HomeMy WebLinkAboutS-1358-B ApplicationCIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: t
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
1
Engineering Specialist Date:_% 1 O
/.t)6
ADDRESSING SPECIALIST'S REPORT
ave revie e e plat
d th a street names and street configuration are acceptable.
Addressing Specialist Date: 2XI
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
-Pb! ng'Q v
ENGINEER REPORT
Traffic Engineer Date:
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied.
Civil Engineer I/II Date: Z.o
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All requiremen i pUtaDproval have been satisfied. �.
Surveyor Date: '7. Q
r�
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
Design Review Engineer/Civil Engineering Manager
July 2005
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: 4 i 4 Nate-V e tr* S v g V "f'2 ^/
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
t' Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date: % 1
ADDRESSING SPECIALIST'S REPORT
I ave revie a plat d th 'e street names and street configuration are acceptable.
Addressing Specialist Date:
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Pb ne'Q..'O 1y Traffic Engineer
ENGINEER REPORT
I have reviewed the file for this matter and find that:
Date:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied.
�
4'�L Civil Engineer I/II Date: —7I2A"
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All requiremen I p roval have been satisfied.
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied. Date: `71
Q-cl/C�e
Design Review Engineer/Civil Engineering Manager
July 2005
Date: '7 (�
L
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME HICKORY GROVE PHASE 2
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Dale; 7 2-0) t 4
ADDRESSING SPECIALIST'S REPORT
1 !ave2re wed d th he street names and street configuration are acceptable.
Addressing Specialist Date: �v a OCR
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for
billing to developer:
Certain improvements remain uncompleted and a punch list has been prepared and sent.
NOT 9ZOLl,OUZD Traffic Engineer Date:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:.
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied.
Civil Engineer 1/I1 Date: '7 Zm Dlr p
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All requireme - Final Iat approval have been satisfied.
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
Date:
71Z-1c�(,
Design Review Engineer/Civil Engineering Manager
July 2005
Date:
City of Little Rock
Planning and Development
Filing Fees
Date: /�12.-)�, 20 0 (,-
Annexation
Board of Adjustment
Cond. Use Permit/T.J.P.
Final Plat
Planned Unit Dev.
Preliminary Plat
Special Use Permit
Rezoning
Site Plans
Street Name Change
Street Name Signs
Number at ea.
Public Hearing Signs
Numbef at ea.
Total
File No.
Location a \ tf-f-k(..
Apply17
BY 71,7 + �L-. -------`--�