HomeMy WebLinkAboutS-1397 Staff AnalysisSubdivision Committee Comments �n ��gust 14, 2003
Y ITEM NO.: 11 �"- FILE NO.: S-1397
�� r3�ww
NAME: Glen Valley Preliminary Plat
Q �o �tQCATION: east of Gooch Road and west of Heatherbrae Subdivision — Phase III
Planning Staff Comments:
1. Provide notification of abutting property owners complete with the certified
n abstract list, notice form with affidavit executed and proof of mailing.
r2. Provide the linear feet of internal street in the general notes section of the site
v, plan.
3. Provide the average size of the lots and the minimum lot size in the general
notes section of the site plan.
4. Provide the names of recorded subdivisions abutting the plat area indicated.
5. Provide the names of owners of all unplatted tracts abutting the plat area and
names of owners of platted tracts in excess of 2 % acres.
J ----, 6. Provide the zoning classification within the plat boundary and of abutting
areas shown.
V�'7. Provide buildable areas for Lots 1, 9 and 26 of Glen Valley. The applicant
IVrP may want to consider a variance to allow a reduced rear building line.
Variance/Waivers:
1. Minimum Lot Width, Glen Valley — Lots 2 - 5, 11 — 21 and 24.
Minimum Lot Width, Heatherbrae Phase III - Lots 14 — 17.
Minimum Lot Area — Lots 2 — 8 Glen Valley Subdivision. s�
Public Works:
V'tC-Y
1. Glen Valley Drive should be platted as 50 foot wide right-of-way and 26 foot
of pavement with a sidewalk on one side.
2. The street names must be approved by the Special Programs section of
Public Works. Contact David Hathcock at 371-4809.
3. The curve radius on Highlander must be 75 foot minimum.
4. The curb at the cul-de-sacs must transition from curve to straight with a 20
foot minimum radius.
5. Stormwater detention from Phase 1 and 2 of Heatherbrae was deferred to
Phase 3. The proposed detention facilities appear to retain only a small
portion of the total that will be required. Provide calculations to support the
sizing of the facilities for all previous phases of Heatherbrae and the proposed
expansion.
6. The ditch and stormwater detention must be constructed with the first Phase
of the revised plat.
7. Ditch channels shall be reinforced concrete with suitable pedestrian fence
barriers. Channel size will be confirmed prior to construction.
8. A 25 foot access easement adjacent to the floodway is required.
9. As with the previous phases, downstream channel improvements may be
required to assure proper drainage and no standing water in the drainage
pipes and channels of the new subdivision.
10. A Sketch Grading and Drainage Plan will be required per Section 29-186 (f)
with this preliminary plat. Show the proposed grade for the lots and streets,
location of all drainage ditches and swales. A final grading permit will be
required prior to any land clearing or grading activities at the site.
11. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction.
12. The floodway and floodplain boundaries are based on outdated maps. Plot
the updated boundaries on the plat, showing a more detailed boundary based
on existing contours. Show the proposed finish floor elevations of lots located
in the floodplain.
13. Provide details of the design and function of the flow control structure. This
structure must be carefully designed to alleviate down stream drainage
problems in Phase 2.
14. Prepare a letter of pending development addressing streetlights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpott) for more information regarding street light
requirements.
15. A secondary subdivision access point to Gooch Lane would be desirable to
improve routine maintenance and emergency access.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, if service is
required for the project.
Entergy: Approved as submitted.
Center -Point Energy:
SBC: SBC request a ten -foot utility easement located at the back of the right-of-
way on all lots. Contact SBC (Charles McDonald) at 373-5112 for additional
details.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A water main extension will be
required in order to provide service to this property. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. This development will have minor impact on existing water
distribution system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department: Increase the 40-foot radius to 45-feet. Place fire hydrants per
code. Contact the Little Rock Fire Department at 918-3752 for additional details.
County Planning: No comment received.
CATA: No comment received.
Plannino Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to
include the additional information as noted above) to staff on Wednesday, August
20, 2003.
September 4, 2003
ITEM NO.: 11
NAME: Glen Valley Preliminary Plat
LOCATION: east of Gooch Road, west of Heatherbrae Phase III
DEVELOPER:
Jack Wilson and Bill Bosley
9107 Rodney Parham Road
Little Rock, AR 72203
P:Mr_1 1PF:P-
Civil Design Engineers, Inc.
15104 Cantrell Road
Little Rock, AR 72223
AREA: 15.4 acres
CURRENT ZONING
PLANNING DISTRICT
CENSUS TRACT: 42.11
NUMBER OF LOTS: 55
R-2, Single-family
19 - Chenal
VARIANCESMAIVERS REQUESTED:
FILE NO.: S-1397
FT. NEW STREET: 2,267 LF
1. A variance to allow a reduced minimum lot width for Glen Valley Phase I — Lots 1
and 2.
2. A variance to allow a reduced minimum lot area for Glen Valley Phase I — Lots 1
and 2.
A. PROPOSAL:
The applicant proposes to subdivide this 15.4 acre site into 58 single-family lots.
The proposal includes the development of the lots with garden style patio homes.
September 4, 2003
SUBDiVISIO
ITEM NO.: 11 (Cont.
FILE NO.: S-1397
The lots will be developed in three phases with 23 lots in the first phase, 7 lots in
the second phase and 25 lots in the third phase. The applicant has indicated the
lots will be served by a series of residential streets (cui-de-sac's) with no outlet
being planned to Gooch Lane.
The development includes a portion of Heatherbrae Phase 3 which was
previously reviewed and approved for a preliminary plat. The applicant is
proposing to revise the previously approved plat. The revision includes a
reduction of the on -site detention area. The applicant has indicated by working
with the Corp of Engineers, the previously required detention area may be
reduced.
B. EXISTING CONDITIONS:
The site is a vacant tree covered site with a large drainage ditch extending
through the center of the site. There is a FEMA mapped floodway located along
the northern boundary of the site. The existing Glen Valley Drive dead -ends at
the proposed entrance into the subdivision.
There are single-family homes located in the area with the Heatherbrae
Subdivision located to the east and new homes being constructed on tracts on
Gooch Lane to the west. Gooch Lane does not extend into the proposed
development.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
owners abutting the proposed preliminary plat area along with the
Westchester/Heatherbrae and the Charleston Height/North Rahling Road
Neighborhood Associations were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
Public Works:
1. Glen Valley Drive should be platted as 50 foot wide right-of-way and 26 foot
of pavement with a sidewalk on one side.
2. The street names must be approved by the Special Programs section of
Public Works. Contact David Hathcock at 371-4809.
3. The curve radius on Highlander must be 75 foot minimum.
4. The curb at the cul-de-sacs must transition from curve to straight with a 20
foot minimum radius.
5. Stormwater detention from Phase 1 and 2 of Heatherbrae was deferred to
Phase 3. The proposed detention facilities appear to retain only a small
portion of the total that will be required. Provide calculations to support the
sizing of the facilities for all previous phases of Heatherbrae and the
proposed expansion.
2
September 4, 2003
SUBDIVISION
ITEM NO.: 11 (Cont.) FILE NO.: S-1397
6. The ditch and stormwater detention must be constructed with the first Phase
of the revised plat.
7. Ditch channels shall be reinforced concrete with suitable pedestrian fence
barriers. Channel size will be confirmed prior to construction.
8. A 25 foot access easement adjacent to the floodway is required.
9. As with the previous phases, downstream channel improvements may be
required to assure proper drainage and no standing water in the drainage
pipes and channels of the new subdivision.
10. A Sketch Grading and Drainage Plan will be required per Section 29-186 (f)
with this preliminary plat. Show the proposed grade for the lots and streets,
location of all drainage ditches and swales. A final grading permit will be
required prior to any land clearing or grading activities at the site.
11. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
12. The floodway and floodplain boundaries are based on outdated maps. Plot
the updated boundaries on the plat, showing a more detailed boundary
based on existing contours. Show the proposed finish floor elevations of
lots located in the floodplain.
13. Provide details of the design and function of the flow control structure. This
structure must be carefully designed to alleviate down stream drainage
problems in Phase 2.
14. Prepare a letter of pending development addressing streetlights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpott) for more information regarding street light
requirements.
15. A secondary subdivision access point to Gooch Lane would be desirable to
improve routine maintenance and emergency access.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project.
Entergy: Approved as submitted.
Center -Point Energy: No comment received.
SBC: SBC request a ten -foot utility easement located at the back of the right-of-
way on all lots. Contact SBC (Charles McDonald) at 373-5112 for additional
details.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
3
September 4, 2003
SUBDIVISION
ITEM NO.: 11 (Cont.) FILE NO.: S-1397
the time of request for water service must be met. A water main extension will be
required in order to provide service to this property. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. This development will have minor impact on existing water
distribution system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department: Increase the 40-foot radius to 45-feet. Place fire hydrants per
code. Contact the Little Rock Fire Department at 918-3752 for additional details.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape,: No comment.
G. SUBDIVISION COMMITTEE COMMENT:
(August 14, 2003)
Mr. Bill Dean and Mr. James Dreher were present representing the request.
Staff stated the request was to allow the subdivision of 15.69 acres into 55
single-family lots. Staff noted there were additional items that needed to be
shown of the proposed preliminary plat. Staff requested the linear feet of internal
street, the average size of the lots, the minimum lots size and the names of
recorded subdivisions abutting the plat area be indicated on the preliminary plat.
Staff also noted there were several lots that did not appear to be buildable lots
once all the required setbacks were placed on the lots. Staff suggested the
applicant review the lots and if necessary request variances for reduced front
platted building line and for reduced rear yard setbacks.
Public Works comments were addressed. Staff stated the request was an
extension of the Heatherbrae Subdivision. Staff also noted all the detention for
Heatherbare was deferred to this Phase. Staff questioned if the proposed
detention was adequate to handle the stormwater runoff. Staff requested the
applicant provide details of the design and function of the flow control structure.
Staff stated the structure should be carefully designed to alleviate down stream
drainage problems.
Staff suggested the applicant secure a second entrance into the subdivision.
There was a limited discussion concerning the second access point suggested
off Gooch Lane. Staff stated the residents did not consider Gooch Lane a
0
September 4, 2003
SUBDIVISION
ITEM NO.: 11 Cont. FILE NO.: S-1397
publicly dedicated street.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
ArL
The applicant submitted a revised preliminary plat to staff addressing most of the
issues raised at the August 14, 2003 Subdivision Committee meeting. The
applicant has indicated the minimum lot size of the development at 55.8-feet by
120-feet and the average lot size of 60-feet by 120-feet. The applicant has also
indicated the names of the abutting subdivisions and the zoning classification.
The applicant has indicated Lots 1 and 2 of Glen Valley Phase I will require
variances from the Subdivision Ordinance. The applicant has indicated a
variance will be required for the minimum lot width requirement (minimum
required 60-feet) and the minimum lot area (minimum 7,000 square feet required)
for these lots.
The applicant has indicated the detention area as requested by Public Works.
The applicant has indicated the channel to be constructed of block. Staff is not
supportive of this request. Staff feels the channel should be constructed of
reinforced concrete to ensure stability.
The site is located adjacent to a designated floodway. The applicant has
indicated a twenty-five foot access easement adjacent to the floodway as
required by ordinance. There is a question concerning Lots 13 and 20 Glen
Valley Phase 2 with regard to buildabiiity. Lot 13 appears to be located below
the 100-year flood elevation. The appficant will be required to set the floor
elevation for this lot. With the dedication of the twenty-five foot access
easement, staff questions if the building area for Lot 20 is sufficient to meet all
the required setbacks. Staff recommends the applicant furnish a buildable area
for Lot 20 on the proposed preliminary plat.
The proposed preliminary plat indicates a road right-of-way extending into the
plat area. The preliminary plat indicates Gooch Lane with a 50-foot right-of-way
along Lot 7 Glen Valley Phase I. With the indicated right-of-way and the required
setbacks, this lot appears to be limited on buildable area. Staff recommends the
applicant abandon the right-of-way or indicate the buildable area on the proposed
preliminary plat.
Lot 17 Heatherbrae Phase 3 also appears to be limited by a sewer easement.
The proposed preliminary plat indicates a sewer easement crossing the lot
diagonally across the rear, limits the buildable area for the lot. Staff would
recommend the applicant furnish the buildable area for this lot as well.
The applicant is proposing the development of this site in three phases. There
are to be 23 lots in the first phase, 7 lots in the second phase and 25 lots in the
third phase. Staff is supportive of the phasing plan.
5
September 4, 2003
SUBDIVISION
ITEM NO.: 11 Cont. FILE NO.: S-1397
The applicant has indicated Highlander Drive to end in a Y2 cul-de-sac. Staff is
not supportive of this design. Staff feels the proposed Y2 cul-de-sac is not
adequate to allow trucks to turn around. Staff feels the design should be a
hammerhead and the extension of the hammerhead into the access easement
for the drainage channel is acceptable.
To staffs knowledge there are no other outstanding issues associated with the
proposed request. The proposed development will be constructed at 3.57 units
per acres. Staff feels the proposed subdivision should have minimal to no
adverse impact on the surrounding area.
STAFF RECOMMENDATION:
1. Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
2. Staff recommends approval of the requested variance to allow Lots 1 and 2
Glen Valley Phase I to develop with a reduced minimum lot width.
3. Staff recommends approval of the requested variance to allow Lots 1 and 2 of
Glen Valley Phase I to develop with a reduced minimum lot area.
4. Staff recommends the applicant furnish buildable area for Lot 7 Glen Valley
Phase I, Lot 17 Glen Valley Phase 2 and Lot 23 of Heatherbrae Phase 3.
5. Staff recommends the channel be constructed of reinforced concrete.
6. Staff recommends Highlander Drive be constructed with a hammerhead
turnaround.
PLANNING COMMISSION ACTION: (SEPTEMBER 4, 2003)
Mr. James Dreher was present representing the request. There were objectors present.
Staff presented the item with a recommendation of approval. Staff presented a
recommendation of approval of the requested variance to allow Lots 1 and 2 Glen
Valley Phase I to develop with a reduced minimum lot width and the requested variance
to allow Lots 1 and 2 of Glen Valley Phase I to develop with a reduced minimum lot
area.
Mr. Jim Nettles addressed the Commission with questions. He stated he owned the
property to the south Highland Drive. He stated he and the owner had agreed that
access to this site could be taken from Highlander Drive and was requesting the
Commission make this a condition of approval.
Staff stated typically the only time the Commission required an applicant provide access
to an adjoining property was when the parcel was land locked. Staff stated this was not
the case Mr. Nettles had access to his site from Taylor Loop Road.
0
September 4, 2003
SUBDIVISION
ITEM NO.: 11 (Cont.) FILE NO.: S-1397
Mr. Gary Drawbaugh addressed the commission with questions. He stated his concern
was the right-of-way indicated on the site plan for Gooch Drive. He stated he and his
neighbors would like the right-of-way abandoned as a part of the development. He also
stated there were drainage concerns. He stated if the site were developed without
proper drainage then the residents of Gooch Drive would be severely impacted. He
stated the proposed development should be designed to allow the water to flow freely.
Mr. Dan Myers addressed the Commission with questions. He stated his concern was
also drainage and how the developer would address the issue.
Mr. Arthur Lee Jones addressed the Commission with concerns. He stated his home
was located at 4309 Glen Valley Drive. He stated is primary concern was the increased
traffic in the area. He stated all the traffic from Heatherbrae only had one exit. He
stated to add an additional 55 lots was a major concern.
Mr. Lee stated water was also a concern. He stated there were occasion when property
owners were evacuated from their homes in the Heatherbrae Subdivision because the
drainage was not adequate.
Mr. Dale Woodall addressed the Commission. He stated he was neutral. He stated his
concern was the existing situation on Gooch Drive and the garbage trucks. He stated
currently the trucks were utilizing a vacant lot to turn around but the lot had sold and a
new home was under construction. He stated one solution would be to allow a portion
of the existing right-of-way to be a turn around for the Gooch Drive.
Mr. Tom Deluca addressed the Commission in opposition of the proposed request. He
stated his opposition was to the additional traffic on Glen Valley Drive. He stated when
he purchased his home he was told there would be approximately 20 additional homes
located in the proposed area. He stated now the developer was proposing 55 new
homes which was a vast difference.
Mr. Deluca questioned if access to the site could not be taken from Highway 10 at
Seven Acres Business Drive. Commissioner Rector stated crossing the creek, which
was a designated floodway, would be cost prohibited if the Corp of Engineers would
allow the crossing.
Mr. Tom Costa addressed the Commission with concerns of traffic, drainage and
construction traffic into the neighborhood.
Mr. James Dreher addressed the Commission on behalf of the applicant. He stated the
applicant was willing to abandon the right-of-way indicated on proposed Lot 7. He
stated the lots staff questioned as far as buildable areas would be resolved through
minor lot line modifications. He stated with a slight shift the lots could be modified to
increase the buildable areas.
Mr. Dreher stated the owner was willing to allow access to the property to the south of
Highlander Drive. He stated Highlander Drive would be constructed with a
hammerhead turnaround as recommended by staff. There was a general discussion
concerning the development of the property and the access. Staff stated this was not
fair to the residents of Heatherbrae. They stated if this property was allowed access
this would increase the number of units by eight to ten thus only increasing the traffic in
rl
September 4, 2003
SUBDIVISION
ITEM NO.: 11 (Cont.) FILE NO.: S-1397
the area. Staff stated the owner of the site to the south had access to Taylor Loop
Road.
There was a lengthy discussion concerning the drainage of the existing subdivision and
the proposed subdivision. Mr. Dreher stated the owner had worked with the Corp of
Engineers and secured a location for the proposed drainage channel through the site.
He stated a portion of the water which traveled through the existing subdivision would
be diverted to the new drainage channel which would relieve most of the pressure on
the existing drainage structures. Mr. Dreher stated the applicant was willing to follow
staffs recommendation that the channel be constructed of reinforced concrete.
A motion was made to approve the request as amended (the removal of the existing
right-of-way for Gooch Drive) including all variance request subject to compliance with
the conditions outlined in paragraphs D, E and F of the staff report. The motion carried
by a vote of 7 ayes, 1 no and 3 absent. Commissioner Floyd noted he was opposed to
the variance request only.
0
O.: S-1397
NAME: Glen Valley Preliminary Plat
LOCATION: east of Gooch Road, west of Heatherbrae Phase III
DEVELOPER:
Jack Wilson and Bill Bosley
9107 Rodney Parham Road
Little Rock, AR 72203
ENGINEER:
Civil Design Engineers, Inc.
15104 Cantrell Road
Little Rock, AR 72223
AREA: 15.4 acres NUMBER OF LOTS: 55 FT. NEW STREET: 2,267 LF
CURRENT ZONING: R-2, Single-family
PLANNING DISTRICT: 19 - Chenal
CENSUS TRACT: 42.11
VARIANCESIWAIVERS REQUESTED:
1. A variance to allow a reduced minimum lot width for Glen Valley Phase I — Lots 1
and 2.
2. A variance to allow a reduced minimum lot area for Glen Valley Phase I — Lots 1
and 2.
A. PROPOSAL:
The applicant proposes to subdivide this 15.4 acre site into 58 single-family lots.
The proposal includes the development of the lots with garden style patio homes.
The lots will be developed in three phases with 23 lots in the first phase, 7 lots in
the second phase and 25 lots in the third phase. The applicant has indicated the
LE NO.: S-1397 (Cont.
lots will be served by a series of residential streets (cul-de-sac's) with no outlet
being planned to Gooch Lane.
The development includes a portion of Heatherbrae Phase 3 which was
previously reviewed and approved for a preliminary plat. The applicant is
Proposing to revise the previously approved plat. The revision includes a
reduction of the on -site detention area. The applicant has indicated by working
with the Corp of Engineers, the previously required detention area may be
reduced.
B. EXISTING CONDITIONS:
The site is a vacant tree covered site with a large drainage ditch extending
through the center of the site. There is a FEMA mapped floodway located along
the northern boundary of the site. The existing Glen Valley Drive dead -ends at
the proposed entrance into the subdivision.
There are single-family homes located in the area with the Heatherbrae
Subdivision located to the east and new homes being constructed on tracts on
Gooch Lane to the west. Gooch Lane does not extend into the proposed
development.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
owners abutting the proposed preliminary plat area along with the
VVestchester/Heatherbrae and the Charleston Height/North Rahling Road
Neighborhood Associations were notified of the -Public Hearing.
D. ENGINEERING COMMENTS:
Public Works:
1. Glen Valley Drive should be platted as 50 foot wide right-of-way and 26 foot
of pavement with a sidewalk on one side.
2. The street names must be approved by the Special Programs section of
Public Works. Contact David Hathcock at 371-4809.
3. The curve radius on Highlander must be 75 foot minimum.
4. The curb at the cul-de-sacs must transition from curve to straight with a 20
foot minimum radius.
5. Stormwater detention from Phase 1 and 2 of Heatherbrae was deferred to
Phase 3. The proposed detention facilities appear to retain only a small
portion of the total that will be required. Provide calculations to support the
sizing of the facilities for all previous phases of Heatherbrae and the
proposed expansion.
6. The ditch and stormwater detention must be constructed with the first Phase
of the revised plat.
7. Ditch channels shall be reinforced concrete with suitable pedestrian fence
barriers. Channel size will be confirmed prior to construction.
2
ILE NO.: S-1397 (Cont.
8. A 25 foot access easement adjacent to the floodway is required.
9. As with the previous phases, downstream channel improvements may be
required to assure proper drainage and no standing water in the drainage
pipes and channels of the new subdivision.
10. A Sketch Grading and Drainage Plan will be required per Section 29-186 (f)
with this preliminary plat. Show the proposed grade for the lots and streets,
location of all drainage ditches and swales. A final grading permit will be
required prior to any land clearing or grading activities at the site.
11. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
12. The floodway and floodplain boundaries are based on outdated maps. Plot
the updated boundaries on the plat, showing a more detailed boundary
based on existing contours. Shove the proposed finish floor elevations of
lots located in the floodplain.
13. Provide details of the design and function of the flow control structure. This
structure must be carefully designed to alleviate down stream drainage
problems in Phase 2.
14. Prepare a letter of pending development addressing streetlights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpott) for more. information regarding street light
requirements.
15. A secondary subdivision access point to Gooch Lane would be desirable to
improve routine maintenance and emergency access.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project.
Entergy: Approved as submitted.
Center -Point Energy: No comment received.
SBC: SBC request a ten -foot utility easement located at the back of the right-of-
way on all lots. Contact SBC (Charles McDonald) at 373-5112 for additional
details.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A water main extension will
be required in order to provide service to this property. A Capital Investment
Charge based on the size of the meter connections) will apply to this project
in addition to normal charges. This development will have minor impact on
existing water distribution system. Proposed water facilities will be sized to
provide adequate pressure and fire protection.
3
FILE NO.: S-1397 (Cont.)
Fire Decartment: Increase the 40-foot radius to 45-feet. Place fire hydrants per
code. Contact the Little Rock Fire Department"at 918-3752 for additional details.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (August 14, 2003)
Mr. Bill Dean and Mr. James Dreher were present representing the request.
Staff stated the request was to allow the subdivision of 15.69 acres into 55
single-family lots. Staff noted there were additional items that needed to be
shown of the proposed preliminary plat. Staff requested the linear feet of internal
street, the average size of the lots, the minimum lots size and the names of
recorded subdivisions abutting the plat area be indicated on the preliminary plat.
Staff also noted there were several lots that did not appear to be buildable lots
once all the required setbacks were placed on the lots. Staff suggested the
applicant review the lots and if necessary request variances for reduced front
platted building line and for reduced rear yard setbacks.
Public Works comments were addressed. Staff stated the request was an
extension of the Heatherbrae Subdivision. Staff also noted all the detention for
Heatherbare was deferred to this Phase. Staff questioned if the proposed
detention was adequate to handle the stormwater runoff. Staff requested the
applicant provide details of the design and function of the flow control structure.
Staff stated the structure should be carefully designed to alleviate down stream
drainage problems.
Staff suggested the applicant secure a second entrance into the subdivision.
There was a limited discussion concerning the second access point suggested
off Gooch Lane. Staff stated the residents did not consider Gooch Lane a
publicly dedicated street.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to staff addressing most of the
issues raised at the August 14, 2003 Subdivision Committee meeting. The
applicant has indicated the minimum lot size of the development at 55.8-feet by
4
FILE NO.: S-1397 (Cont.
120-feet and the average lot size of 60-feet by 120-feet. The applicant has also
indicated the names of the abutting subdivisions and the zoning classification.
The applicant has indicated Lots 1 and 2 of Glen Valley Phase I will require
variances from the Subdivision Ordinance. The applicant has indicated a
variance will be required for the minimum lot width requirement (minimum
required 60-feet) and the minimum lot area (minimum 7,000 square feet required)
for these lots.
The applicant has indicated the detention area as requested by Public Works.
The applicant has indicated the channel to be constructed of block. Staff is not
supportive of this request. Staff feels the channel should be constructed of
reinforced concrete to ensure stability.
The site is located adjacent to a designated floodway. The applicant has
indicated a twenty-five foot access easement adjacent to the floodway as
required by ordinance. There is a question concerning Lots 13 and 20 Glen
Valley Phase 2 with regard to buildability. Lot 13 appears to be located below
the 100-year flood elevation. The applicant will be required to set the floor
elevation for this lot. With the dedication of the twenty-five foot access
easement, staff questions if the building area for Lot 20 is sufficient to meet all
the required setbacks. Staff recommends the applicant furnish a buildable area
for Lot 20 on the proposed preliminary plat.
The proposed preliminary plat indicates a road right-of-way extending into the
plat area. The preliminary plat indicates Gooch Lane with a 50-foot right-of-way
along Lot 7 Glen Valley Phase I. With the indicated right-of-way and the required
setbacks, this lot appears to be limited on buildable area. Staff recommends the
applicant abandon the right-of-way or indicate the buildable area on the proposed
preliminary plat.
Lot 17 Heatherbrae Phase 3 also appears to be limited by a sewer easement.
The proposed preliminary plat indicates a sewer easement crossing the lot
diagonally across the rear, limits the buildable area for the lot. Staff would
recommend the applicant furnish the buildable area for this lot as well.
The applicant is proposing the development of this site in three phases. There
are to be 23 lots in the first phase, 7 lots in the second phase and 25 lots in the
third phase. Staff is supportive of the phasing plan.
The applicant has indicated Highlander Drive to end in a %2 cul-de-sac. Staff is
not supportive of this design. Staff feels the proposed % cul-de-sac is not
adequate to allow trucks to turn around. Staff feels the design should be a
hammerhead and the extension of the hammerhead into the access easement
for the drainage channel is acceptable.
To staff's knowledge there are no other outstanding issues associated with the
proposed request. The proposed development will be constructed at 3.57 units
per acres. Staff feels the proposed subdivision should have minimal to no
adverse impact on the surrounding area.
STAFF RECOMMENDATION:
1. Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
r
u
FILE NO.: S-1397 (Cont.
2. Staff recommends approval of the requested variance to allow Lots 1 and 2
Glen Valley Phase I to develop with a reduced minimum lot width.
3. Staff recommends approval of the requested variance to allow Lots 1 and 2 of
Glen Valley Phase I to develop with a reduced minimum lot area.
4. Staff recommends the applicant furnish buildable area for Lot 7 Glen Valley
Phase I, Lot 17 Glen Valley Phase 2 and Lot 23 of Heatherbrae Phase 3.
5. Staff recommends the channel be constructed of reinforced concrete.
6. Staff recommends Highlander Drive be constructed with a hammerhead
turnaround.
PLANNING COMMISSION ACTION: (SEPTEMBER 4, 2003)
Mr. James Dreher was present representing the request. There were objectors present.
Staff presented the item with a recommendation of approval. Staff presented a
recommendation of approval of the requested variance to allow Lots 1 and 2 Glen
Valley Phase I to develop with a reduced minimum lot width and the requested variance
to allow Lots 1 and 2 of Glen Valley Phase I to develop with a reduced minimum lot
area.
Mr. Jim Nettles addressed the Commission with questions. He stated he owned the
property to the south Highland Drive. He stated he and the owner had agreed that
access to this site could be taken from Highlander Drive and was requesting the
Commission make this a condition of approval,
Staff stated typically the only time the Commission required an applicant provide access
to an adjoining property was when the parcel was land locked. Staff stated this was not
the case Mr. Nettles had access to his site from Taylor Loop Road.
Mr. Gary Drawbaugh addressed the commission with questions, He stated his concern
was the right-of-way indicated on the site plan for Gooch Drive. He stated he and his
neighbors would like the right-of-way abandoned as a part of the development. He also
stated there were drainage concerns. He stated if the site were developed without
proper drainage then the residents of Gooch Drive .would be severely impacted. He
stated the proposed development should be designed to allow the water to flow freely.
Mr. Dan Myers addressed the Commission with questions. He stated his concern was
also drainage and how the developer would address the issue.
Mr. Arthur Lee Jones addressed the Commission with concerns. He stated his home
was located at 4309 Glen Valley Drive. He stated is primary concern was the increased
traffic in the area. He stated all the traffic from Heatherbrae only had one exit. He
stated to add an additional 55 lots was a major concern.
Mr. Lee stated water was also a concern. He stated there were occasion when property
owners were evacuated from their homes in the Heatherbrae Subdivision because the
drainage was not adequate.
A
FILE NO.: S-1397 (Cont.
Mr. Dale Woodall addressed the Commission. He stated he was neutral. He stated his
concern was the existing situation on Gooch Drive and the garbage trucks. He stated
currently the trucks were utilizing a vacant lot to turn around but the lot had sold and a
new home was under construction. He stated one solution would be to allow a portion
of the existing right-of-way to be a turn around for the Gooch Drive.
Mr. Tom Deluca addressed the Commission in opposition of the proposed request. He
stated his opposition was to the additional traffic on Glen Valley Drive. He stated when
he purchased his home he was told there would be approximately 20 additional homes
located in the proposed area. He stated now the developer was proposing 55 new
homes which was a vast difference.
Mr. Deluca questioned if access to the site could not be taken from Highway 10 at
Seven Acres Business Drive. Commissioner Rector'stated crossing the creek, which
was a designated floodway, would be cost prohibited if the Carp of Engineers would
allow the crossing.
Mr. Tom Costa addressed the Commission with concerns of traffic, drainage and
construction traffic into the neighborhood.
Mr. James Dreher addressed the Commission on behalf of the applicant. He stated the
applicant was willing to abandon the right-of-way indicated on proposed Lot 7. He
stated the lots staff questioned as far as buildable areas would be resolved through
minor lot line modifications. He stated with a slight shift the lots could be modified to
increase the buildable areas.
Mr, Dreher stated the owner was willing to allow access to the property to the south of
Highlander Drive. He stated Highlander Drive would be constructed with a
hammerhead turnaround as recommended by staff. There was a general discussion
concerning the development of the property and the access. Staff stated this was not
fair to the residents of Heatherbrae. They stated if this property was allowed access
this would increase the number of units by eight to ten thus only increasing the traffic in
the area. Staff stated the owner of the site to the south had access to Taylor Loop
Road.
There was a lengthy discussion concerning the drainage of the existing subdivision and
the proposed subdivision. Mr. Dreher stated the owner had worked with the Corp of
Engineers and secured a location for the proposed drainage channel through the site.
He stated a portion of the water which traveled through the existing subdivision would
be diverted to the new drainage channel which would relieve most of the pressure on
the existing drainage structures. Mr. Dreher stated the applicant was willing to follow
staff's recommendation that the channel be constructed of reinforced concrete.
A motion was made to approve the request as amended (the removal of the existing
right-of-way for Gooch Drive) including all variance request subject to compliance with
the conditions outlined in paragraphs ❑, E and F of the staff report. The motion carried
by a vote of 7 ayes, 1 no and 3 absent. Commissioner Floyd noted he was opposed to
the variance request only.
7
FILE NO.: S-13
NAME: Glen Valley Preliminary Plat
LOCATION: east of Gooch Road, west of Heatherbrae Phase III
DEVELOPER:
Jack Wilson and Bill Bosley
9107 Rodney Parham Road
Little Rock, AR 72203
FNGINFFR-
Civil Design Engineers, Inc.
15104 Cantrell Road
Little Rock, AR 72223
AREA: 15.4 acres NUMBER OF LOTS: 55 FT. NEW STREET: 2,267 LF
CURRENT ZONING: R-2, Single-family
PLANNING DISTRICT: 19 - Chenal
CENSUS TRACT: 42.11
VARIANCESMAIVERS REQUESTED:
1. A variance to allow a reduced minimum lot width for Glen Valley Phase I — Lots 1
and 2.
2. A variance to allow a reduced minimum lot area for Glen Valley Phase I — Lots 1
and 2.
A. PROPOSAL:
The applicant proposes to subdivide this 15.4 acre site into 58 single-family lots.
The proposal includes the development of the lots with garden style patio homes.
The lots will be developed in three phases with 23 lots in the first phase, 7 lots in
the second phase and 25 lots in the third phase. The applicant has indicated the
FILE NO.: S-1397
lots will be served by a series of residential streets (cul-de-sac's) with no outlet
being planned to Gooch Lane.
The development includes a portion of Heatherbrae Phase 3 which was
previously reviewed and approved for a preliminary plat. The applicant is
proposing to revise the previously approved plat. The revision includes a
reduction of the on -site detention area. The applicant has indicated by working
with the Corp of Engineers, the previously required detention area may be
reduced.
B. EXISTING CONDITIONS:
The site is a vacant tree covered site with a large drainage ditch extending
through the center of the site. There is a FEMA mapped floodway located along
the northern boundary of the site. The existing Glen Valley Drive dead -ends at
the proposed entrance into the subdivision.
There are single-family homes located in the area with the Heatherbrae
Subdivision located to the east and new homes being constructed on tracts on
Gooch Lane to the west. Gooch Lane does not extend into the proposed
development.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
owners abutting the proposed preliminary plat area along with the
Westchester/Heatherbrae and the Charleston Height/North Rahling Road
Neighborhood Associations were notified of the.Public Hearing.
D. ENGINEERING COMMENTS:
Public Works:
1. Glen Valley Drive should be platted as 50 foot wide right-of-way and 26 foot
of pavement with a sidewalk on one side.
2. The street names must be approved by the Special Programs section of
Public Works. Contact David Hathcock at 371-4809.
3. The curve radius on Highlander must be 75 foot minimum.
4. The curb at the cul-de-sacs must transition from curve to straight with a 20
foot minimum radius.
5. Stormwater detention from Phase 1 and 2 of Heatherbrae was deferred to
Phase 3. The proposed detention facilities appear to retain only a small
portion of the total that will be required. Provide calculations to support the
sizing of the facilities for all previous phases of Heatherbrae and the
proposed expansion.
6. The ditch and stormwater detention must be constructed with the first Phase
of the revised plat.
7. Ditch channels shall be reinforced concrete with suitable pedestrian fence
barriers. Channel size will be confirmed prior to construction.
2
FILE NO.: S-1397
8. A 25 foot access easement adjacent to the floodway is required.
9. As with the previous phases, downstream channel improvements may be
required to assure proper drainage and no standing water in the drainage
pipes and channels of the new subdivision.
10. A Sketch Grading and Drainage Plan will be required per Section 29-186 (f)
with this preliminary plat. Show the proposed grade for the lots and streets,
location of all drainage ditches and swales. A final grading permit will be
required prior to any land clearing or grading activities at the site.
11. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
12. The floodway and floodplain boundaries are based on outdated maps. Plot
the updated boundaries on the plat, showing a more detailed boundary
based on existing contours. Show the proposed finish floor elevations of
lots located in the floodplain.
13. Provide details of the design and function of the flow control structure. This
structure must be carefully designed to alleviate down stream drainage
problems in Phase 2.
14. Prepare a letter of pending development addressing streetlights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpott) for more information regarding street light
requirements.
15. A secondary subdivision access point to Gooch Lane would be desirable to
improve routine maintenance and emergency access.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project.
Enteray: Approved as submitted.
Center -Point EneLq : No comment received.
SBC: SBC request a ten -foot utility easement located at the back of the right-of-
way on all lots. Contact SBC (Charles McDonald) at 373-5112 for additional
details.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A water main extension will
be required in order to provide service to this property. A Capital Investment
Charge based on the size of the meter connection(s) will apply to this project
in addition to normal charges. This development will have minor impact on
existing water distribution system. Proposed water facilities will be sized to
provide adequate pressure and fire protection.
3
FILE NO.: S-1397 Cont.
Fire Department: Increase the 40-foot radius to 45-feet. Place fire hydrants per
code. Contact the Little Rock Fire Department"at 918-3752 for additional details.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT:
(August 14, 2003)
Mr. Bill Dean and Mr. James Dreher were present representing the request.
Staff stated the request was to allow the subdivision of 15.69 acres into 55
single-family lots. Staff noted there were additional items that needed to be
shown of the proposed preliminary plat. Staff requested the linear feet of internal
street, the average size of the lots, the minimum lots size and the names of
recorded subdivisions abutting the plat area be indicated on the preliminary plat.
Staff also noted there were several lots that did not appear to be buildable lots
once all the required setbacks were placed on the lots. Staff suggested the
applicant review the lots and if necessary request variances for reduced front
platted building line and for reduced rear yard setbacks.
Public Works comments were addressed. Staff stated the request was an
extension of the Heatherbrae Subdivision. Staff also noted all the detention for
Heatherbare was deferred to this Phase. Staff questioned if the proposed
detention was adequate to handle the stormwater runoff. Staff requested the
applicant provide details of the design and function of the flow control structure.
Staff stated the structure should be carefully designed to alleviate down stream
drainage problems.
Staff suggested the applicant secure a second entrance into the subdivision.
There was a limited discussion concerning the second access point suggested
off Gooch Lane. Staff stated the residents did not consider Gooch Lane a
publicly dedicated street.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to staff addressing most of the
issues raised at the August 14, 2003 Subdivision Committee meeting. The
applicant has indicated the minimum lot size of the development at 55.8-feet by
4
FILE NO.: S-1397 Cont.
120-feet and the average lot size of 60-feet by 120-feet. The applicant has also
indicated the names of the abutting subdivisions and the zoning classification.
The applicant has indicated Lots 1 and 2 of Glen Valley Phase I will require
variances from the Subdivision Ordinance. The applicant has indicated a
variance will be required for the minimum lot width requirement (minimum
required 60-feet) and the minimum lot area (minimum 7,000 square feet required)
for these lots.
The applicant has indicated the detention area as requested by Public Works.
The applicant has indicated the channel to be constructed of block. Staff is not
supportive of this request. Staff feels the channel should be constructed of
reinforced concrete to ensure stability.
The site is located adjacent to a designated floodway. The applicant has
indicated a twenty-five foot access easement adjacent to the floodway as
required by ordinance. There is a question concerning Lots 13 and 20 Glen
Valley Phase 2 with regard to buildability. Lot 13 appears to be located below
the 100-year flood elevation. The applicant will be required to set the floor
elevation for this lot. With the dedication of the twenty-five foot access
easement, staff questions if the building area for Lot 20 is sufficient to meet all
the required setbacks. Staff recommends the applicant furnish a buildable area
for Lot 20 on the proposed preliminary plat.
The proposed preliminary plat indicates a road right-of-way extending into the
plat area. The preliminary plat indicates Gooch Lane with a 50-foot right-of-way
along Lot 7 Glen Valley Phase I. With the indicated right-of-way and the required
setbacks, this lot appears to be limited on buildable area. Staff recommends the
applicant abandon the right-of-way or indicate the buildable area on the proposed
preliminary plat.
Lot 17 Heatherbrae Phase 3 also appears to be limited by a sewer easement.
The proposed preliminary plat indicates a sewer easement crossing the lot
diagonally across the rear, limits the buildable area for the lot. Staff would
recommend the applicant furnish the buildable area for this lot as well.
The applicant is proposing the development of this site in three phases. There
are to be 23 lots in the first phase, 7 lots in the second phase and 25 lots in the
third phase. Staff is supportive of the phasing plan.
The applicant has indicated Highlander Drive to end in a '/2 cul-de-sac. Staff is
not supportive of this design. Staff feels the proposed '/2 cul-de-sac is not
adequate to allow trucks to turn around. Staff feels the design should be a
hammerhead and the extension of the hammerhead into the access easement
for the drainage channel is acceptable.
To staffs knowledge there are no other outstanding issues associated with the
proposed request. The proposed development will be constructed at 3.57 units
per acres. Staff feels the proposed subdivision should have minimal to no
adverse impact on the surrounding area.
1. STAFF RECOMMENDATION:
1. Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
5
FILE NO.: S-1397 (Cont.
2. Staff recommends approval of the requested variance to allow Lots 1 and 2
Glen Valley Phase I to develop with a reduced minimum lot width.
3. Staff recommends approval of the requested variance to allow Lots 1 and 2 of
Glen Valley Phase I to develop with a reduced minimum lot area.
4. Staff recommends the applicant furnish buildable area for Lot 7 Glen Valley
Phase I, Lot 17 Glen Valley Phase 2 and Lot 23 of Heatherbrae Phase 3.
5. Staff recommends the channel be constructed of reinforced concrete.
6. Staff recommends Highlander Drive be constructed with a hammerhead
turnaround.
PLANNING COMMISSION ACTION: (SEPTEMBER 4, 2003)
Mr. James Dreher was present representing the request. There were objectors present.
Staff presented the item with a recommendation of approval. Staff presented a
recommendation of approval of the requested variance to allow Lots 1 and 2 Glen
Valley Phase I to develop with a reduced minimum lot width and the requested variance
to allow Lots 1 and 2 of Glen Valley Phase I to develop with a reduced minimum lot
area.
Mr. Jim Nettles addressed the Commission with questions. He stated he owned the
property to the south Highland Drive. He stated he and the owner had agreed that
access to this site could be taken from Highlander Drive and was requesting the
Commission make this a condition of approval.
Staff stated typically the only time the Commission required an applicant provide access
to an adjoining property was when the parcel was land locked. Staff stated this was not
the case Mr. Nettles had access to his site from Taylor Loop Road.
Mr. Gary Drawbaugh addressed the commission with questions. He stated his concern
was the right-of-way indicated on the site plan for Gooch Drive. He stated he and his
neighbors would like the right-of-way abandoned as a part of the development. He also
stated there were drainage concerns. He stated if the site were developed without
proper drainage then the residents of Gooch Drive .would be severely impacted. He
stated the proposed development should be designed to allow the water to flow freely.
Mr. Dan Myers addressed the Commission with questions. He stated his concern was
also drainage and how the developer would address the issue.
Mr. Arthur Lee Jones addressed the Commission with concerns. He stated his home
was located at 4309 Glen Valley Drive. He stated is primary concern was the increased
traffic in the area. He stated all the traffic from Heatherbrae only had one exit. He
stated to add an additional 55 lots was a major concern.
Mr. Lee stated water was also a concern. He stated there were occasion when property
owners were evacuated from their homes in the Heatherbrae Subdivision because the
drainage was not adequate.
A
FILE NO.: S-1397 (Cont.
Mr. Dale Woodall addressed the Commission. He stated he was neutral. He stated his
concern was the existing situation on Gooch Drive and the garbage trucks. He stated
currently the trucks were utilizing a vacant lot to turn around but the lot had sold and a
new home was under construction. He stated one solution would be to allow a portion
of the existing right-of-way to be a turn around for the Gooch Drive.
Mr. Tom Deluca addressed the Commission in opposition of the proposed request. He
stated his opposition was to the additional traffic on Glen Valley Drive. He stated when
he purchased his home he was told there would be approximately 20 additional homes
located in the proposed area. He stated now the developer was proposing 55 new
homes which was a vast difference.
Mr. Deluca questioned if access to the site could not be taken from Highway 10 at
Seven Acres Business Drive. Commissioner Rector stated crossing the creek, which
was a designated floodway, would be cost prohibited if the Corp of Engineers would
allow the crossing.
Mr. Tom Costa addressed the Commission with concerns of traffic, drainage and
construction traffic into the neighborhood.
Mr. James Dreher addressed the Commission on behalf of the applicant. He stated the
applicant was willing to abandon the right-of-way indicated on proposed Lot 7. He
stated the lots staff questioned as far as buildable areas would be resolved through
minor lot line modifications. He stated with a slight shift the lots could be modified to
increase the buildable areas.
Mr. Dreher stated the owner was willing to allow access to the property to the south of
Highlander Drive. He stated Highlander Drive would be constructed with a
hammerhead turnaround as recommended by staff. There was a general discussion
concerning the development of the property and the access. Staff stated this was not
fair to the residents of Heatherbrae. They stated if this property was allowed access
this would increase the number of units by eight to ten thus only increasing the traffic in
the area. Staff stated the owner of the site to the south had access to Taylor Loop
Road.
There was a lengthy discussion concerning the drainage of the existing subdivision and
the proposed subdivision. Mr. Dreher stated the owner had worked with the Corp of
Engineers and secured a location for the proposed drainage channel through the site.
He stated a portion of the water which traveled through the existing subdivision would
be diverted to the new drainage channel which would relieve most of the pressure on
the existing drainage structures. Mr. Dreher stated the applicant was willing to follow
staff's recommendation that the channel be constructed of reinforced concrete.
A motion was made to approve the request as amended (the removal of the existing
right-of-way for Gooch Drive) including all variance request subject to compliance with
the conditions outlined in paragraphs D, E and F of the staff report. The motion carried
by a vote of 7 ayes, 1 no and 3 absent. Commissioner Floyd noted he was opposed to
the variance request only.
rl