Loading...
HomeMy WebLinkAboutS-1309 Staff AnalysisMay 31, 2001 ITEM NO.: 9 FILE NO.: S-1309 NAME: Landers - Subdivision Site Plan Review LOCATION: 3201 West 65t' Street nRVVMOPER : Lance Landers 3201 West 65t' Street Little Rock, AR 72202 AREA: 7.09 acres ZONING: I-2 SURVEYOR: White-Daters and Associates 24 Rahling Circle Little Rock, AR 72223 NUMBER OF LOTS: 1 FT. NEW STREET: 0 ALLOWED USES: Industrial PROPOSED USE: Industrial VARIANCES/WAIVERS REQUESTED: None requested. BACKGROUND: There is an existing office/warehouse building on the site which has approximately 90,000 square feet of floor area. There are areas of parking for large trucks and private passenger vehicles along the north, south and east sides of the building, with a service drive along the building's west side. The building is zoned I-2 and currently occupied by Southern Marine PWC, Inc. and Twin City Truck Company. The applicant proposes to construct a small office building near the northeast corner of the property. Therefore, a multiple building site plan is required to be reviewed by the Planning Commission. A. PROPOSAL/REQUEST: The applicant proposes to construct a 2,318 square foot building near the northeast corner of the property within an existing concrete/asphalt area. The building will be used for additional office space and be approximately 16 feet in height. The proposed site plan shows five (5) striped parking spaces on the north side of the new May 31, 2001 SUBDIVISION ITEM NO.: 9 (Corit. ) FILE NO.: 5-1309 building, which satisfies the minimum ordinance requirement for parking. Please see the attached site plan for existing and proposed building and parking locations. The applicant notes that the new office building's exterior will match the existing building. B. EXISTING CONDITIONS: As noted earlier, there is an existing industrial building on the property, with vehicular use area on the building's north, south and east sides. This general area along West 65t' Street contains a mixture: of office, commercial and industrial uses. C. NEIGHBORHOOD COMMENTS: The Wakefield, Upper Baseline and SWLR UP Neighborhood Associations were notified of the public hearing. As of this writing, staff has received a phone call from the Upper Baseline Neighborhood Association expressing no concerns with the proposed site plan. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 6. Repair or replace any curb and gutter that is damaged in the public right-of-way prior to occupancy. 7. Plans of all work in right-of-way shall be submitted for approval prior to start of work. 8. Stormwater detention ordinance applies to this property. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available, not adversely affected. Entergy: No Comment. ARKLA,: No Comment received. Southwestern Bell: No Comment. Water: Contact the Water Works if additional water service is required. Fire Department: No Comment. K May 31, 2001 SUBDIVISION ITEM NO.: 9 Mont.) County Plannin : No Comment received. FILE NO.: 5-1309 CATA: Project site is located on bus route 15. If the project is approved CATA has concerns about construction affecting the bus travel time and would like to be notified when construction will start. However, the actual project use has no effect on bus radius, turnout and route. F. ISSUES/TECHNICAL/DESIGN: Planning Division: No Comment. Landscape Issues: A small amount of building landscaping in the area of the proposed building will be required. Generally, this would be a 3-foot wide landscaped area between the public parking area and proposed structure. G. SUBDIVISION COMMITTEE COMMENT: (MAY 10, 2001) Ray Wilson was present, -representing the application. Staff briefly described the proposed site plan. Staff noted that a minimum of five (5) striped parking spaces needed to be provided for the new office building. Bob Brown, of the Planning Staff, noted that a small amount of building landscaping needed to be provided between the striped parking spaces and the new building. Mr. Wilson indicated that the site plan would be revised accordingly. After the discussion, the Committee forwarded the site plan to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised site plan to staff on May 15, 2001. The revised plan addresses the issues as raised by staff at the Subdivision Committee meeting. The revised plan shows five (5) striped parking spaces along the north side of the proposed new 2,318 square foot office building. This meets the minimum ordinance 3 May 31, 2001 SUBDIVISION ITEM NO.: 9 (Coast.) FILE NO.: S-1309 requirement for parking for the new building. The revised plan also shows a three (3) foot wide landscape strip between the striped parking and the new building as required. The proposed new office building conforms to the minimum setback and height requirements as set forth by the City's Zoning Ordinance. Therefore, there should be no outstanding issues associated with the proposed site plan. The proposed plan should have no adverse impact on the general area. I. STAFF RECOMMENDATIONS: Staff recommends approval of the site plan subject to compliance with the requirements as noted in paragraphs D, E and F of this report. PLANNING COMMISSION ACTION: (MAY 31, 2001) The staff presented a positive recommendation on this application, as there were no further issues for resolution. There were no objectors to this matter. The Chairman placed the item before the Commission for inclusion within the Consent Agenda for approval as recommended by staff. A motion to that effect was made. The motion passed by a vote of 7 ayes, 0 nays, 3 absent and 1 open position. 4