Loading...
HomeMy WebLinkAboutS-1405 Map 5CERTIFICATE OF PRELIMINARY SURVEYING ACCURACY I, Paul M. White, hereby certify that this plat correctly represents a bound- ary survey made of verified by me that surveying requirments of the State of Arkansas and City of Little Rock Sub- division Rules and Regulations hove bee complied with and a copy of said boundary has been duly filed for record in offices of the State Surveryor and the Pulaski County Circuit Clerk on 20 , in Plat Book -Page vuw u, �nc�uuun uu, m. • ,e ymvc,cv w„ Surveryor No.� 1281, Arkansas ARKANSAS STATE PLANE COORDINATES NORTH ZONE CERTIFICATE OF PRELIMINARY N 17436834 E 1164660.30 _ fnd. AHTD noil ENGINEERING ACCURACY N 17433262 E 1184839.13 set 112`-iron pin__ I, Timothy E. Daters, hereby certify ® N 17427904 E 1164978.67 fnd AHTD R/W marker that this plat correctly represents a ® N 17424630 E 1165265.32 set 1/2"iron pin_- plot made by me, and that engineering 0 __N, 117417196 E _1165331.80 set 1/2" Iron. pin_ requirements of the Little Rock 0 N 17407018 E 1165337.98 --set 1/2"_Iron pin Sudhavi been with. isi cRlegulations have e//SS`rA T E �Q F -�- -- 4�� A R A NrS A S NDate of Execution Timothy E. Daters 0 • • • Z, Registered Professional RE G I S T E R E D Engineer No. 5033, Arkansa PROFESSIONAL ENGINEER CERTIFICATE OF PRELIMINARY PLAT APPROVAL ,t ►r • Uj t11 No.5033 All requirements of the Little Rock Subdivision Rules and Regulations r relative to the preparation and E. submittal of a preliminary plat having been fulfilled, approval of this plat is hereby granted, subject to further provision of said Rules and Regulations >n - This certificate shall expire. ARKANSAS STATE HWY 10 Date of Execution Planning Administrator JOE T. ItasINSON THIS SITE MIGH SCHOOL OWNER OR DEVELOPER Date of Execution Source of Tile Instrument No Name Address W D.R. _ Page VICINIWWWWTY MAP Nis Public Works Notes 1. NPDES and grading permits are required prior to construction. 2. Stormwater detention ordinance applies to this property. 3. Plans of all work in right-of-way shall be submitted for approval prior to start of work. 4. Provide stripping and signage plans as per ordinance for Traffic Engineering approval. 5. Prior to construction obtain barricade permit for work done within right-of-way. 6. Easements are for utilities and drainage where needed. 7. Average Lot Slope = 11% 8. Easements for proposed stormwater detention facilities are required. 9. A grading permit per secs. 29-186(c) and (d) will be required with a building permit. tea. �2� �_ CHENAL PARKWAY LEGAL DESCRIPTION PART OF THE W1/2 OF SECTION 15, T-2-N, R-14-W, LITTLE ROCK, PULASKI COUNTY, ARKANSAS, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF LOT 1, CHENAL VALLEY PHASE II COMMERCIAL, AN ADDITION TO THE CITY OF LITTLE ROCK, ARKANSAS; THENCE S84'34'07"W, 125.00 FT. TO A POINT 15.00 FT. WEST OF THE THE WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY AND THE POINT OF BEGINNING; THENCE S05'25'53"E ALONG A LINE 15.00 FT. WEST OF AND PARALLEL WITH THE SAID WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY, 70.72 FT. TO A POINT ON SAID WEST RIGHT-OF-WAY LINE; THENCE SOUTHERLY ALONG SAID WEST RIGHT-OF-WAY LINE THE FOLLOWING: (1) S84'34'07"W, 5.00 FT.; (2) S05'25'53"E, 300.00 FT.; (3) N84'34'07"E, 10.00 FT. AND (4) S0525'53 E, 174.88 FT. TO A POINT ON THE NORTH RIGHT-OF-WAY LINE OF NORTHFIELD DRIVE; THENCE S59'30'41"W ALONG SAID NORTH RIGHT- OF-WAY LINE, 121.06 FT.; THENCE WESTERLY CONTINUING ALONG SAID NORTH RIGHT-OF-WAY LINE BEING THE ARC OF A 1220.00 FT. RADIUS CURVE TO THE RIGHT, A CHORD BEARING AND DISTANCE OF N83'25'5E"W, 619.74 FT.; THENCE N68'43'08"W CONTINUING ALONG SAID NORTH RIGHT-OF-WAY LINE, 370.59 FT.; THENCE N11'05'11"E, 919.40 FT. TO A POINT ON THE SOUTH RIGHT-OF-WAY LINE OF ARKANSAS STATE HWY. 1010; THENCE EASTERLY ALONG SAID SOUTH RIGHT-OF-WAY LINE THE FOLLOWING: (1) S78'3715''E, 139.23 FT.; 2 Nll'17'38"E, 54.94 FT.; (3) S78'42'24"E, 182.36 FT.; (4) S6859'35"E. 149.47 FT.; AND (5) S83'29'00"E, 288.51 FT. TO A POINT ON THE WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY; THENCE S41'48'22"E ALONG SAID WEST RIGHT-OF- WAY LINE, 76.70 FT.; THENCE SOUTHERLY ALONG A LINE 15.00 FT. WEST OF AND PARALLEL WITH SAID WEST RIGHT-OF-WAY LINE BEING THE ARC OF A 1507.39 FT. RADIUS CURVE TO THE LEFT, A CHORD BEARING AND DISTANCE OF S03'08'24"E, 120.55 FT.; THENCE S05'25'53"E CONTINUING ALONG SAID PARALLEL LINE, 231.40 FT. TO THE POINT OF BEGINNING, CONTAINING 21.8949 ACRES MORE OR LESS. i I I rr,h rl I' nm-354.62 >� I I I I fl-341.86 I I FYI � '°' 3LOT 1 .01 r�3 CHENAL VALLEY PHASE II COMMERCIAL ! I I I I I I PUT BOOK F, PG. 412 10 I I i j l I I II II I is WATERLW I i IINsm' # 98 General Notes: 1. Developer: Flake & Owner: Highway 10 - Chenol Parkway LLC John Flake, Hank Kelley 2. Linear feet of Internal Drives: 2400 Lf 3. Average Size of Lot: 2.43 Acres 4. Number of Lots: 9 Lots 5. Applicable existing covenants: C.V. P.OA. 6. Source of Water Supply: Central Arkansas Water 7. Source of Wosterwater Disposal: LRWWU 8. Variances: None 9. Floodway / Floodplain: N/A 10. Municipal Boundaries: Inside Corporate City Limits 11. Phasing Plan: One Phase 12. Average Slope of Lot = 11 R PRELIMINARY PLAT Lots 1-9 Little Rock Arkansas October 16, 2003 ® VVliZ1u 111f'e-MA 1!°1CiM & /11MOC x''11 °1['. p 111 V C CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING 24 RAHLING CIRCLE LITTLE ROCK, ARKANSAS 72223 Job Number: f40 W2PV EOOE 69:00:OT 02 130 LOW GGl10GH1\GGb10Vti1\ VN3H0\EOOZ\ W