Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S-1405 Map 3
Gertrude & James Mills Zoned C-3 John C. Wilson & Ann Wilson Zoned C-3 SS rid r• Pi tfte•/ f • i n Deltic Zoned R-2 CERTIFICATE OF PRELIMINARY SURVEYING ACCURACY I, Paul M. White, hereby certify that this plat correctly represents a bound- ary survey made of verified by me that all surveying requlrments of the State of Arkansas and City of Little Rock Sub- division Rules and Regulations have been complied with and o copy of said boundary has been duly filed for record in offices of the State Surveryor and the Pulaski County Circuit Clerk 20 , in Plat Book _Page CERTIFICATE OF PRELIMINARY ENGINEERING ACCURACY I, Timothy E. Daters, hereby certify that this plot correctly represents plat made by me, and that engine requirements of the little k Subdivision Rules and Reg la o 1 have been complied with. 1/-1'12 Date of Execution Im y Registered Professil Engineer No. 5033, CERTIFICATE OF PRELIMINARY PLAT APPR All requirements of the Little Rock Subdivision Rules and Regulations relative to the preparation and submittal of a preliminary plat having been fulfilled, approval of this plat is hereby granted, subject to further provision of said Rules and Regulations This certificate shall expire. Date of Execution Planning Administrator OWNER OR DEVELOPER Date of Execution Name Source of Tile Instrument No. Address D.R. - Page �'�eZ.fer Z o ,PI0 '7)a Zo �� Lr2G, 0�';? ¢�GZSTER� w rt> N L LS•'°� ARKANSAS STATE PLANE COORDINATES NORTH ZONE A ' �! I � I rm-354.62 ,} I �I I fl-341.86 i it Deltic Zoned C-2 ruosc worxs notes: 1. NPDES and grading permits are required prior to construction. 2. Stormwater detention ordinance applies to this property. 3. Plans of all work in right-of-woy shall be submitted for approval prior to start of work. -- - 4. Provide stripping and signage plans as per ordinance for Traffic Engineering approval. S. Prior to construction obtain barricade permit for work done within right-of-woy. 6. Easements are for utilities and drainage where needed. 7. Average Lot Slope = 117 8. Easements for proposed stormwater detention facilities are required. 9. A grading permit per secs. 29-186(c) and (d) will be required with a building permit. LEGAL DESCRIPTION PART OF THE W1/2 OF SECTION 15, T-2-N, R-14-W, LITTLE ROCK, PULASKI COUNTY, ARKANSAS, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF LOT 1, CHENAL VALLEY PHASE II COMMERCIAL, AN ADDITION TO THE CITY OF LITTLE ROCK, ARKANSAS; THENCE S8434'07"W, 125.00 FT. TO A POINT 15.00 FT. WEST OF THE THE WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY AND THE POINT OF BEGINNING; THENCE S05.25'53"E ALONG A LINE 15.00 FT. WEST OF AND PARALLEL WITH THE SAID WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY, 70.72 FT. TO A POINT ON SAID WEST RIGHT-OF-WAY LINE; THENCE SOUTHERLY ALONG SAID WEST RIGHT-OF-WAY LINE THE FOLLOWING: (1) S84.34'07'W, 5.00 FT.; (2) S05.25'53"E, 300.00 FT.; (3) N84.34'07'E, 10.00 FT. AND (4) S05.25'53"E, 174.88 FT. TO A POINT ON THE NORTH RIGHT-OF-WAY LINE OF NORTHFIELD DRIVE; THENCE S59.30'41"W ALONG SAID NORTH RIGHT- OF-WAY LINE, 121.06 Fr.; THENCE WESTERLY CONTINUING ALONG SAID NORTH RIGHT-OF-WAY LINE BEING THE ARC OF A 1220.00 FT. RADIUS CURVE TO THE RIGHT, A CHORD BEARING AND DISTANCE OF N83'25'56'W, 619.74 FT.; THENCE N6943'08"W CONTINUING ALONG SAID NORTH RIGHT-OF-WAY LINE, 370.59 FT.; THENCE N11.05'11"E, 919.40 FT. TO A POINT ON THE SOUTH RIGHT-OF-WAY LINE OF ARKANSAS STATE HWY. #10; THENCE EASTERLY ALONG SAID SOUTH RIGHT-OF-WAY LINE THE FOLLOWING: (1) S7637'15"E, 139,23 FT.; (2) N11'17'3TE, 54.94 FT.; (3) S78'42'24 E, 182,36 FT.; (4) S68'59'35"E, 149.47 FT.; AND (5) S83'29'00"E, 288,51 Fr. TO A POINT ON THE WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY; THENCE S41'48'22"E ALONG SAID WEST RIGHT-OF- WAY LINE, 76.70 FT.; THENCE SOUTHERLY ALONG A LINE 15.00 Fr. WEST OF AND PARALLEL WITH SAID WEST RIGHT-OF-WAY LINE BEING THE ARC OF A 1507.39 FT. RADIUS CURVE TO THE LEFT, A CHORD BEARING AND DISTANCE OF S03.08'2eE, 120.55 FT.; THENCE S05.25'53"E CONTINUING ALONG SAID PARALLEL LINE, 231.40 Fr. TO THE POINT OF BEGINNING, CONTAINING 21.8949 ACRES MORE OR LESS. General Notes• 1. Developer. Flake & 425 W Capitol Avenue, Suite 300 Little Rock, AR 72201 Owner. Highway 10 - Chenal Parkway LLC John Flake, Hank Kelley 2. Unear feet of Internal Drives: 2400 Lf 3. Average Size of Lot 2.74 Acres 4. Number of Lots: 8 Lots 5. Applicable existing covenants: C.V. P.O.A. 6. Source of Water Supply: Central Arkansas Water 7. Source of Wosterwater Disposal: LRWWU 8. Variances: None 9. Floodway / Floodplain: N/A 10. Municipal Boundaries: Inside Corporate City Limits 11. Phasing Plan: One Phase 12. Average Slope of Lot = 11R 13. Phasing will be market driven. 14. Final platting will be one lot at a time. 6,y / PRELIMINARY PLAT Lots 1-8 Chenal Parkway - Highway 10 COMMERCIAL SUBDIVISION Little Rock Arkansas cD October 16, 2003 J rl Revived November 11, 2009 = W Redsed November19, 2009 �,` � � o © pC7TZ-BA FEESOA92=4=199 DV(c CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING 0 24 RAHUNG CIRCLE LITTLE ROCK, ARKANSAS 72223 - Job Number. wept' E002 9E W :60 61 ADN Phil G7S13V8i\bbtil3V81\1VN3H3\E002\:W