ITEM NO.: 5
NAME: Lot 2 Geneva Industrial Subdivision Site Plan Review
LOCATION: 6524 Geyer Springs Road
Planning Staff Comments:
May 22, 2003
FILE NO.: S-1384
1. Provide notification of property owners located within 200-feet of the
proposed development complete with the certified abstract list, notice form
with affidavit executed and proof of mailing.
2. Provide details of any proposed fencing (height/material).
3. Relocate the dumpster to the north (and parking) out of the easement and
provide a note concerning screening.
4. Provide details of the gate operation. Will the site be accessed via a keypad,
provide the location of the keypad. Will customers be crossing traffic to
access the office? Provide a location for a break in the fence, if there is one,
to allow foot traffic into the site.
5. Provide details on building construction materials and roof materials.
6. Provide the maximum building height in the General Notes Section of the site plan.
7. Provide the days and hours of operation. Will the site have 24-hour access.
8. Will there be an on -site manager?
�? V� Variance/Waivers:
1. A variance to allow a reduced side yard and rear yard setback.
L
Public Works:
1. Repair or replace any curb and gutter or sidewalks that is damaged in the public
right-of-way prior to occupancy.
2. A grading permit in accordance with Section 29-186(c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
3. Storm water detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
4. Show the current right-of-way width and locations on the plan. A minimum
dedication of right-of-way 45 feet from centerline will be required.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: Approved as submitted.
Central Arkansas Water: A Capital Investment Charge based on the size of the meter
connection(s) will apply to this project in addition to normal charges. This fee will apply
to all meter connections including any metered connections off the private fire system.
The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private hydrant(s) are required, they will be installed at the
Developer's expense. All Central Arkansas Water requirements in effect at the time of
request for water service must be met. This development will have minor impact on
existing water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. Contact Central Arkansas Water at 992-2438 for
additional details.
Fire Department: Contact the Little Rock Fire Department at 918-3752 for details
concerning turning radius around buildings. Place fire hydrants per code.
County Planning: No comment received.
CATA: No comment received.
Planning Division: No comment.
Landscape: Areas set -aside for buffers and landscaping meet with ordinance
requirements.
An irrigation system to water landscaped areas will be required.
Prior to obtaining a building permit, it will be necessary to provide a landscape plans
stamped with the seal of a Registered Landscape Architect.
Revised plat/plan: Submit four (4) copies of a revised site plan (to include the
additional information as noted above) to staff on Wednesday, May 28, 2003.
June 12, 2003
L
ITEM NO.: 5
NAME: Lot 2 Geneva Industrial Subdivision Site Plan Review
LOCATION: 6524 Geyer Springs Road
DEVELOPER:
B & R Rentals
6524 Geyer Springs Road
Little Rock, AR 72209
McGetrick and McGetrick Engineers
319 President Clinton Avenue, Suite 202
Little Rock, AR 72201
AREA: 3.03 acres NUMBER OF LOTS: 1
CURRENT ZONING: 1-2, Industrial
LANNING DISTRICT: 13 — 65th Street East
CENSUS TRACT: 20.02
VARIANCES/WAIVERS R
A. PROPOSAL:
FILE NO.: S- 1384
FT. NEW STREET: 0
UESTED: A reduced rear yard setback.
The site contains an existing office/warehouse and the applicant propose the
placement of four (4) buildings totaling 30,000 square feet of mini -warehouse on
the rear of the lot. The developer will allow the rear of the eastern most building
to act as screening. The remainder of the site will be fenced with an eight (8)
foot chain link fence.
The drive from the existing development will be extended to service this area and
the applicant proposes the placement of concrete to serve as drives between the
buildings.
The development will be constructed in three phases. With the office and 7,900
square feet of mini -warehouse being constructed in the first phase. In the
second phase 6,900 square feet of mini -warehouse will be added and the third
and final phase will add two rows of buildings and 15,200 square feet of mini -
warehouse.
June 12, 2003
SUBDIVISION
ITEM NO.: 5 FILE NO.: S- 1384
The applicant is proposing the western most building to be located ten (10) feet
from the rear property line. This will require a variance from the Zoning
Ordinance to allow a reduced rear yard setback from the typical 25-foot rear yard
setback.
B. EXISTING CONDITIONS:
The site contains an existing office/warehouse building with a loading dock
located on the south side of the building. The rear of the lot is vacant and grass
covered with a large detention pond located near the end of the existing drive.
Other uses in the area include officelwa rehouse activities along Geyer Springs
and 65 Street. Located west of the site is a large mini -warehouse development
accessed from 65t" Street. The Sear Service Center is located to the south of
the site. The area is primarily zoned 1-2 and/or C-3, General Commercial with
the exception of areas, which have not been rezoned and are functioning as non-
conforming uses located along 65t" Street and Geyer Springs Road.
C. NEIGHBORHOOD COMMENTS:
Southwest United for Progress, the Geyer Springs Neighborhood Association
and the Wakefield Neighborhood Association were notified of the Public Hearing
along with all owners of property located within 200-feet of the site. As of this
writing, staff has not received any comment from area residents.
D. ENGINEERING COMMENTS:
Public Works:
1. Repair or replace any curb and gutter or sidewalks that is damaged in the
public right-of-way prior to occupancy.
2. A grading permit in accordance with Section 29-186(c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
3. Storm water detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
4. Show the current right-of-way width and locations on the plan. A minimum
dedication of right-of-way 45 feet from centerline will be required.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point_ Energy: Approved as submitted-
2
June 12, 2003
SUBDIVISION
ITEM NO.5 FILE NO.: S- 1384
SBC: Approved as submitted.
Central Arkansas Water: A Capital Investment Charge based on the size of the
meter connection(s) will apply to this project in addition to normal charges. This fee
will apply to all meter connections including any metered connections off the private
fire system. The Little Rock Fire Department needs to evaluate this site to
determine whether additional public and/or private hydrant(s) are required; they will
be installed at the Developer's expense. All Central Arkansas Water requirements in
effect at the time of request for water service must be met. This development will
have minor impact on existing water distribution system. Proposed water facilities
will be sized to provide adequate pressure and fire protection. Contact Central
Arkansas Water at 992-2438 for additional details.
Fire Department: Contact the Little Rock Fire Department at 918-3752 for details
concerning turning radius around buildings. Place fire hydrants per code.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: Areas set -aside for buffers and landscaping meet with ordinance
requirements.
An irrigation system to water landscaped areas will be required.
Prior to obtaining a building permit, it will be necessary to provide a landscape
plans stamped with the seal of a Registered Landscape Architect.
G. SUBDIVISION COMMITTEE COMMENT: (May 22, 2003)
Mr. Pat McGetrick was present representing the applicant. Staff briefly described
the proposed project indicating to Mr. McGetrick there were additional items
needed to be shown on the proposed site plan. Staff stated the dumpster was
shown in an easement and requested Mr. McGetrick relocate the dumpster to the
north outside the easement.
Staff also requested Mr. McGetrick indicate on the site plan the proposed fencing
material and height. Staff questioned how customers would enter the site and if
there would be a keypad where the key pad would be located. Staff questioned
if the facility would have 24-hour access and the type security that would be used
for the site.
3
June 12, 2003
SUBDIVISION
ITEM NO.: 5
H.
FILE NO.: S- 1384
Public Works comments were addressed. Staff stated the applicant would be
required to repair any broken curb and gutter or sidewalks prior to occupancy.
Staff also stated stormwater detention did apply to the project and the applicant
had not located the detention facility on the proposed site plan. Staff requested
Mr. McGetrick indicate the location for review.
Landscaping comments were addressed. Staff stated irrigation would be
required for the site. Staff also stated the areas set aside for buffers and
landscaping appeared to meet with ordinance requirements.
Staff noted the comment from the Fire Department and requested Mr. McGetrick
contact them directly concerning the turning radius around the buildings for the
development.
There were no additional comments for discussion. The Committee then
forwarded the item to the full Commission for final action.
ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the concerns
raised by staff at the Subdivision Committee meeting on May 22, 2003. The
applicant has worked with the Fire Department to resolve the issue of turning
radius around the buildings and has located the detention facility on the site plan.
The applicant has also indicated the fencing will be chain link eight feet in height.
This request complies with the fencing height allowable on industrially zoned
property.
The applicant has indicated the site will have 24-hour access but will not have an
on -site manager until fully developed. The normal hours of operation will be from
7:00 am to 7:00 pm daily. The applicant has stated the gate will be electronically
monitored through the entrance codes to determine persons accessing the site at
any given time.
The applicant has indicated compliance with the Stormwater Detention
Ordinance. The applicant has stated water will be collected and piped to
underground detention.
The proposed request is a multiple building site plan review to add four (4)
buildings to the site. The applicant is requested a reduced rear yard setback.
The request is to allow a ten (10) foot setback. The typical setback per the
Zoning Ordinance is 25-feet. The request to allow a reduced rear yard setback
should have no impact an the area. The remainder of the building placement
complies with normal building setbacks per the Zoning Ordinance for industrially
zoned property and the applicant has met all the other technical requirements of
the ordinance.
0
June 12, 2,003
SUBDIVISION
ITEM NO.: 5 (con't.
FILE NO.: S- 1384
Staff feels the proposed development should have minimal to no adverse impact
on the area since the use is consistent with development in the area. The area is
primarily used for non-residential uses and industrial activities. The applicant
proposes the placement of the units on the rear of the existing lot and mini -
warehouse is a by -right use on 1-2 zoned property. There are mini -warehouse
units located to the west of this site and a large warehouse building located to the
south.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request as filed subject to compliance with the
conditions outlined in paragraphs ❑, E and F of this report.
PLANNING COMMISSION ACTION:
(JUNE 12, 2003)
Mr. Pat McGetrick of McGetrick and McGetrick Engineers was present representing the
application. There were no objectors present. Staff stated they had received one letter
of opposition of the proposed development. Staff stated to their knowledge there were
no outstanding issues associated with the request. Staff presented a recommendation
of approval of the request as filed subject to compliance with the conditions outlined in
paragraphs D, E and F of the above report.
Staff presented a recommendation of approval of the requested reduced rear yard
setback variance request.
There was no further discussion of the item. The Chair placed the item on the consent
agenda for approval. The motion carried by a vote of 10 ayes, 0 noes and 1 absent.