HomeMy WebLinkAboutS-1405 Map 1CERTIFICATE OF PRELIMINARY
SURVEYING ACCURACY
I, Paul M. White, hereby certify that
this plat correctly represents a bound-
ary survey made of verified by me that.
surveying requirments of the State of
Arkansas and City of Little Rock Sub-
division Rules and Regulations have beer
complied with and a copy of said
boundary has been duly filed for record
in offices of the State Surveryor and
the Pulaski County Circuit Clerk on.
20 , in Plat Book_Page
Date of Execution Paul M. White, Registered Land
Surveryor No. 1281, Arkansas
CERTIFICATE OF PRELIMINARY
ENGINEERING ACCURACY
I, Timothy E. Daters, hereby certify
that this plot correctly represents a
plat made by me, and that engineering
requirements of the Little Rock
Subdivision Rules and Regulations have
have been complied with.
Dote of Execution Timothy E. Daters
Registered Professional
Engineer No. 5033, Arkonsa:
CERTIFICATE OF PRELIMINARY PLAT APPROVAL
All requirements of the Little Rock
Subdivision Rules and Regulations
relative to the preparation and
submittal of a preliminary plat having
been fulfilled, approval of this plat
is hereby granted, subject to further
provision of said Rules and Regulations
This certificate shall expire.
Date of Execution
Planning Administrator
OWNER OR DEVELOPER
Date of Execution
Source of Tile
Instrument No
ARKANSAS STATE PLANE COORDINATES
NORTH ZONE
TE�ryf
Aft AN,SAS N
REGISTERED t
PROFESSIONAL
ENGINEER
� t
No.5033
N%�T E. p°°o(' o
G
JOE T. ROBINSON
HIGH SCHOOL
Name
Address
D.R. _ Page VICINITY MAP
M
MONUMENT
no _monument set
set 1/2" Iron _Pin___
Public works Notes: _
1. NPDES and grading permits are required prior to construction.
2. Stormwater detention ordinance applies to this property.
3. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
4. Provide stripping and signage plans as per ordinance for
Traffic Engineering approval.
5. Prior to construction obtain barricade permit for work done
within right-of-way.
6. Easements are for utilities and drainage where needed.
7. Average Lot Slope = 11R
8. Easements for proposed stormwcter detention facilities are required.
9. A grading permit per secs. 29-186(c) and (d) will be required
with a building permit.
LEGAL DESCRIPTION
PART OF THE W1/2 OF SECTION 15, T-2-N, R-14-W, LITTLE ROCK, PULASKI
COUNTY, ARKANSAS, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF LOT 1, CHENAL VALLEY PHASE II
COMMERCIAL, AN ADDITION TO THE CITY OF LITTLE ROCK, ARKANSAS;
THENCE S8434'07'W, 125.00 FT. TO A POINT 15.00 FT. WEST OF THE THE WEST
RIGHT-OF-WAY LINE OF CHENAL PARKWAY AND THE POINT OF BEGINNING; THENCE
S0525'53"E ALONG A LINE 15.00 FT. WEST OF AND PARALLEL WITH THE SAID
WEST RIGHT-OF-WAY LINE OF CHENAL PARKWAY, 70.72 FT. TO A POINT ON SAID
WEST RIGHT-OF-WAY LINE; THENCE SOUTHERLY ALONG SAID WEST RIGHT-OF-WAY
LINE THE FOLLOWING: (1) S84'34'07"W, 5.00 FT.;
(2) S0625'53"E, 300.00 FT.; (3) N84'34'07"E, 10.00 FT. AND (4)
ARKANSAS STATE HWY y 10 S05'25'53-E, 174.88 FT. TO A POINT ON THE NORTH RIGHT-OF-WAY LINE
OF NORTHFIELD DRIVE; THENCE S59'30'41"W ALONG SAID NORTH RIGHT-
OF-WAY LINE, 121.06 FT.; THENCE WESTERLY CONTINUING ALONG SAID
HIS SITE NORTH RIGHT-OF-WAY LINE BEING THE ARC OF A 1220.00 FT. RADIUS CURVE
TO THE RIGHT, A CHORD BEARING AND DISTANCE OF N8325'58"W, 619.74
FT.; THENCE N68'43'08"W CONTINUING ALONG SAID NORTH RIGHT-OF-WAY
LINE, 370.59 FT.; THENCE N11'05'11"E, 919.40 Fr. TO A POINT ON
THE SOUTH RIGHT-OF-WAY LINE OF ARKANSAS STATE HWY. #10; THENCE
EASTERLY ALONG SAID SOUTH RIGHT-OF-WAY LINE THE FOLLOWING: (1)
S7837'15E, 139.23 Fr.; 2 N11'17'38"E, 54.94 Fr.; (3)
S78'42'24"E, 182.36 FT.; (4) S68'59'35"E, 149.47 FT.; AND (5)
dr S83'29'00"E, 288.51 Fr. TO A POINT ON THE WEST RIGHT-OF-WAY LINE
CHQUL PARKWAY OF CHENAL PARKWAY; THENCE S41'48'22"E ALONG SAID WEST RIGHT-OF-
WAY LINE, 76.70 FT.; THENCE SOUTHERLY ALONG A LINE 15.00 FT. WEST
OF AND PARALLEL WITH SAID WEST RIGHT-OF-WAY LINE BEING THE ARC
OF A 1507.39 FT. RADIUS CURVE TO THE LEFT, A CHORD BEARING AND
DISTANCE OF SOTO8'2eE, 120.55 FT.; THENCE S0525'53"E
CONTINUING ALONG SAID PARALLEL LINE, 231.40 Fr. TO THE POINT OF
BEGINNING, CONTAINING 21.8949 ACRES MORE OR LESS.
'0,
General Notes:
1. Developer: Flake & Kelley Commercial
425 W Capitol Avenue, Suite 300
Little Rock, AR 72201
Owner: Highway 10 - Chenal Parkway LLC
John Flake, Honk Kelley
2. Linear feet of Internal Drives: 2400 U
3. Average Size of Lot: 2.43 Acres
4. Number of Lots: 9 Lots
5. Applicable existing covenants: C.V. P.O.A.
6. Source of Water Supply: Central Arkansas Water
7. Source of Wasterwater Disposal: LRWWU
8. Variances: None
9. Floodway / Floodploin: N/A
10. Municipal Boundaries: Inside Corporate City Limits
11. Phasing Plan: One Phase
12. Average Slope of Lot = 11%
LOT 1
CHENAL VALLEY
PHASE II COMMERCIAL
PUT BOOK F, PG. 412
WATERUNE ESMT.
R. E 98-021076
PRELIMINARY PLAT
Lots 1-9
Chenal Parkway
r_ Highway
Little Rock
Arkansas
October 16, 2003
® VV 117J1L 1L 1 -I DA l! E LU & ll169A90CM 1l 11 9 H4C.
CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING
0 24 RAHLING CIRCLE LITTLE ROCK, ARKANSAS 72223
Job Number:
WPPV CO2 69:00 01 02 400 u0W DGb10tLi1�hGT10GH1\ltlN3H0\£OOZ\ W