HomeMy WebLinkAboutS-1405 Map 4Md. I' ,
1.9' sow
Gertrude & James Mills
Zoned C-3
John C. Wilson
& Ann Wilson
Zoned C-3
Deltic
Zoned R-2
pfeiler D
Zoned lC went
w �
i
2oe� z`Zc
0
CERTIFICATE OF PREUMINARY
SURVEYING ACCURACY
I, Paul M. White, hereby certify that
this plat correctly represents a bound-
ary survey made of verified by me that all
surveying requirments of the State of
Arkansas
ARKANSAS STATE
and City of Little Rock Sub-
PLANE COORDINATES
division Rules and Regulations have been
NORTH ZONE
complied with and a copy of said
boundary has been duly filed for record
(D N 173939.82
E 1165359.88
in offices of the State Surveryor and
eb N 173769.42
E 1165365.58
the Pulaski County Circuit Cie rk
20
Q_ NN 173787.53_
E 1166346.87_
• in Plat Book _Page
(;N 173468.87
E 1163375.06
m N 173469.82
E 1165385.02
8�
dD N 173295.73 -
E 9965401.57
Date of E ecution Paul FA.Whits, Registered 6 p T E p`
- I
M N 173234.31
E 1165297.25
Surveryor No. 1281, Ark a �.
N 173305.19
E 1164661.56
�
S K A IY, A S
���'
N 173439.69
E 1184338.28
N 174341.93
E II5Ot3.05
CERTIFICATE OF PRELIMINARY REGISTERED
N 174314.46
N 174368.34
E 1164649.54
E 1164660.30
ENGINEERING ACCURACY P R® F E S S 10 N A
174332.62
E 1164839.13
I, Timothy E. Deters, hereby certify ENGINEER
that this plat correctly represents a ie i4
plat made by me, and that engineering
N 174246.30
N t74179.98
E 11165285.32
E 1185331.60
the Little58ovok :O N0.5O33
N 174070.18
E 1165337.98
requirements of
Subdivision Rules and Reg have
have been complied withy ��/�
Engineer No. 5033, A
CERTIFICATE OF PRELIMINARY PLAT APPROVAL I?
a
All requirements of the Little Rock Jz
Subdivision Rules and Regulations
relative to the preparation and
submittal of a preliminary plat having
been fulfilled, approval of this plot
is hereby granted, subject to further
pprovision of said Rules and Regulations
Me certificate shall expire.
Date of Execution Planning Administrator
OWNER OR DEVELOPER
Dote of Execution Name
Address
Source of Tile D.R. _ Page VICINITY MAP
Instrument No. sit
0
Ir
Deltic
Zoned C-2
NPDES and grading permits are required prior to construction,
Stormwater detention ordinance applies to this property. -
Plans of all work in right -of -way -shall be submitted for
approval prior to start of work
Provide stripping and skpwge plans as per ordinance for
Traffic Dgineenng approval.
Prior to construction obtain barricade permit for work done
within right-of-way.
Easements are for utilities and drainage where needed.
Average Lot Slope - I I X
Easements for prolwsed stormwater detention facilities are required.
A grading permit per secs. 29-186(c) and (d) *11 be required
LEGAL DESCRIPTION
PART OF THE WI/2 OF SECTION 15, T-2-N, R-14-W, LITTLE ROCK, PULASKI
COUNTY, ARKANSAS, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF LOT 1, CHENAL VALLEY PHASE II
COMMERCIAL, AN ADDITION TO THE CITY OF LTTLE ROCK, ARKANSAS;
THENCE S"34'07'W, 125.00 FT. TO A POINT 15.00 FT. WEST OF THE THE WEST
RIGHT-OF-WAY LINE OF CHENAL PARKWAY AND THE POINT OF BEGINNING; THENCE
S05'25'53*E ALONG A LINE 15.00 FT. WEST OF AND PARALLEL WITH THE SAID
WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY, 70.72 FT. TO A POINT ON SAID
WEST RIGHT-OF-WAY UNE, THENCE SOUTHERLY ALONG SAID WEST RIGHT-OF-WAY
LINE THE FOLLOWING: (1) S84'34'07'W, 5.00 FT.;
(2) S05'25'51E, 300.00 FT.; (3) N84'34'O7'E, 10.00 Fr. AND (4)
S05'25'51E, 174.88 FT. TO A POINT ON THE NORTH RIGHT-OF-WAY LINE
OF NORTHFIELD DRIVE: THENCE S59'30'41'W ALONG SAID NORTH RIGHT-
OF-WAY LINE, 121.06 FT.; THENCE WESTERLY CONTINUING ALONG SAID
NORTH RIGHT-OF-WAY LINE BEING THE ARC OF A 1220.00 FT. RADIUS CURVE
TO THE RIGHT, A CHORD BEARING AND DISTANCE OF N83'25'5TW, 619.74
FT.; THENCE N6843'08'W CONTINUING ALONG SAID NORTH RIGHT-OF-WAY
LINE, 370.59 FT.; THENCE NtY05'11'E, 919.40 FT. TO A POINT ON
THE SOUTH RIGHT-OF-WAY LINE OF ARKANSAS STATE HWY, 110; THENCE
EASTERLY ALONG SAID SOUTH RIGHT-OF-WAY LINE THE FOLLOWING: (1)
S783715E, 139.23 FT.; (2) N11'171TE, 54.94 FT.; (3)
S7842'24 E, 182.36 FT.; (4) S68'59'VE, 149.47 Fr.; AND (5)
S83'29'OOaE, 281L51 FT. TO A POINT ON THE WEST RIGHT-OF-WAY LINE
OF CHENAL PARKWAY; THENCE S41'48'22E ALONG SAID WEST RIGHT-OF-
WAY LINE, 76.70 FT.; THENCE SOUTHERLY ALONG A LINE 15.00 FT. WEST
OF AND PARALLEL WiTH SAID WEST RIGHT-OF-WAY LINE BEING THE ARC
OF A 1507.39 Fr. RADIUS CURVE TO THE LEFT, A CHORD BEARING AND
DISTANCE OF SOSO8'24'E, 120.55 FT.; THENCE S05'25'53'E
CONTINUING ALONG SAID PARALLEL LINE, 231.40 FT. TO THE POINT OF
BEGINNING, CONTAINING 21.8949 ACRES MORE OR LESS.
General Noter.
1. Developer. Flake 6: Kelley Commercial
425 W Capitol Avenue, Suite 300
Little Rock, AR 72201
Owner. Highway 10 - Chanel Parkway LLC
John Flake, Hank Kelley
2. Linear feet of Internal Drives: 2400 Lf
3. Average Size of Lot: 2.74 Acres
4. Number of Lots: 8 Lots
5. Applicable existing covenants: C.V. P.OA
6. Source of Water Supply: Central Arkansas Water
7. Source of Wasterwater Disposal: LRWWU
8. Variances: None
9. Floodway / Floodplain: N/A
10. Municipal Boundaries: Inside Corporate City Limits
11. Phasing Plan: One Phase
12. Average Slope of Lot - I I X
13. Phasing will be market driven,
14. Final platting w81 be one lot at a time.
PRELIMINARY PLAT
Lots 1-8
Chenal Parkway - Highway 10
COMMERCIAL SUBDIVISION
Little Rock
Arkansas '
z�zw
October 16e 2003
Rednd Norember Ile 2009
Redeed Norember 19e 2009 ,=�
''�C
s CML ENGINEERING, LAND PLANNING d: DEVELOPMENT, SURVEYING
• 24 RAHUNG CIRCLE LITTLE ROCK, ARKANSAS 72223
Jnb Numk.,
Wepy C002 9E W :60 6; ADN peM 7di10V8AI7I?I10V8WVN3H0\E002\:W