Planning Staff Comments:
l . Provide a certified list of abutting property owners along with notice form with affidavit executed
and proof of mailing.
2. Show vicinity map to scale and directionally oriented on the site plan.
3. Label sidewalks.
4. Provide a legal description of the total site proposed for development, including a statement of
present and proposed ownership and present and proposed zoning.
5. Will there be a ground -mounted sign? If so show on the site plan with details. (height and area).
6. Will there be a dumpster on the site? If so, show on the site plan with required screening (3 sides
with 8' high opaque fence or wall).
7. Any site lighting must be low-level and directed away from residentially zoned property.
8. What is the element between the two buildings? Is this a heated and cooled walkway?
9. Is parking to be phased or entirely developed with Phase I? Indicate in the general notes.
10. Indicate on the site plan the distance between the two buildings.
11. Provide days and hours of operation.
12. Estimate the number of employees.
13. Provide the building height on the site plan.
14. Provide details on how the 50' open space buffer will be protected during construction.
Variance/Waivers: None requested.
Public Works-
1. Aldersgate Road is classified on the Master Street Plan as a commercial street. Dedication of right -of
way to 30 feet from centerline will be required.
2. 16"' Street is classified on the Master Street Plan as a commercial street. Dedication of right-of-way to
30 feet from centerline will be required; alternatively, show proof it is closed, or petition to close.
3. Provide design of street conforming to "MSP" (Master Street Plan). Constrict one-half street
improvement to these streets including 5-foot sidewalks with planned development.
4. Driveways shall conform to Sec. 3 1-2 10 or Ordinance 18,031.
5. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
6. Stormwater detention ordinance applies to this property.
7. A Sketch Grading and Drainage Plan is required prior to subdivision committee meeting, or no later
than 5 days before Planning Commission hearing.
8. A grading permit will be required on this development.
9. This development involves issues related to street lighting. The property owner may be responsible for
installation of new street lights or modification (if required) of existing street lights. Property owner
must contact Traffic Engineering (Steve Philpott @ 340-4880) to verify street lighting requirements for
this project.
10. Current ordinances prohibit cross access within 75 feet (from the curb -line) of the main driveway.
Access to Lot 12C must be moved further back to prevent a 4-legged intersection within 75 feet of the
driveway.
11. Include parking in adjacent lot in the access easement.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required with easements if service is required for project. Contact Jim
Boyd at 376-2903 for details.
Page 2
Lot 12B, Baptist Health Kanis South Addition Subdivision Site Plan Review (S-1333)
ENTERGY: No comment received.
ARKLA: No comment received.
Southwestern Bell: A side easement will provide better access. (Adjacent to the north property line.)
Contact M. Baker at 373-5112 for details.
Water: If there are facilities that need to be adjusted and/or relocated, Contact Central Arkansas Water.
That work would be done at the expense of the developer. Contact Marie Dugan at 992-2438
for details.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: Project site is located on Bus Route #3 but has no effect on bus radius, turnout and route.
Planning Division: No comment.
Landscape: Areas set aside for buffers and landscaping meet with ordinance requirements when averaged out.
However, most of the street buffer along Aldersgate Road drops below the full requirement
(without the transfers allowed) of 18.2 feet by 7.7 feet.
An irrigation system to water landscaped areas is required.
Submit 4 copies of the revised site plan (to include the additional information as noted above) to staff no later
than Wednesday, December 12, 2001.
January 3, 2002
ITEM NO.: 16
FILE NO.: 5-1333
NAME: Lot 12B, Baptist Health Kanis South Addition Subdivision
Site Plan Review
LOCATION: East side of Aldersgate Road approximately 1000 feet
South of Kanis Road
DEVELOPER:
RWrTNF.F.R
Aldersgate Property, LLC White, Daters & Associates
10825 Financial Center Parkway 24 Rahling Circle
Little Rock, AR 72211 Little Rock, AR 72223
AREA: 1.31 Acre NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: 0-3
PROPOSED ZONING: 0-3
ALLOWED USES: Office
PROPOSED USE: Office
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant proposes the construction of two office
buildings (5860 square feet each) in two phases. The
parking for the development will also be phased. Upon
completion of the development, the buildings will be
connected by an open, covered walkway. There are
37 parking spaces proposed for Phase I and 16 parking
spaces proposed for Phase II.
January 3, 2002
SUBDIVISION
ITEM NO.: 16 (Cont.)
B. EXISTING CONDITIONS:
FILE NO.: S-1333
The site is heavily wooded, as is the area to the north and
east. An office building is currently under construction
on the land adjacent to the south. The area to the west
contains multiple uses ranging from single-family to large
office buildings. Other uses in the area include, Sound
Security, Ortho Arkansas, Arkansas Baptist and a Little
Rock Police Substation.
C. NEIGHBORHOOD COMMENTS:
As of this writing staff has received no comment from the
neighborhood. All property owners within 200 feet of the
site and the John Barrow Neighborhood Association, the Twin
Lakes A Neighborhood Association, the Twin Lakes "B"
Property Owners Association and the Twin Lakes B Special
Improvement District were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Aldersgate Road is classified on the Master Street Plan
as a commercial street. Dedication of right-of-way to 30
feet from centerline will be required.
2. Provide design of street conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
the street including 5-foot sidewalk with the planned
development.
3. Driveways shall conform to Sec. 31-210 or Ordinance
18,031.
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
5_ Stormwater detention ordinance applies to this property.
6. A Sketch Grading and Drainage Plan is required prior to
Subdivision Committee meeting, or no later than 5 days
before Planning Commission hearing.
7. A grading permit will be required o
8. This development involves issues
lighting. The property owner may
installation of new streetlights
required) of existing streetlights
contact Traffic Engineering (Steve
this development.
related to street
be responsible for
or modification (if
Property owner must
Philpott @ 340-4880)
2
January 3, 2002
SUBDIVISION
ITEM NO.: 16 (Cont.) FILE NO.: S-1333
to verify street lighting requirements for this project.
9. Current ordinances prohibit cross access within 75 feet
(from the curb -line) of the main driveway. Access to
Lot 12C must be moved further back to prevent a 4-legged
intersection within 75 feet of the driveway.
10. Include parking in adjacent lot in the access easement.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if
service is required for project. Contact Jim Boyd at
376-2903 for details.
Entergy: No comment received.
ARKLA: No comment received.
Southwestern Bell: A side easement will provide better
access. (Adjacent to the north property line.) Contact
M. Baker at 373-5112 for details.
Water: If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That
work would be done at the expense of the developer.
Contact Marie Dugan at 992-2438 for details.
Fire Department: Approved as submitted.
CounLy Plannin : No comment received.
CATA: Project site is located on Bus Route # 3 but has no
effect on bus radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division: No Comment.
City Recognized Neighborhood Action Plan:
The applicant's property lies in the area covered by the
John Barrow Neighborhood Action Plan. The plan list the
following Goal concerning redevelopment in the area:
Enhance the business climate directed toward encouraging
new business and commercial establishments to located in
the area as well as retention of existing businesses.
3
January 3, 2002
SUBDIVISION
ITEM NO.: 16 (Cont.)
Landscape Issues:
FILE NO.: S-1333
Areas set -aside for buffers and landscaping meet with
ordinance requirements when averaged out. However, most of
the street buffer along Aldersgate Road drops below the
full requirement (without the transfers allowed) of 18.2
feet by 7.7 feet.
An irrigation system to water landscaped areas is required.
Building Codes: No comment received.
G. SUBDIVISION COMMITTEE COMMENT: (December 6, 2001)
Joe White was present
briefly described the
Staff noted that som
needed (days and ho,
lighting plan) . St<
necessary indicating
adjacent to the south
representing the application. Staff
subdivision site plan review request.
additional project information was
irs of operation, building heights,
Lff also noted a detailed plan was
how the 50-foot open space buffer
property line would be protected.
Tad Borkowski, Public Works Staff, indicated the street
improvements to Aldersgate Road must conform to Master
Street Plan design standards. He also stated a grading
permit would be required for the development and the
applicant should submit a sketch grading and drainage plan
no later than five days prior to the public hearing.
Mr. Borkowski indicated his concern with regard to the
parking lot design. He stated consideration should be
given to the parking lot entrance from Aldersgate Road.
Mr. White stated the proposal was a three-way stop with the
traffic existing Aldersage Road into the parking lot always
having the right-of-way.
Mr. Bob Brown, Planning Staff, stated the area set -aside
for buffers and landscaping met the requirements of the
ordinance when averaged. He stated, with the transfer
allowance, the street buffer along Aldersgate Road would
meet the minimum ordinance requirements.
Mr. White indicated he would provide all the information
requested of staff.
4
January 3, 2002
SUBDIVISION
ITEM NO.: 16 (Cont.
FILE NO.: S-1333
After the discussion, the Committee forwarded the site plan
review to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff noting
most of the concerns raised by staff and the Subdivision
Committee. The days and hours of operation are proposed to
be from 8:30 am to 5:30 Monday through Thursday and 8:30 to
4:00 pm on Friday. The applicant estimates there will be
15 employees per phase. The building heights will be no
more than 30-feet which has been indicated on the site
plan.
The applicant has indicated the Phasing Plan for the
buildings and the parking. In Phase I, the applicant
proposes to construct a 5860 square foot building along
with 37 parking spaces. The minimum parking spaces
required for this phase would be 15 parking spaces. The
second phase will also include a 5860 square foot building,
with the addition of 16 parking spaces. The total number
of parking spaces required for this phase is 15 spaces.
This would bring the total number of parking spaces to 53
with the minimum number of parking spaces required for the
project to be 30 spaces. A three-way stop will control the
traffic within the parking lot and allow motorist entering
the site from Aldersgate Road the right-of-way. Staff
supports this arrangement since the site is expected to be
a low traffic generator.
There is a single ground -mounted sign proposed for the
site. The sign will be located near the driveway entrance
and is proposed to be a 4-foot high by 5-foot wide sign.
Otherwise, to staff's knowledge, there are no outstanding
issues associated with this Subdivision Site Plan Review.
The proposed site plan request for Lot 12B Baptist Health
Kanis South Addition should have no adverse impact on the
general area.
I. STAFF RECOMMENDATION:
Staff recommends approval of the site plan subject to the
following conditions:
5
January 3, 2002
SUBDIVISION
ITEM NO.: 16 (Cont.
FILE NO.: S-1333
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
PLANNING COMMISSION ACTION: (JANUARY 3, 2002)
Mr. Joe White was present representing the application. There
were no objectors present. Staff presented the item with a
recommendation of approval subject to compliance with the
conditions outlined in the "staff recommendation" above.
There was no further discussion. The item was placed on the
consent agenda and approved as recommended by staff. The vote
was 11 ayes, 0 noes and 0 absent.