirement for the Highway 10 Design Overlay District (a minimum of two
acres). Staff is supportive of the proposed lot layout and size.
5
December 4, 2003
SUBDIVISION
ITEM NO.: 3 (Cont.
FILE NO.: Z-1405
The applicant has indicated a one hundred foot building line adjacent to Cantrell
Road and a fifty foot building line adjacent to Chenal Parkway. The one hundred
foot building line for Cantrell Road meets the minimum requirement for the
Highway 10 Design Overlay District. The proposed fifty foot building line along
Chenal Parkway is more than adequate to meet the minimum requirement for
commercially zoned property.
The applicant has indicated street construction will be phased with the final
platting of the lots. The applicant has indicated when one of the lots abutting
Cantrell Road is final platted the entire road frontage will be constructed. The
applicant has indicated the same is true for the frontage along Chenal Parkway.
Staff is supportive of the request to phase the street improvements in this
manner.
Per the Master Street Plan right -turn lanes are required at major intersections.
The applicant will be required to dedicate additional right-of-way on both Chenal
Parkway and Cantrell Road to allow the right -turn lanes to be installed. The
proposed preliminary plat does not indicate the required right-of-way to allow for
the right -turn lane construction.
To staffs knowledge there are no outstanding issues associated with the
proposed request. The applicant has meet the minimum requirements of the
Subdivision Ordinance as well as the minimum requirements of the Highway 10
Design Overlay District.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
Staff recommends the applicant indicated required right-of-way along Chenal
Parkway and Cantrell Road for the right -turn lane.
PLANNING COMMISSION ACTION:
(DECEMBER 4, 2003)
Mr. Joe White was present representing the request. There were no registered
objectors present. Staff presented a recommendation of approval of the request subject
to compliance with the conditions outlined in paragraphs D, E and F of the above report.
Staff also presented a recommendation the applicant indicate the required right-of-way
along Chenal Parkway and Cantrell Road for the right -turn lane.
There was no further discussion of the item. The item was placed on the consent
agenda for approval. The motion carried by a vote of 11 ayes, 0 noes and 0 absent.
C-1