HomeMy WebLinkAboutStaff AnalysisFebruary 25, 2010
ITEM NO.: 1 FILE
NAME: Kidco Lots 1 and 2 Preliminary Plat
LOCATION: Located North of Chenal Parkway and West of Kirk Road
DEVELOPER:
Bank of Little Rock
200 N. State Street
Little Rock, AR 72201
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72224
AREA: 2.06 acres
CURRENT ZONING
S-13
NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
0-2, Office and Institutional District
PLANNING DISTRICT: 19 - Chenal
CENSUS TRACT: 42.10
VARIANCES/WAIVERS REQUESTED:
1. A variance from the Zoning Ordinance (Section 36-280(e)(2)) to allow the creation of
lots with a square footage less than the 2 acre minimum square footage and to allow
the creation of lots with a lot width less than the 200-foot lot width, both as typically
required by the 0-2, Office and Institutional Zoning District.
2. A variance from the Subdivision Ordinance Section 31-284(b) to allow the creation of
a pipe stem lot and Section 31-2 to allow an increased maximum depth for the pipe
stem lot.
A. PROP 0SALiREQUEST/APPLICANT'S STATEMENT:
A preliminary plat to allow the creation of two lots from this tract was approved by
the Planning Commission at their January 17, 2002, public hearing. The
approval included a variance from the Subdivision Ordinance to allow the
creation of a pipe stem lot and to allow the length of the pipe stem to exceed
February 25, 2010
SUBDIVISION
ITEM NO.: 1 Cont. FILE NO.: S-1330-A
typical ordinance standards. The approval also allowed a variance from the
Zoning Ordinance related to the lot width (less than 200-feet) and the lot area
(less than 2-acres). The final plat was not executed within the time frame
required by the Subdivision Ordinance and the approval has expired. The
applicant is proposing to reestablish the previously approved preliminary plat in
the same configuration as was previously approved.
The approval of the current request would allow the subdivision of this 2.06+ acre
tract into two (2) lots. Proposed Lot 2 contains an existing daycare business that
takes access through the parking lot of the ARSYS building. The plat as
proposed indicates a 30 foot wide pipe stem extending from Kirk Road. Lot 1 is
proposed with public street frontage on Kirk Road. The setbacks for the lots are
indicated consistent with the 0-2, Office and Institutional Zoning District (25-feet
around the sites perimeters).
B. EXISTING CONDITIONS:
The area proposed as Lot 2 contains an existing daycare center and proposed
Lot 1 is vacant. The area to the south contains an auto care center approved as
a PD-C. The area to the east is undeveloped and was approved as a PCD for a
mixed -use office and retail development. Uses to the north and west of the site
are nonresidential uses, the ARSYS Building, United States Post Office, a
number of office buildings and strip commercial and office fronting Chenal
Parkway.
Street construction is currently under way for Kirk Road from Chenal Parkway to
Arkansas Systems Drive. The improvements are being installed as a part of the
approval of Fellowship Bible Church to the north and an approved PCD and POD
located to the east and northeast of this site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
abutting property owners and the Coalition of West Little Rock Neighborhoods
were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. On commercial developments, a minimum 10-foot radius should be provided
for the proposed driveway apron.
2. ADA ramps must be installed at the driveway.
3. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
K
February 25, 2010
SUBDIVISION
ITEM NO.: 1 (Cont.
E
F
FILE NO.: S-1330-A
4_ Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1805 (Travis Herbner).
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements for this project.
Contact Little Rock Wastewater Utility for additional information.
Entergy: No comment received.
Center -Point Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the Developer's expense. Please submit plans
for water facilities and/or fire protection system to Central Arkansas Water for
review. Plan revisions may be required after additional review. Contact Central
Arkansas Water regarding procedures for installation of water facilities and/or fire
service. Approval of plans by the Arkansas Department of Health Engineering
Division and Little Rock Fire Department is required. Contact Central Arkansas
Water regarding the size and location of the water meter. A Capital Investment
Charge based on the size of meter connection(s) will apply to this project in
addition to normal charges. This fee will apply to all connections including
metered connections off the private fire system.
Fire Department: Additional fire hydrants will be required. Contact the Little
Rock Fire Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Parks and Recreation: No comment received.
ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: No comment.
3
February 25, 2010
SUBDIVISION
ITEM NO.: 1 Cont. FILE NO.: S-1330-A
G. SUBDIVISION COMMITTEE COMMENT: (February 4, 2010)
Mr. Joe White of White Daters and Associates was present representing the
request. Staff presented an overview of the request stating a preliminary plat for
the site had been approved in 2002 for the site allowing the creation of two (2)
lots. Staff stated the final plat was not executed and the previous approval had
expired. Staff stated there were variances associated with the preliminary plat
including lot size, lot width and the creation of a pipe stem lot. Staff requested
Mr. White provide the source of title of the landowner in the general notes section
of the proposed preliminary plat.
Public Works comments were addressed. Staff stated a minimum 10-foot radius
was required for the proposed driveway apron and ADA ramps were required to
be installed at the new drive. Staff stated all plans for work in the right of way
would require approval from Traffic Engineering prior to the start of work.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to staff addressing the issues
raised at the February 4, 2010, Subdivision Committee meeting. The revised plat
includes the source of title of the landowner in the general notes section. A note
on the plat states all sidewalks and drives will be constructed with ADA ramps.
The request is to allow the reestablishment of a two (2) lot plat in the same
configuration as was approved by the Planning Commission on January 17,
2002. The proposed plat includes variances from the Subdivision Ordinance
(Section 31-284(b) and Section 31-2) to allow the creation of a pipe stem lot and
to allow the length of the pipe stem to exceed typical ordinance standards. The
proposed plat also includes variances from the Zoning Ordinance (Section
36-280(e)(2)) to allow the creation of a lot with a lot width less than the 200-foot
lot width and to allow the creation of a lot with acreage less than the 2 acre lot
size as typically required in the 0-2, Office and Institutional Zoning District. The
setbacks for the lots are indicated consistent with the 0-2, Office and Institutional
Zoning District (25-feet around the site's perimeters).
To staff's knowledge there are no remaining technical issues associated with the
request in need of addressing prior to the Commission acting on the request.
Staff feels the reestablishment of the plat as proposed is appropriate for the site.
ll
February 25, 2010
SUBDIVISION
ITEM NO.: 1 Cont. FILE NO.: S-1330-A
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the variance from the Zoning Ordinance (Section
36-280(e)(2)) to allow the creation of the two lots with a square footage less than
the 2 acre minimum square footage and to allow the creation of lots with a lot
width less than the 200-foot lot width, both as typically required by the 0-2, Office
and Instructional Zoning District.
Staff recommends approval of the variance request from the Subdivision
Ordinance Section 31-284(b) to allow the creation of a pipe stem lot and Section
31-2 to allow an increased maximum depth for the pipe stem lot.
PLANNING COMMISSION ACTION: (FEBRUARY 25, 2010)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the variance
from the Zoning Ordinance (Section 36-280(e)(2)) to allow the creation of the two lots
with a square footage less than the 2 acre minimum square footage and to allow the
creation of lots with a lot width less than the 200-foot lot width, both as typically required
by the 0-2, Office and Instructional Zoning District. Staff presented a recommendation
of approval of the variance request from the Subdivision Ordinance Section 31-284(b) to
allow the creation of a pipe stem lot and Section 31-2 to allow an increased maximum
depth for the pipe stem lot.
There was no further discussion of the item. The Chair entertained a motion of approval
of,the item as presented by staff. The motion carried by a vote of 9 ayes, 0 noes and
2 absent.
5
ITEM NO_- 1
NAME: Kidco Lots 1 and 2 Preliminary Plat
LOCATION: located North of Chenal Parkway and West of Kirk Road
Plannina Staff Comments:
S-1330-A
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than February 10, 2010. The Office of Planning and
Development must receive the proof of notice no later than February 19, 2010.
2. Provide the total lot area for each of the proposed lots on the proposed preliminary
plat.
3. Provide the source of title of the landowner in the general notes section of the
proposed plat.
4. Is the 30-foot access easement a part of Lot 1 or is Lot 2 being created as a pipe
stem lot?
5. The area to the south appears to be zoned PD-C and not R-2, Single-family.
Variance/Waivers:
1. A variance from the Zoning Ordinance (Section 36-280(e)(2)) to allow the creation of
lots with a square footage less than the 2 acre minimum square footage and to allow
the creation of lots with a lot width less than the 200-foot lot width, both as typically
required by the 0-2, Office and Instructional Zoning District.
2. A variance from the Subdivision Ordinance (Section 31-231) to allow the creation of
a lot without public street frontage.
Public Works Conditions:
1. On commercial developments, a minimum 10-foot radius should be provided for the
proposed driveway apron.
2. ADA ramps must be installed at the driveway.
3. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
4. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1805 (Travis Herbner).
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required with easements for this project. Contact
Little Rock Wastewater Utility for additional information.
Entergy: No comment received.
Item # 1.
Center -Point Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. The Little Rock Fire Department needs
to evaluate this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense. Please submit plans for water facilities and/or fire protection
system to Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and Little Rock Fire Department is required. Contact
Central Arkansas Water regarding the size and location of the water meter. A Capital
Investment Charge based on the size of meter connection(s) will apply to this project in
addition to normal charges. This fee will apply to all connections including metered
connections off the private fire system.
Fire Department: Additional fire hydrants will be required. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Parks and Recreation: No comment received.
Planning Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, February 10, 2010.
Item # 1.